Planning application
Land At Victoria House And Fletcher Street Car Park Stockport SK1 3AD
Works: New dwelling Demolition Major scheme
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of all existing buildings and structures and erection of residential development (Use Class C3) comprising 245 dwellings, along with car and cycle parking, landscaping, and other associated works.
As published by the council, reference DC/094653
Application record
- Reference
- DC/094653
- Type
- Full Application
- Status
- Registered
- Received
- 20 Jan 2025
- Validated
- 28 Jan 2025
- Ward
- Brinnington & Stockport Central (Stck)
- Postcode
- SK1 3AD
Timeline
Dates from the published record
-
20 Jan 2025
Received by Stockport
-
28 Jan 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 25 March 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Stockport took a median of 51 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Euan Kellie Property Solutions Limited Agent, registered in Cheadle
Active · incorporated 2013 · Cheadle
247 applications on PlanIndex · across 16 councils · 92% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
149 documents on file for this application
- VICTORIA HOUSE RAMS REVC
- TRAFFIC MANAGEMENT PLAN
- TRAFFIC MANAGEMENT PLAN
- TRAFFIC MANAGEMENT PLAN
- PEDESTRIAN WALKWAY
- PROPOSED HOARDING PLAN (WEEK 3 & 4)-ARTIC
- PROPOSED HOARDING PLAN (WEEK 3 & 4)
- PROPOSED HOARDING PLAN (WEEK 3 & 4) -RIGID
- PROPOSED HOARDING PLAN (WEEK 2)
- PROPOSED HOARDING PLAN (WEEK 2) -RIGID
- PROPOSED HOARDING PLAN (WEEK 2)-ARTIC
- PROPOSED HOARDING PLAN (WEEK 1, 5 & 6)
- PROPOSED HOARDING PLAN (WEEK 1, 5 & 6)-RIGID
- PROPOSED HOARDING PLAN (WEEK 1, 5 & 6)-ARTIC
- POST DEMOLITION SITE PLAN
- UPDATED PRELIMINARY DEMOLITION PLAN
- HIGHWAYS CONSULTATION RESPONSE (DEMOLITION) 2
- DEMOLITION TRAFFIC MANAGEMENT
- SITE DEMOLITION ARRANGEMENTS
- FINAL NATURE DEVELOPMENT COMMENTS
- UPDATED CEMP
- UPDATED RAMS
- POST DEMOLITION SITE PLAN
- HIGHWAY CLOSURE SKETCH
- FINAL ENVIRONMENTAL HEALTH COMMENTS
- FURTHER NATURE DEVELOPMENT COMMENTS
- DEMOLITION SITE PLAN
- EXISTING SITE PLAN
- HIGHWAY CONSULTATION RESPONSE 1 (DEMOLITION)
- DEMOLITION_METHOD_STATEMENT
- PRELIMINARY ECOLOGICAL APPRAISAL FINAL
- UPDATED DUSK EMERGENCE BAT SURVEY
- BAT ACTIVITY REPORT
- HIGHWAY CONSULTATION RESPONSE - CONDITIONS
- HIGHWAY CONSULTATION RESPONSE 4
- PROPOSED ACCESS ARRANGEMENTS
- PROPOSED ROOF PLAN
- PROPOSED SECOND FLOOR PLAN
- PROPOSED FIRST FLOOR PLAN
- PROPOSED GROUND FLOOR PLAN
- PLANNING PROPOSED SITE PLAN
- ILLUSTRATIVE LANDSCAPE GA
- HIGHWAY CONSULTATION RESPONSE 3 - CMS
- CONSTRUCTION MANAGEMENT STRATEGY
- HIGHWAYS COMMENTS - CONSTRUCTION MANAGEMENT PLAN
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- BLOCK B BUILDING ELEVATIONS (SHEET 2)
- BLOCK B BUILDING ELEVATIONS (SHEET 1)
- BLOCK A BUILDING ELEVATIONS (SHEET 3)
- BLOCK A BUILDING ELEVATIONS (SHEET 2)
- BLOCK A BUILDING ELEVATIONS (SHEET 1)
- PROPOSED SITE ELEVATIONS (SHEET 5)
- PROPOSED SITE ELEVATIONS (SHEET 4)
- PROPOSED SITE ELEVATIONS (SHEET 3)
- PROPOSED SITE ELEVATIONS (SHEET 2)
- PROPOSED SITE ELEVATIONS (SHEET 1)
- ACCESSIBLE PARKING EVIDENCE AND COMMENTARY
- FINAL NATURE DEVELOPMENT COMMENTS
- ENERGY AND CLIMATE CHANGE COMMENTS
- STAGE 1 ROAD SAFETY AUDIT & DESIGNERS RESPONSE
- HIGHWAYS TECHNICAL NOTE 28.05.25
- DESIGN AND ACCESS STATEMENT
- TRACKING - DELIVERY 250520
- TRACKING - FLETCHER ST TESTS 250520
- TRACKING - REFUSE UPDATED 250520
- FURTHER LLFA COMMENTS
- UPDATED DRAINAGE STRATEGY
- FURTHER LLFA COMMENTS
- PUBLIC BENEFITS STATEMENT 20 MAY 2025
- HIGHWAY CONSULTATION RESPONSE
- FURTHER LLFA COMMENTS
- FURTHER CONSERVATION COMMENTS
- ENVIRONMENTAL HEALTH COMMENTS
- DRAINAGE STRATEGY
- HISTORIC ENGLAND
- TURLEY HERITAGE AND TPM RESPONSE TO HERITAGE COMMENTS
- AEW (ARCHITECT) RESPONSE TO HERITAGE COMMENTS
- UNITED UTILITIES
- HISTORIC ENGLAND
- NOISE IMPACT ASSESSMENT
- EDUCATION CONTRIBUTIONS
- PROPOSED BAY STUDIES - BLOCK A - ENTRANCE.PDF
- NATURE DEVELOPMENT COMMENTS
- CONSERVATION COMMENTS
- ARBORICULTURE COMMENTS
- LANDSCAPE PLANTING STRATEGY
- ARBORICULTURAL IMPACT PLAN
- ARBORICULTURAL IMPACT ASSESSMENT
- TFGM CONSULT
- CONTAMINATED LAND COMMENTS
- MANCHESTER AIRPORT
- HEALTH & SAFETY EXECUTIVE
- GMAAS
- LLFA FURTHER COMMENTS
- AIR QUALITY COMMENTS
- STRATEGIC HOUSING
- PRESS NOTICE
- WASTE CONSULTATION RESPONSE
- ACTIVE TRAVEL ENGLAND
- LLFA GUIDANCE FOR APPLICANT
- PLANNING STATEMENT -
- APPLICATIONFORMREDACTED
- PLANNING SITE LOCATION PLAN
- PLANNING EXISTING SITE PLAN
- PROPOSED THIRD FLOOR PLAN
- PROPOSED SEVENTH FLOOR PLAN
- PROPOSED TYPICAL 04-06 FLOOR PLAN
- PROPOSED TYPICAL 08-11 FLOOR PLAN
- PROPOSED TYPICAL 12-19 FLOOR PLAN
- PROPOSED BAY STUDIES - BLOCK A
- PROPOSED BAY STUDIES - BLOCK B
- ACCOMMODATION/AREA SCHEDULE
- EXISTING BUILDING ACCOMMODATION / AREA PLANS
- PROPOSED SECTIONS (SHEET 1)
- PROPOSED SECTIONS (SHEET 2)
- ILLUSTRATIVE 1F PODIUM GA
- ILLUSTRATIVE 7F ROOF GARDEN GA
- ILLUSTRATIVE LANDSCAPE SECTIONS
- ILLUSTRATIVE 1F PODIUM AND 7F ROOF GARDEN
- 1F PODIUM PLANTING STRATEGY
- ROOF GARDEN PLANTING STRATEGY
- RE-FORM LANDSCAPE DOCUMENT AND DRAWING REGISTER
- AIR QUALITY ASSESSMENT
- ARCHAEOLOGY REPORT FINAL
- FIRE STATEMENT
- NOISE IMPACT ASSESSMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- TV SIGNAL IMPACT SURVEY
- WIND MICROCLIMATE REPORT
- DAYLIGHT & SUNLIGHT - SURROUNDING IMPACTS REPORT
- PRELIMINARY ECOLOGICAL APPRAISAL REPORT FINAL
- CONFIRMATION OF ECOLOGICAL STATUS LETTER
- FLOOD RISK ASSESSMENT 11 SEPTEMBER 2024
- DRAINAGE STRATEGY - EXISTING DRAINED AREA PLAN
- DRAINAGE STRATEGY - PROPOSED DRAINED AREA PLAN 11 SEPTEMBER 2024
- DRAINAGE STRATEGY - BELOW GROUND DRAINAGE GA 11 SEPTEMBER 2024
- PHASE I GEO-ENVIRONMENTAL SITE ASSESSMENT - JULY 18
- PHASE II GEO-ENVIRONMENTAL SITE ASSESSMENT
- TOWNSCAPE VISUAL IMPACT ASSESSMENT
- TRANSPORT STATEMENT
- PLANNING COVERING LETTER 17 JANUARY 2025
- CRIME IMPACT STATEMENT
- ENERGY AND SUSTAINABILITY STATEMENT
- GEO-ENVIRONMENTAL ASSESSMENT REPORT
- ACCURATE VISUAL REPRESENTATION DOCUMENT
- DAYLIGHT & SUNLIGHT - APPENDICES
- BNG METRIC CALCULATION
- LANDSCAPE DESIGN & ACCESS STATEMENT
- HERITAGE STATEMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Stockport for determination, against a statutory target of eight weeks. Over the last year Stockport decided full applications in a median of 95 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Victoria House Wellington Street Stockport SK1 3AD
Prior Approval for Demolition: Proposed demolition of the vacant Victoria House office building
Withdrawn Other Demolition 40 docs -
St Petersgate Chambers 39 St Petersgate Stockport SK1 1DH
94% historically approved · decision due ~11 Sep
Proposed replacement upper floor windows and new vehicle sliding gate
Awaiting decision Heritage and listed buildings Windows or glazing 8 docs -
35 - 45 St Petersgate Stockport SK1 1DH
Application for two additional doorways, gates and fire escape
Granted Heritage and listed buildings 12 docs -
35 - 45 St Petersgate Stockport SK1 1DH
Application for two additional doorways, gates and fire escape
Granted Full applications 16 docs -
St Petersgate Chambers 39 St Petersgate Stockport SK1 1DH
88% historically approved · decision due ~17 Sep
Proposed new vehicle rear gate and replacement upper floor windows
Awaiting decision Full applications Windows or glazing 9 docs -
31-33 St Petersgate Stockport SK1 1EB
Erection of extraction flue to roof, and removal of shutters to frontage
Granted Full applications 15 docs
Other full applications
In Stockport
-
DC/099468 Refused
Pavement O/S 35 King Street East (Corner Of Knightsbridge) Stockport SK1 1XJ
Installation of 1no. black digital communications kiosk, defibrillator and ancillary advertisement.
-
DC/099466 Refused
Pavement Outside 1-3 Merseyway Stockport SK1 1PW
Installation of 1no. black digital communications kiosk, defibrillator and ancillary advertisement.
-
DC/099470 Refused
Pavement Outside Of 53 Princes Street Stockport SK1 1SL
Installation of 1no. black digital communications kiosk, defibrillator and ancillary advertisement.
-
DC/099472 Granted
Pavement Outside Of 15 Woodford Road Bramhall Stockport SK7 1JN
Installation of 1no. black digital communications kiosk, defibrillator and ancillary advertisement.
-
DC/099482 Refused
Pavement Outside 76 High Street Cheadle SK8 1AE
Installation of 1no. black digital communications kiosk, defibrillator and ancillary advertisement