Planning application
Land At Torkington Road Hazel Grove Stockport SK7 6NW
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation and operation of a ground mounted photovoltaic (PV) solar energy generation system (solar farm) with associated infrastructure, access, landscaping and boundary treatments (RECONSULTATION - AMENDED ARBORICULTURAL REPORT AND BNG ASSESSMENT SUBMITTED)
As published by the council, reference DC/096042
Application record
- Reference
- DC/096042
- Type
- Full Application
- Status
- Registered
- Received
- 4 Jun 2025
- Validated
- 18 Jun 2025
- Ward
- Marple South & High Lane(Marp)
- Postcode
- SK7 6NW
Timeline
Dates from the published record
-
4 Jun 2025
Received by Stockport
-
18 Jun 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 13 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Stockport took a median of 51 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Lichfields Agent, registered in Newbury
Active · incorporated 2006 · Newbury
1,983 applications on PlanIndex · across 164 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
62 documents on file for this application
- UNITED UTILITIES COMMENTS
- AMENDED LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- AMENDED ARBORICULTURAL REPORT
- AMENDED BIODIVERSITY NET GAIN ASSESSMENT
- PROPOSED ACCESS PRELIMINARY DESIGN
- HIGHWAY ENGINEER COMMENTS 2
- VERY SPECIAL CIRCUMSTANCES - UPDATED
- CONSTRUCTION TRAFFIC MANAGEMENT PLAN
- PROPOSED ACCESS PRELIMINARY DESIGN
- AMENDED BIODIVERSITY NET GAIN AND ENHANCEMENT SCHEME
- AMENDED BIODIVERSITY NET GAIN METRIC
- CONSERVATION OFFICER COMMENTS
- HIGHWAYS ENGINEER COMMENTS 1
- PLANNING POLICY OFFICER (ENERGY AND CLIMATE CHANGE) COMMENTS
- UNITED UTILITIES
- ENVIRONMENTAL HEALTH OFFICER (AMENITY) COMMENTS
- GLINT AND GLARE REPORT
- EIA SCREENING OPINION BRIEFING NOTE
- ARBORICULTURAL OFFICER COMMENTS
- HIGH LANE VILLAGE NEIGHBOURHOOD FORUM COMMENTS
- ENVIRONMENTAL HEALTH OFFICER (LAND CONTAMINATION) COMMENTS
- SITE NOTICES
- SITE NOTICES
- ENVIRONMENTAL HEALTH OFFICER (AIR QUALITY) COMMENTS
- COAL AUTHORITY COMMENTS
- ENVIRONMENT AGENCY COMMENTS
- MANCHESTER AIRPORT COMMENTS
- GREATER MANCHESTER ARCHAEOLOGICAL ADVISORY SERVICE COMMENTS
- PRESS NOTICE
- HEALTH AND SAFETY EXECUTIVE COMMENTS
- PUBLIC RIGHTS OF WAY OFFICER COMMENTS
- TYPICAL GATE ELEVATION-(A3)
- PROPOSED SITE PLAN
- STANDARD CCTV SECURITY COLUMN-
- STORAGE SPARE PARTS CABIN PLANS AND ELEVATIONS
- ACCESS TRACK CROSS SECTION
- DEER FENCE
- ILLUSTRATIVE LANDSCAPE MITIGATION AND ENHANCEMENT PLAN
- PV ARRAY INDICATIVE CROSS SECTION
- MV SWITCHROOM PLANS AND ELEVATIONS
- LOCATION PLAN
- BIODIVERSITY NET GAIN ASSESSMENT AND BIODIVERSITY ENHANCEMENT SCHEME
- COVER LETTER WITH DRAWING AND DOC SCHEDULE 1
- NOISE IMPACT ASSESSMENT
- PLANNING. DESIGN AND ACCESS STATEMENT
- TRANSPORT STATEMENT
- CONSTRUCTION TRAFFIC MANAGEMENT PLAN
- FLOOD RISK SEQUENTIAL SITE ASSESSMENT
- ALTERNATIVE SITES ASSESSMENT
- AGRICULTURAL LAND CLASSIFICATION REPORT
- ECONOMIC IMPACT ASSESSMENT
- MV SUBSTATION PLANS AND ELEVATIONS
- STATUTORY BIODIVERSITY METRIC CALCULATION TOOL
- HERITAGE IMPACT ASSESSEMENT
- PHASE I GEO-ENVIRONMENTAL ASSESSMENT
- SURFACE WATER DRAINAGE STRATEGY DRAWING
- FLOOD RISK ASSESSMENT AND SURFACE WATER DRAINAGE STRATEGY
- ARBORICULTURAL IMPACT ASSESSMENT
- LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- APPLICATIONFORMREDACTED
- LOCATION PLAN
- COVER LETTER 30.05.2025(33832185.1
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Stockport for determination, against a statutory target of eight weeks. Over the last year Stockport decided full applications in a median of 95 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Pylon YV045 Hazel Knoll Farm Torkington Road Hazel Grove Stockport SK7 6NW
EE Ltd and Hutchison 3G UK Ltd intend to install 3 no.antennas at 23.25m on new support steelwork and 1 no. GPS antenna (Notification of Permitted Development)
Granted Telecoms 3 docs
Other full applications
In Stockport
-
DC/099468 Refused
Pavement O/S 35 King Street East (Corner Of Knightsbridge) Stockport SK1 1XJ
Installation of 1no. black digital communications kiosk, defibrillator and ancillary advertisement.
-
DC/099466 Refused
Pavement Outside 1-3 Merseyway Stockport SK1 1PW
Installation of 1no. black digital communications kiosk, defibrillator and ancillary advertisement.
-
DC/099470 Refused
Pavement Outside Of 53 Princes Street Stockport SK1 1SL
Installation of 1no. black digital communications kiosk, defibrillator and ancillary advertisement.
-
DC/099472 Granted
Pavement Outside Of 15 Woodford Road Bramhall Stockport SK7 1JN
Installation of 1no. black digital communications kiosk, defibrillator and ancillary advertisement.
-
DC/099482 Refused
Pavement Outside 76 High Street Cheadle SK8 1AE
Installation of 1no. black digital communications kiosk, defibrillator and ancillary advertisement