Skip to content
PlanIndex Get alerts
Menu

Planning application

Mast At Duckburn Car Park Duckburn Park Ind Estate Road Dunblane

Awaiting decision Stirling 25/00428/NSM Statutory Notification (Telecoms)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Notification under Class 67 of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 for the removal of 2no. existing equipment cabinets and replacement with 2no. proposed equipment cabinets, and installation of 1No. GPS Module

As published by the council, reference 25/00428/NSM

Application record

Reference
25/00428/NSM
Type
Statutory Notification (Telecoms)
Status
Awaiting decision
Received
31 Jul 2025
Validated
1 Aug 2025
Ward
Ward 3 Dunblane & Bridge Of Allan
Parish
Dunblane Community Council

Timeline

Dates from the published record

  1. 31 Jul 2025

    Received by Stirling

  2. 1 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 26 September 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Stirling took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Stirling for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

In Stirling

  • 24/00701/NSM Granted

    Mast Site West Of Fire Station Bridge Of Allan

    Removal and replacement of 3no. antennas and 1no. equipment cabinet and associated ancillary works

    13 Nov 2024 Telecoms
  • 24/00674/NSM Granted

    Mast Site At Plean Farm Some 250M South Of Sink Farm Plean

    Installation of 1 no. 300mm transmission dish onto existing support pole at 10.8m height

    30 Oct 2024 Telecoms
  • 24/00646/NSM Granted

    Earls Hill Transmitting Station Polmaise Road Fintry

    Installation of 2no. Transmission dishes alongside ancillary works to the existing tower

    18 Oct 2024 Telecoms
  • 24/00615/NSM Granted

    HSS Hire Showroom Kerse Road Stirling FK7 7LA

    Upgrade of existing base station installation comprising removal of existing 15m monopole and replacement with 20m monopole, supporting 9no. antennas, relocation of existing dish, with wraparound cabinet at base, together with removal of 2no. ground based cabinets and replacement with 1no. new cabinet and ancillary development

    1 Oct 2024 Telecoms
  • 23/00146/NSM Granted

    Mast 35M South Of Macfarlane Gray House Meadowforth Road Stirling

    Removal of 3 No. existing antenna and the addition of 6 No. new VMO2 antenna; installation of 2No. 300mm microwave dishes; installation of 15No. RRUs on relocated RRU brackets fixed to tower leg; installation of 1No. new GPS module; installation of 1No. 300mm dish and 1No. 600mm dish on sand off bracket to be fixed to tower leg; installation of 1 No. new EFF1 cabinet on concrete base and installation of 2 No. new EFF2 cabinets on concrete base

    13 Mar 2023 Telecoms