Planning application
Land To The East Of WR Sports Club Woodthorpe Road Ashford TW15 3JX
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Outline planning permission (all matters reserved except access) for the development of up to 104 dwellings (C3) (including 50% affordable), including the provision of vehicular and pedestrian access, landscaping and other associated infrastructure.
As published by the council, reference 26/00745/OUT
Application record
- Reference
- 26/00745/OUT
- Type
- Outline Application
- Status
- Awaiting decision
- Received
- 16 Jul 2026
- Validated
- 20 Aug 2026
- Ward
- Ashford Town
- Parish
- Staines South And Ashford West ED
- Decision by
- Delegated if Refusal
- Postcode
- TW15 3JX
Timeline
Dates from the published record
-
16 Jul 2026
Received by Spelthorne
-
20 Aug 2026
Validated
Checked as complete and ready for consideration.
-
24 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 15 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Spelthorne took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Montagu Evans LLP Agent, registered in London
Active · incorporated 2005 · London
1,330 applications on PlanIndex · across 128 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
197 documents on file for this application
- RE-CONSULTATION LETTER
- LETTERS OF REPRESENTATION
- LETTERS OF REPRESENTATION
- LLFA SUDS
- LETTERS OF REPRESENTATION
- LETTERS OF REPRESENTATION
- HEATHROW AIRPORT RESPONSE
- SURREY POLICE
- LETTERS OF REPRESENTATION
- ACKFUL ACK LETTER FOR FULL
- LAND USE PARAMETER PLAN (WITH ACCESS)
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- DESIGN CODE
- CLIMATE CHANGE CHECKLIST
- SWEPT PATH ANALYSIS - REFUSE
- APPLICATIONFORMREDACTED
- FEECALCULATION
- ATTACHMENTSUMMARY
- AIR QUALITY ASSESSMENT
- BAT ACTIVITY REPORT
- PEA 050626
- DAS PART 1
- DAS PART 2
- DAS PART 3
- DAS PART 4
- DAS PART 5
- DAS PART 6
- DAS PART 7
- DAS PART 8
- DAS PART 9
- DAS PART 10
- BNG BASELINE CONDITION ASSESSMENT
- BNG REPORT FINAL
- ARBORICULTURAL IMPACT ASSESSMENT
- PART 1 - GEOENVIRONMENTAL DESK STUDY
- PART 2 - GEOENVIRONMENTAL DESK STUDY
- PART 3 - GEOENVIRONMENTAL DESK STUDY
- PART 4 - GEOENVIRONMENTAL DESK STUDY
- FRA AND DRAINAGE STRATEGY
- UTILITIES ASSESSMENT PART 4
- UTILITIES ASSESSMENT PART 5
- UTILITIES ASSESSMENT PART 1
- UTILITIES ASSESSMENT PART 2
- UTILITIES ASSESSMENT PART 3
- NOISE IMPACT ASSESSMENT - 040626
- ENERGY STATEMENT - 090626
- TRANSPORT ASSESSMENT PART 1
- TRANSPORT ASSESSMENT PART 2
- FRAMEWORK TRAVEL PLAN
- CIL FORM 1
- TOWNSCAPE AND VISUAL OVERVIEW
- TOWNSCAPE AND VISUAL OVERVIEW
- SUSTAINABILITY STATEMENT - 090626
- DAYLIGHT AND SUNLIGHT REPORT
- ARCHAEOLOGY DBA - 020626
- LSP
- ILLUSTRATIVE WEST ELEVATION
- ILLUSTRATIVE PROPOSED 3B5P
- ILLUSTRATIVE PROPOSED 3B6P
- ILLUSTRATIVE PROPOSED 4B8P
- ILLUSTRATIVE SITE SECTIONS AA/BB/CC
- ILLUSTRATIVE SITE SECTIONS DD/EE
- ILLUSTRATIVE SITE SECTIONS FF/GG
- 3B5P TOWNHOUSE PLAN
- 3B6P TOWNHOUSE PLAN
- 4B8P TOWNHOUSE PLAN
- 2B4P TYPICAL APARTMENT PLAN
- 1B2P TYPICAL APARTMENT PLAN
- 2B3P TYPICAL APARTMENT PLAN
- 3B5P TYPICAL APARTMENT PLAN
- SITE LOCATION PLAN
- ILLUSTRATIVE PROPOSED SITE PLAN
- ILLUSTRATIVE PROPOSED SITE PLAN COLOUR
- DEVELOPMENT ZONE HEIGHT PARAMETER PLAN
- LAND USE PARAMETER PLAN
- ILLUSTRATIVE GROUND FLOOR PLAN
- ILLUSTRATIVE FIRST FLOOR PLAN
- ILLUSTRATIVE SECOND FLOOR PLAN
- ILLUSTRATIVE THIRD FLOOR PLAN
- ILLUSTRATIVE ROOF PLAN
- ILLUSTRATIVE NORTH ELEVATION
- ILLUSTRATIVE EAST ELEVATION
- ILLUSTRATIVE SOUTH ELEVATION
- SCHEDULE OF APPLICATION DRAWINGS
- PROPOSED IMPROVEMENT PLANS TO WOODTHRORPE ROAD
- COPY
- BNG METRIC EXCEL
- COVERING LETTER
- SCHEDULE OF APPLICATION DOCUMENTATION
- PLANNING STATEMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Spelthorne for determination, against a statutory target of eight weeks. Over the last year Spelthorne's median decision took 56 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
The Centre Woodthorpe Road Ashford TW15 3JX
Discharge of condition 4 (Remediation Strategy) relating to planning permission 21/01391/FUL
Granted Conditions 8 docs -
Land Adjacent To The Centre Woodthorpe Road Ashford Surrey TW15 3JX
63% historically approved · decision due ~6 Nov
The excavation of an underground utilities trench to install electricity, fresh water, foul water drainage and a dedicated fire hydrant connection to serve Ashford Village Hall.
Awaiting decision Full applications 16 docs -
W R Sports Club The Centre Woodthorpe Road Ashford TW15 3JX
The proposed construction of a 6m x 3.7m, 2.5m high outbuilding at Ashford Tennis Club to replace existing 6m x 3m Portakabin which will be used as a spectator viewing pavilion.
Granted Full applications 11 docs -
103 Woodthorpe Road Ashford TW15 3JX
Erection of a single storey rear extension and erection of an outbuilding at the rear of garden to be used as a granny annexe (following demolition of existing garage and single storey rear extension).
Withdrawn Householder Extension Demolition 13 docsSmall domestic -
79 Chesterfield Road Ashford TW15 3PF
Erection of a single storey rear wrap around extension.
Granted Householder Extension 11 docsSmall domestic -
106 Woodthorpe Road Ashford TW15 3JY
The erection of a two storey extension to northern side elevation and single storey extension to eastern side.
Granted Householder Extension 20 docsSmall domestic
Other outline applications
In Spelthorne
-
26/00544/OUT Granted
Stanwell Farm And Part Of The Adjacent Builder's Merchants, Bedfont Road, Stanwell, Staines-upon-Thames, TW19 7LY AND Long Acre Farm, Long Lane, Stanwell, Staines-upon-Thames, TW19 7AU
Outline application with access to be assessed, for the demolition of the dwellings at Stanwell Farm and Long Acre Farm (2 no. residential dwellings) and redevelopment of the site off Bedfont Road (Stanwell Farm) to provide up to 10 no. apartments with associated parking and open space, and the creation of a new access into the Site (net gain of 8 no. dwellings).
-
26/00933/OUT Awaiting decision
Land At Orchard Close Ashford TW15 1JD
Outline application with access, layout and scale to be assessed, for the erection of a detached two-storey 3/4 bedroom dwelling with associated access, parking, cycle and refuse storage.
-
26/00822/OUT Awaiting decision
Land At Sunbury Golf Club Charlton Lane Shepperton TW17 8QA
Outline planning application for reprofiling of the land to support a phased mixed-use development comprising up to 507 residential dwellings (including affordable housing); a Class C2 care home up to 3,230 sqm and 75-beds; a Class E(e) medical centre up to 650 sqm; a network of new roads, cycle and car parking, landscaping, public open space, drainage features and other necessary works and associated infrastructure. All matters reserved other than access.
-
26/00616/EIASE Decided
Land East Of Vicarage Road Vicarage Road Sunbury-on-Thames TW16 7LB
EIA Screening Opinion on behalf of Riverdale Developments, in respect of new residential development of 160 dwellings
-
25/01015/OUT Refused
Land To The Rear Of 1-4 New Road Shepperton TW17 0QQ
Outline application for the erection of 2 no. two storey buildings comprising 4 no. two bed maisonettes with associated amenity space, car-parking and access.