Planning application
Bayne's Family Bakers 73 Port Street Stirling FK8 2ER
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use of existing vacant bakery (Class 1A) to form hot food takeaway (Sui Generis) (no external alterations)
As published by the council, reference 26/00216/FUL
Application record
- Reference
- 26/00216/FUL
- Type
- Full
- Status
- Awaiting decision
- Received
- 28 Apr 2026
- Validated
- 4 May 2026
- Ward
- Ward 4 Stirling North
- Parish
- Mercat Cross Community Council
- Postcode
- FK8 2ER
Site history
Applications at this address on the Stirling register
This site has had 2 applications since 2026.
-
26/00217/LBC Awaiting decision
Bayne's Family Bakers 73 Port Street Stirling FK8 2ER
Internal alterations to vacant shop to form hot food takeaway (no external alterations)
Timeline
Dates from the published record
-
28 Apr 2026
Received by Stirling
-
4 May 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 29 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Stirling took a median of 58 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Stirling for determination, against a statutory target of eight weeks. Over the last year Stirling decided full applications in a median of 63 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Bayne's Family Bakers 73 Port Street Stirling FK8 2ER
100% historically approved · decision due ~29 Jun
Internal alterations to vacant shop to form hot food takeaway (no external alterations)
Awaiting decision Heritage and listed buildings 10 docs -
Stainton Carpets & Flooring 75 Port Street Stirling FK8 2ER
Fixing and installing retail signage (Retrospective)
Granted Heritage and listed buildings 6 docs -
Lets Party 75 Port Street Stirling FK8 2ER
Sub-division of retail unit to create a residential flat to rear
Granted Full applications 7 docs -
Stainton Carpets & Flooring 75 Port Street Stirling FK8 2ER
Fascia signage (Retrospective)
Granted Advertising 7 docs -
Lets Party 75 Port Street Stirling FK8 2ER
Sub-division of retail unit to create a residential flat to rear
Granted Heritage and listed buildings 8 docs -
Pavement In Front Of Paul Rolfe 1 Pitt Terrace Stirling
Proposed digital display screens on new BT Street Hub
Granted Advertising 6 docs
Other full applications
In Stirling
-
26/00356/FUL Granted
1 Strathview Terrace Balfron G63 0PS
Removal of existing sun lounge and erection of single storey extension
-
26/00471/FUL Awaiting decision
Endrick Cottage Polmaise Road Stirling FK7 9JH
Alterations and extensions to dwellinghouse
-
26/00295/FUL Granted
The Peak Stirling Sports Village Forthside Way Stirling FK8 1QZ
Installation of a new external chiller plant, to support the PEAK Leisure Centre's Ice Rink, with the introduction of a foundation slab and surrounding perimeter security fence with the adjacent existing chiller equipment being decommissioned and left insitu
-
26/00400/FUL Withdrawn
Endrick Cottage Polmaise Road Stirling FK7 9JH
Alterations and extensions to dwellinghouse
-
26/00465/FUL Awaiting decision
16 Randolph Terrace Stirling FK7 9AD
Removal of a redundant timber gate in the Williamfield Avenue boundary wall and infilling of the wall opening in blockwork, harled and painted to match the existing wall. Reinstatement of a storm-damaged timber gate between the front and side garden.