Land between National Grid Laleham Substation in Staines, Spelthorne, TW17 0QR and proposed data centre at Land to the west of Manor Farm, Poyle Road, Colnbrook, Slough, SL3 0BL.
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of underground and ground mounted structures to support electrical connection and communication cables with temporary construction compounds, and associated infrastructure and works.
As published by the council, reference 26/01102/FUL
Application record
- Reference
- 26/01102/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 21 Oct 2026
- Validated
- 21 Oct 2026
- Decision by
- Delegated Decision
- Postcode
- SL3 0BL
Timeline
Dates from the published record
-
21 Oct 2026
Received by Spelthorne
-
28 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 16 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Spelthorne took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Quod Ltd Agent
1,108 applications on PlanIndex · across 131 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
198 documents on file for this application
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- ACKFUL ACK LETTER FOR FULL
- APPLICATIONFORMREDACTED
- FEECALCULATION
- ATTACHMENTSUMMARY
- TT_MANOR_FARM_WEST-DBA_REVISED_FINAL_SEPT26_PART3
- TT_MANOR_FARM_WEST-DBA_REVISED_FINAL_SEPT26_PART1
- TT_MANOR_FARM_WEST-DBA_REVISED_FINAL_SEPT26_PART2
- MANOR FARM CABLE ROUTE 160926
- 1148A.BNG.FINAL.02.FULL
- 1148A.MFW-CABLE-ROUTE-METRIC-CALCULATION-TOOL-STATUTORY
- CIL FORM 1
- MANOR FARM WEST COVER LETTER SPBC
- R01-DA-DRAFT CTMP POWER CABLE ROUTE 1
- P1237-22-JSM-TRI-RL-26-0200 P01 INSERT MAP OVERVIEW PLAN
- P1237-22-JSM-TRI-RL-26-0200 P01 LPA BOUNDARIES PLAN
- P1237-22-JSM-TRI-RL-26-0200 P01 SITE LOCATION PLAN
- P1237-22-JSM-TRI-RL-26-0200 P01 INSERT 8
- P1237-22-JSM-TRI-CS-26-0501 STANDARD CROSS SECTION
- P1237-22-JSM-TRI-RL-26-0200 P01 INSERT 2
- P1237-22-JSM-TRI-RL-26-0200 P01 INSERT 6
- P1237-22-JSM-TRI-RL-26-0200 P01 INSERT 5
- P1237-22-JSM-TRI-RL-26-0200 P01 INSERT 3
- P1237-22-JSM-TRI-RL-26-0200 P01 INSERT 4
- P1237-22-JSM-TRI-RL-26-0200 P01 INSERT 7
- P1237-22-JSM-TRI-RL-26-0200 P01 INSERT 1
- 1148A.ECOAS.FINAL.01.FULL
- 1148A.FLYSHEETS.FULL
- 32038 PM CABLE ROUTE FLOOD RISK ASSESSMENT_PART3
- 32038 PM CABLE ROUTE FLOOD RISK ASSESSMENT_PART1
- 32038 PM CABLE ROUTE FLOOD RISK ASSESSMENT_PART2
- TRANSMITTAL - 00014
- 32038 PM CABLE ROUTE FLOOD RISK ASSESSMENT_PART4
- MANOR FARM WEST CABLES ROUTE PLANNING STATEMENT FINAL
- Q250317.MFWCABLE_ES_PREFACE.01.EF
- 2621-KC-CR-YTREE-TREECONSTRAINTSPLAN01REV0-2OF3
- 2621-KC-CR-YTREE-TREECONSTRAINTSPLAN01REV0-1OF3
- 2621-KC-CR-YTREE-TREECONSTRAINTSPLAN01REV0-3OF3
- 2621-KC-CR-YTREE-TREESURVEY&IMPACTASSESSMENT-REV0
- ES NON-TECHNICAL SUMMARY
- ES VOLUME 1 CHAPTER 1 - INTRODUCTION
- ES VOLUME 1 CHAPTER 3 - METHODOLOGY
- ES VOLUME 1 CHAPTER 4 - ALTERNATIVES
- ES VOLUME 1 CHAPTER 5 - PROJECT DESCRIPTION
- ES VOLUME 1 CHAPTER 0 - TABLE OF CONTENTS AND GLOSSARY
- ES VOLUME 1 CHAPTER 7 - SOCIO ECONOMICS
- ES VOLUME 1 CHAPTER 2 - SITE AND SETTING
- ES VOLUME 1 CHAPTER 8 - LAND CONTAMINATION
- ES VOLUME 1 CHAPTER 10 - AIR QUALITY
- ES VOLUME 1 CHAPTER 11 - CLIMATE CHANGE
- ES VOLUME 1 CHAPTER 14 - EFFECT INTERACTIONS
- ES VOLUME 1 CHAPTER 12 - LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- ES VOLUME 1 CHAPTER 15 - SUMMARY OF SIGNIFICANT RESIDUAL EFFECTS
- ES VOLUME 1 CHAPTER 13 - WATER ENVIRONMENT
- ES VOLUME 1 FIGURE 12.3 - GREEN BELT PLAN
- ES VOLUME 1 FIGURE 12.2 - AERIAL LOCATION PLAN
- ES VOLUME 1 CHAPTER 6 - DEMOLITION AND CONSTRUCTION
- ES VOLUME 1 CHAPTER 9 - ECOLOGY
- ES VOLUME 1 FIGURE 12.1 - SITE LOCATION PLAN
- ES VOLUME 1 FIGURE 12.4 - TOPOGRAPHY PLAN
- ES VOLUME 1 FIGURE 12.5 - ENVIRONMENTAL DESIGNATIONS PLAN
- ES VOLUME 1 FIGURE 12.6 - LANDSCAPE CHARACTER PLAN
- ES VOLUME 1 FIGURE 12.8 - TRANQUILLITY PLAN
- ES VOLUME 1 FIGURE 12.7 - HISTORIC LANDSCAPE CLASSIFICATION PLAN
- ES VOLUME 1 FIGURE 12.9 - SCREENED ZONE OF THEORETICAL VISIBILITY (SZTV) PLAN
- ES VOLUME 1 FIGURE 12.11 - SUMMER VIEWPOINT LOCATION PLAN
- ES VOLUME 1 FIGURE 12.10 - CUMULATIVE SCREENED ZONE OF THEORETICAL VISIBILITY (S
- ES VOLUME 1 FIGURE 12.12 - WINTER VIEWPOINT LOCATION PLAN
- ES VOLUME 2 APPENDIX 1.1 - STATEMENT OF COMPETENCY
- ES VOLUME 2 APPENDIX 3.1 - LOCATION OF SPECIFIED INFO WITHIN THE ES
- ES VOLUME 2 APPENDIX 3.2 - EIA SCOPING NOTE
- ES VOLUME 2 APPENDIX 3.3 - LIST OF CUMULATIVE SCHEMES
- ES VOLUME 2 APPENDIX 0 - TABLE OF CONTENTS
- ES VOLUME 2 APPENDIX 3.4 - MFW CABLE ROUTE ENVIRONMENTAL APPRAISAL
- ES VOLUME 2 APPENDIX 3.5 - MANOR FARM CABLE ROUTE EIA SCREENING_PART4
- ES VOLUME 2 APPENDIX 3.5 - MANOR FARM CABLE ROUTE EIA SCREENING_PART1
- ES VOLUME 2 APPENDIX 2.1 - MANOR FARM DEVELOPMENT DRAWINGS
- ES VOLUME 2 APPENDIX 3.5 - MANOR FARM CABLE ROUTE EIA SCREENING_PART3
- ES VOLUME 2 APPENDIX 3.5 - MANOR FARM CABLE ROUTE EIA SCREENING_PART2
- ES VOLUME 2 APPENDIX 5.1 - SELECTION OF PLANNING APPLICATION DRAWINGS_PART1
- ES VOLUME 2 APPENDIX 5.1 - SELECTION OF PLANNING APPLICATION DRAWINGS_PART3
- ES VOLUME 2 APPENDIX 5.1 - SELECTION OF PLANNING APPLICATION DRAWINGS_PART5
- ES VOLUME 2 APPENDIX 5.1 - SELECTION OF PLANNING APPLICATION DRAWINGS_PART6
- ES VOLUME 2 APPENDIX 5.1 - SELECTION OF PLANNING APPLICATION DRAWINGS_PART8
- ES VOLUME 2 APPENDIX 5.1 - SELECTION OF PLANNING APPLICATION DRAWINGS_PART7
- ES VOLUME 2 APPENDIX 5.1 - SELECTION OF PLANNING APPLICATION DRAWINGS_PART4
- ES VOLUME 2 APPENDIX 5.1 - SELECTION OF PLANNING APPLICATION DRAWINGS_PART9
- ES VOLUME 2 APPENDIX 5.1 - SELECTION OF PLANNING APPLICATION DRAWINGS_PART2
- ES VOLUME 2 APPENDIX 4.1 - ALTERNATIVE SITE ASSESSMENT
- ES VOLUME 2 APPENDIX 6.2 - CUT AND FILL DRAWINGS_PART1
- ES VOLUME 2 APPENDIX 8.1 - LEGISLATION, POLICY AND GUIDANCE
- ES VOLUME 2 APPENDIX 6.1 - OUTLINE CEMP
- ES VOLUME 2 APPENDIX 6.2 - CUT AND FILL DRAWINGS_PART4
- ES VOLUME 2 APPENDIX 6.2 - CUT AND FILL DRAWINGS_PART3
- ES VOLUME 2 APPENDIX 6.2 - CUT AND FILL DRAWINGS_PART2
- ES VOLUME 2 APPENDIX 8.2 - PRA_PART3
- ES VOLUME 2 APPENDIX 8.2 - PRA_PART1
- ES VOLUME 2 APPENDIX 8.3 - GQRA_PART7
- ES VOLUME 2 APPENDIX 8.3 - GQRA_PART2
- ES VOLUME 2 APPENDIX 8.2 - PRA_PART2
- ES VOLUME 2 APPENDIX 8.3 - GQRA_PART1
- ES VOLUME 2 APPENDIX 8.3 - GQRA_PART3
- ES VOLUME 2 APPENDIX 8.3 - GQRA_PART4
- ES VOLUME 2 APPENDIX 8.3 - GQRA_PART5
- ES VOLUME 2 APPENDIX 8.3 - GQRA_PART6
- ES VOLUME 2 APPENDIX 8.4 - GGRA
- ES VOLUME 2 APPENDIX 8.5 ORS_PART2
- ES VOLUME 2 APPENDIX 8.5 ORS_PART3
- ES VOLUME 2 APPENDIX 8.5 ORS_PART7
- ES VOLUME 2 APPENDIX 8.5 ORS_PART1
- ES VOLUME 2 APPENDIX 8.5 ORS_PART4
- ES VOLUME 2 APPENDIX 8.5 ORS_PART5
- ES VOLUME 2 APPENDIX 8.5 ORS_PART9
- ES VOLUME 2 APPENDIX 8.5 ORS_PART6
- ES VOLUME 2 APPENDIX 8.5 ORS_PART10
- ES VOLUME 2 APPENDIX 8.5 ORS_PART8
- ES VOLUME 2 APPENDIX 9.3 - SHRA
- ES VOLUME 2 APPENDIX 9.4 - ARBORICULTURAL IMPACT ASSESSMENT
- ES VOLUME 2 APPENDIX 9.2 - BNG ASSESSMENT
- ES VOLUME 2 APPENDIX 9.1 - ECOLOGICAL IMPACT ASSESSMENT
- ES VOLUME 2 APPENDIX 10.2 - IAQM CONSTRUCTION DUST GUIDANCE
- ES VOLUME 2 APPENDIX 10.5 - PROFESSIONAL EXPERIENCE
- ES VOLUME 2 APPENDIX 10.1 - LEGISLATION POLICY AND GUIDANCE
- ES VOLUME 2 APPENDIX 10.3 - EPUK AND IAQM PLANNING GUIDANCE
- ES VOLUME 2 APPENDIX 10.4 - MODELLING METHODOLOGY
- ES VOLUME 2 APPENDIX 10.6 - CONSTRUCTION MITIGATION
- ES VOLUME 2 APPENDIX 10.7 - EMERGENCY BACK-UP GENERATOR RESULTS
- ES VOLUME 2 APPENDIX 11.2 - GHG EMISSIONS INVENTORY INPUTS AND RESULTS
- ES VOLUME 2 APPENDIX 11.3 - IN-COMBINATION CLIMATE IMPACT ASSESSMENT
- ES VOLUME 2 APPENDIX 12.1 - LANDSCAPE EFFECTS TABLES
- ES VOLUME 2 APPENDIX 12.2 - VISUAL EFFECTS TABLES
- ES VOLUME 2 APPENDIX 11.1 - CLIMATE LEGISLATION POLICY AND GUIDANCE
- ES VOLUME 2 APPENDIX 12.3 - SUMMER CONTEXT VIEWS_PART5
- ES VOLUME 2 APPENDIX 12.3 - SUMMER CONTEXT VIEWS_PART4
- ES VOLUME 2 APPENDIX 12.3 - SUMMER CONTEXT VIEWS_PART2
- ES VOLUME 2 APPENDIX 12.3 - SUMMER CONTEXT VIEWS_PART3
- ES VOLUME 2 APPENDIX 12.3 - SUMMER CONTEXT VIEWS_PART6
- ES VOLUME 2 APPENDIX 12.3 - SUMMER CONTEXT VIEWS_PART1
- ES VOLUME 2 APPENDIX 12.3 - SUMMER CONTEXT VIEWS_PART7
- ES VOLUME 2 APPENDIX 12.4 - WINTER CONTEXT VIEWS_PART2
- ES VOLUME 2 APPENDIX 12.4 - WINTER CONTEXT VIEWS_PART3
- ES VOLUME 2 APPENDIX 12.4 - WINTER CONTEXT VIEWS_PART4
- ES VOLUME 2 APPENDIX 12.4 - WINTER CONTEXT VIEWS_PART1
- ES VOLUME 2 APPENDIX 12.4 - WINTER CONTEXT VIEWS_PART5
- ES VOLUME 2 APPENDIX 12.4 - WINTER CONTEXT VIEWS_PART7
- ES VOLUME 2 APPENDIX 12.4 - WINTER CONTEXT VIEWS_PART6
- ES VOLUME 2 APPENDIX 12.5 - SUMMER TYPE 3 & TYPE 4 PHOTOWIRES_PART4
- ES VOLUME 2 APPENDIX 12.6 - WINTER TYPE 3 & TYPE 4 PHOTOWIRES_PART1
- ES VOLUME 2 APPENDIX 12.5 - SUMMER TYPE 3 AND TYPE 4 PHOTOWIRES_PART1
- ES VOLUME 2 APPENDIX 12.5 - SUMMER TYPE 3 & TYPE 4 PHOTOWIRES_PART3
- ES VOLUME 2 APPENDIX 12.6 - WINTER TYPE 3 & TYPE 4 PHOTOWIRES_PART5
- ES VOLUME 2 APPENDIX 12.6 - WINTER TYPE 3 & TYPE 4 PHOTOWIRES_PART2
- ES VOLUME 2 APPENDIX 12.5 - SUMMER TYPE 3 & TYPE 4 PHOTOWIRES_PART2
- ES VOLUME 2 APPENDIX 12.6 - WINTER TYPE 3 & TYPE 4 PHOTOWIRES_PART3
- ES VOLUME 2 APPENDIX 12.6 - WINTER TYPE 3 & TYPE 4 PHOTOWIRES_PART4
- ES VOLUME 2 APPENDIX 12.7 - SUMMER TYPE 3 & TYPE 4 CUMULATIVE PHOTOWIRES_PART4
- ES VOLUME 2 APPENDIX 12.7 - SUMMER TYPE 3 & TYPE 4 CUMULATIVE PHOTOWIRES_PART1
- ES VOLUME 2 APPENDIX 12.8 - WINTER TYPE 3 & TYPE 4 CUMULATIVE PHOTOWIRES_PART1
- ES VOLUME 2 APPENDIX 12.8 - WINTER TYPE 3 & TYPE 4 CUMULATIVE PHOTOWIRES_PART4
- ES VOLUME 2 APPENDIX 12.7 - SUMMER TYPE 3 & TYPE 4 CUMULATIVE PHOTOWIRES_PART2
- ES VOLUME 2 APPENDIX 12.7 - SUMMER TYPE 3 & TYPE 4 CUMULATIVE PHOTOWIRES_PART3
- ES VOLUME 2 APPENDIX 12.8 - WINTER TYPE 3 & TYPE 4 CUMULATIVE PHOTOWIRES_PART2
- ES VOLUME 2 APPENDIX 12.8 - WINTER TYPE 3 & TYPE 4 CUMULATIVE PHOTOWIRES_PART3
- ES VOLUME 2 APPENDIX 12.10 - COLNE VALLEY PARK TRUST CONSULTATION RESPONSE
- ES VOLUME 2 APPENDIX 12.11 - CUMULATIVE EFFECTS TABLE
- ES VOLUME 2 APPENDIX 12.9 - AVR METHODOLOGY
- ES VOLUME 2 APPENDIX 13.2 - WATER USE NOTE
- ES VOLUME 2 APPENDIX 13.1 - FRA AND DRAINAGE STRATEGY_PART2
- ES VOLUME 2 APPENDIX 13.1 - FRA AND DRAINAGE STRATEGY_PART3
- ES VOLUME 2 APPENDIX 13.1 - FRA AND DRAINAGE STRATEGY_PART1
- ES VOLUME 2 APPENDIX 13.1 - FRA AND DRAINAGE STRATEGY_PART4
- REH PHASE I PRA MFW CABLE ROUTE_2.0_PART3
- REH PHASE I PRA MFW CABLE ROUTE_2.0_PART2
- REH PHASE I PRA MFW CABLE ROUTE_2.0_PART5
- REH PHASE I PRA MFW CABLE ROUTE_2.0_PART4
- REH PHASE I PRA MFW CABLE ROUTE_2.0_PART1
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Spelthorne for determination, against a statutory target of eight weeks. Over the last year Spelthorne decided full applications in a median of 78 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Manor Farm and land north of Wraysbury Reservoir Poyle Road, Slough, SL3 0BL
78% historically approved · decision due ~26 Nov
Submission of details pursuant to condition 3 (External Materials) of planning p
Awaiting decision -
Manor Farm and land north of Wraysbury Reservoir Poyle Road, Slough, SL3 0BL
78% historically approved · decision due ~26 Nov
Submission of details pursuant to condition 11 (Car Park Management Plan) of pla
Awaiting decision -
Land Between National Grid Laleham Substation And Manor Farm, Poyle Road Colnbrook Slough SL3 0BL
Consultation Hillingdon Council (39706/APP/2026/365) for installation of underground and ground mounted structures to support electrical connection and communication cables with temporary construction compounds, and associated infrastructure and works
Awaiting decision 3 docs -
Manor Farm Poyle Road Poyle Slough Berkshire SL3 0BL
Slough Borough Council consultation (reference P/11442/013) for construction of a proposed Installation of underground and ground mounted structures to support electrical connection and communication cables with temporary construction compounds, and associated infrastructure and works
Granted 2 docs -
Land to the west of Manor Farm, Poyle Road, Colnbrook, Slough, SL3 0BL
78% historically approved · decision due ~13 Nov
Proposed demolition of existing buildings and structures, and erection of three
Status unknown Full applications Demolition -
Manor Farm Poyle Road Poyle Slough Berks SL3 0BL
66% historically approved · decision due ~7 Apr
Consultation from Slough Borough Council on planning application P/11442/012 - Construction of a proposed Installation of underground and ground mounted structures to support electrical connection and communication cables with temporary construction compounds, and associated infrastructure and works
Awaiting decision Outline 1 doc
Other full applications
In Spelthorne
-
26/00868/FUL Granted
The Feathers The Broadway Laleham Staines-upon-Thames TW18 1RZ
Change of use from public house (Sui Generis) to a single residential dwelling (Class C3), including the demolition of rear extensions, internal and external alterations, and the conversion of three public parking spaces into private parking for the proposed dwelling
-
26/00899/FUL Decided
26 Station Crescent Ashford TW15 3HH
Extension and conversion of the existing dwelling to provide four one-bedroom, one-person residential flats, including the replacement of the existing single-storey rear extension with a part single-storey, part two-storey rear and side extension, together with associated external alterations, two off-street parking spaces, secure cycle storage, refuse storage and communal amenity space
-
26/00911/FUL Granted
W R Sports Club The Centre Woodthorpe Road Ashford TW15 3JX
The proposed construction of a 6m x 3.7m, 2.5m high outbuilding at Ashford Tennis Club to replace existing 6m x 3m Portakabin which will be used as a spectator viewing pavilion.
-
26/01108/FUL Awaiting decision
Woodland House Woodlands Drive Sunbury-on-Thames TW16 5JS
Retrospective permission for the incorporation of land to rear into C3 residential garden use. With associated new fencing.
-
26/00840/FUL Granted
Curchods 58 High Street Shepperton TW17 9AU
Erection of a building containing 2 no. studio flats and 2 no. one bedroom flats at land to the rear of the site.