Skip to content
PlanIndex Get alerts
Menu

Planning application

24/01446/DC1

Land At Station Road Shepperton TW17 8AU

Awaiting decision Spelthorne Discharge of Condition (1)

Proposal

Discharge of condition 10 (Verification Report) relating to planning permission 24/01446/RVC

As published by the council, reference 24/01446/DC1

Timeline

Dates from the published record

  1. 16 Oct 2025

    Received by Spelthorne

  2. 30 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Spelthorne for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 21/00887/FUL Refused

    Land At Station Road Shepperton TW17 8AU

    Erection of 2 no. Semi-Detached Dwellings (in place of approved detached dwelling) as shown on drawings numbered CCL01-MAA-MB-ZZ-DR-A-00001 P02, 00002 P02, 01001 P5, 02001 P05, 04001 P05, 05001 P03 and 08001 P01 received on 26 May 2021.

    25 May 2021 50m away Full applications
  • 24/00743/FUL Granted

    The Clock House Station Approach Shepperton TW17 8AJ

    Construction of new 4 storey building within existing car park to provide 9 new residential units

    18 Jun 2024 76m away Full applications
  • 24/00743/DC1 Awaiting decision

    The Clock House Station Approach Shepperton TW17 8AJ

    Discharge of Condition 3 (materials), Condition 4 (energy -Saps), Condition 8 (contamination) relating to planning permission 24/00743/FUL

    5 Feb 2026 84m away Conditions
  • 25/00436/DC1 Awaiting decision

    Building A Terminal House Station Approach Shepperton TW17 8AS

    Discharge of conditions 2 (ContaminationDesk study); 4 (Parking scheme); 5 (Electric Vehicle (EV) charging points); 6 (Cycle parking details); 7 (Foul & surface water disposal); 8 (Refuse & recycling storage details) relating to planning permission 25/00436/PAP

    11 Sep 2025 94m away Conditions
  • 25/00437/DC1 Awaiting decision

    Building B Terminal House Station Approach Shepperton TW17 8AS

    Discharge of Conditions 2) Contamination Desk Study; 4) Parking scheme; 5) Electric Vehicle (EV) charging points; 6) cycle parking details; 7) Foul & surface water disposal; 8) Refuse & recycling storage details of Prior Approval 25/00437/PAP.

    9 Sep 2025 94m away Conditions
  • 22/01083/HOU Withdrawn

    19 Crescent Road Shepperton TW17 8BL

    Erection of a two storey side/rear extension and part conversion of the existing garage into a habitable room

    1 Aug 2022 163m away Householder

In Spelthorne

  • 25/01292/DC1 Awaiting decision

    3 Glen Avenue Ashford Surrey TW15 2JE

    Discharge of conditions: 4, 5, 7 and 9 relating to planning permission: 25/01292/FUL. Condition 4: Drawing MR.216.11, Landscaping, denotes the means of enclosure for the site and drawing MR216.12A, External Hard Landscaping Materials, shows the intended materials that will be used for boundary treatments. Condition 5: Drawing MR216.14 (Trial Hole Positions) and a Survey Report. Condition 7: Renewable Energy Statement Condition 9: Biodiversity Gain Plan

    28 Jul 2026 Conditions
  • 21/01547/DC9 Decided

    Shepperton Studios Studios Road Shepperton TW17 0QD

    Re-discharge of condition 13 (details of the north backlot management plan) relating to planning permission 21/01547/FUL - 21/01547/DC9

    8 Aug 2025 Conditions
  • 23/01338/DC2 Decided

    Lismore Court Kingston Road Staines-upon-Thames TW18 1AU

    Discharge of condition 2 (Materials), condition 9 (Renewables), condition 13 (Soft and hard lanscaping), condition 14 (Means of enclosure) relating to planning permission 23/01338/FUL

    30 Sep 2025 Conditions
  • 26/00273/DC1 Awaiting decision

    10 Chertsey Road Shepperton TW17 9LB

    Discharge of condition 2 (materials) relating to 26/00273/HOU

    20 Jul 2026 Conditions
  • 24/00790/DC4 Decided

    Hitchcock And King Station Yard Stanwell Road Ashford TW15 3DT

    Discharge of condition 6 (Renewable Energy) relating to previous planning permission 24/00790/FUL

    7 May 2026 Conditions