Skip to content
PlanIndex Get alerts
Menu

Planning application

41 Sish Lane Stevenage Herts SG1 3LS

Awaiting decision Stevenage 26/00584/ENQ10

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

I want to remove the window and move my existing door to the centre of the existing porch for a more modern look in line with the rest of the street. There would be no structural work, the size of the entrance would remain the same with the same size door, no extensions and no changes to the porch. Would I please be able to go ahead with the works if considered as minor permitted development or would it require planning permission. I have attached a picture of my existing doorway. Any help would be much appreciated, thank you.

As published by the council, reference 26/00584/ENQ10

Application record

Reference
26/00584/ENQ10
Status
Awaiting decision
Received
5 Aug 2026
Validated
5 Aug 2026
Postcode
SG1 3LS

Site history

Applications at this address on the Stevenage register

This site has had 2 applications since 2026.

  • 26/00396/TPTPO Decided

    41 Sish Lane Stevenage Herts SG1 3LS

    Works to trees protected by TPO 94: Oak (T1) - fell and remove stump, plant 1no. replacement tree; Oak (T2) - reduce crown 1m, thin crown 20%, remove epicormic growth and ivy.

    Decided 6 Jul 2026

Timeline

Dates from the published record

  1. 5 Aug 2026

    Received by Stevenage

  2. 7 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 30 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Stevenage took a median of 50 days over the applications it decided in the last year.

What happens while it is decided

This application is with Stevenage for determination, against a statutory target of eight weeks. Over the last year Stevenage's median decision took 50 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Stevenage's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles