Planning application
Building C BP International Chertsey Road Sunbury-on-Thames TW16 7LN
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of services enclosure to accommodate a new Hydrotreated Vegetable Oil fuel powered standby generator with separate 6,000 litre bulk fuel storage tank, to serve Building C
As published by the council, reference 24/00511/FUL
Application record
- Reference
- 24/00511/FUL
- Type
- Full Application
- Status
- Decided (Approved)
- Decision
- Granted As published: Grant Conditional
- Received
- 19 Apr 2024
- Validated
- 29 Apr 2024
- Decided
- 10 Jan 2025
- Ward
- Ashford Common
- Parish
- Sunbury Common And Ashford Common ED
- Decision by
- Delegated Decision
- Postcode
- TW16 7LN
Timeline
Dates from the published record
-
19 Apr 2024
Received by Spelthorne
-
29 Apr 2024
Validated
Checked as complete and ready for consideration.
-
10 Jan 2025
Decision issued: Grant Conditional
-
25 Sep 2026
Added to PlanIndex
Documents
The council's own list, drawings first
48 documents on file for this application
Drawings (14)
- Proposed floor plan
- Proposed elevations colour
- Proposed roof plan
- Proposed site layout plan
- Proposed site context plan
- Planting proposals general arrangement
- Sections and details
- Sections and details
- Overall site plan
- Planting details
- Area c baby tanker spa
- Location plan
- Existing elevations
- Generator existing site plan
Everything on file (48)
- GCFULZ GRANT CONDITIONAL FULL
- DELEGATED REPORT UPDATED 24.6.20
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- BNG MATRIX
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- ACKFUL ACK LETTER FOR FULL
- GROUND ENGINEERING LAND QUALITY ASSESSMENT
- FLOOD RISK ASSESSMENT
- APPLICATIONFORMREDACTED
- FEECALCULATION
- ATTACHMENTSUMMARY
- LOCATION PLAN
- PLANTING PROPOSALS GENERAL ARRANGEMENT REV A
- PLANTING DETAILS
- OVERALL SITE PLAN
- PROPOSED FLOOR PLAN
- PROPOSED ROOF PLAN
- PROPOSED SITE LAYOUT PLAN
- GENERATOR EXISTING SITE PLAN
- EXISTING ELEVATIONS
- PROPOSED ELEVATIONS (COLOUR)
- PROPOSED SITE CONTEXT PLAN (1)
- GA SECTIONS AND DETAILS
- GA SECTIONS AND DETAILS
- BLD C BIRD AND BAT BOX PLAN
- AREA C BABY TANKER SPA
- (RPT)004B BUILDING C DESIGN AND ACCESS STATEMENT
- ARCHITECTURAL SPECIFICATION
- 10385 BP SUNBURY - NOISE EMISSION ASSESSMENT - REVC
- BUILDING C BNG V2
- PRELIMINARY ECOLOGICAL APPRAISAL
- 12497A2 (AQ) V1
- 0057063-BHE-XX-XX-RP-YG-0003 P01 (1)
- HAZARDOUS SUBSTANCES RISK ASSESSMENT.
- BUSINESS JUSTIFICATION COVERING LETTERREV1.1
- LAS_667_A ARBORICULTURAL STATEMENT DEC 2023 BUILDING C (1)
- TRANSPORT NOTE - FINAL (1)
- BUILDING C APPLICATION COVERING LETTER
- CIL FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What this grant of permission means
Spelthorne granted permission on 10 January 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Building 200 BP International Chertsey Road Ashford TW16 7LN
Discharge of condition 3 (Biodiversity Gain Plan) relating to planning permission 24/00510/FUL
Granted Conditions 14 docs -
Meadhurst Club Chertsey Road Sunbury-on-Thames TW16 7LL
TPO 159-91 - Lombardy Poplar (Tag 655 on plan) - Fell to short monolith, retained height approximately 3 metres. Horse Chestnut (582 on plan) Fell, Copper beech (582 on plan) remove dead wood, Lime (602 on plan) remove dead wood, Conifer (G13 on plan ) Fell .
-
BP International Plc, BP Research Centre, Chertsey Road, Ashford, TW16 7LN
Discharge of conditions 11 and 12a
Granted Conditions -
BP International, Building E Chertsey Road Ashford TW16 7LN
Erection of services enclosure to accommodate a new Hydrotreated Vegetable Oil fuel powered generator, separate 6,000 litre bulk fuel storage tank, LV switchgear and battery storage, to serve Building E
-
Building 200 BP International Chertsey Road Ashford TW16 7LN
Erection of services enclosure to accommodate a new Hydrotreated Vegetable Oil fuel powered standby generator with integrated 470 litre skid mounted bunded fuel tank, to serve Building 200
-
44 Doris Road Ashford TW15 1LR
Certificate of Lawfulness for proposed single storey rear extension
Small domestic
Other full applications
In Spelthorne
-
26/00999/FUL Decided
Venture House 42 London Road Staines-upon-Thames TW18 4HF
Construction of a two storey extension at roof level consisting of 9 no. self-contained residential units (Use Class C3), provision of car parking, cycle parking and associated works
-
26/00739/FUL Granted
Memorial Gardens Market Square Staines-upon-Thames TW18 4SD
New children's play facility with associated railings, seating, flooring and landscaping
-
26/00844/FUL Decided
7 Marlborough Road Ashford TW15 3PZ
Erection of a single storey side extension and conversion of the existing side/rear extension to create a self-contained flat with a sub-division of the existing plot with associated landscaping, refuse and cycle storage. (As shown on Location plan and block plan and plan no 7 MARL- EPPE01 Rev 06 rec'd 17.09.2026)
-
26/01189/FUL Awaiting decision
299 Feltham Hill Road Ashford TW15 1LT
Change of use from a house of multiple occupancy for 7 occupants (HMO - Sui Generis) to an house of multiple occupancy for 8 occupants (HMO - Sui Generis)
-
26/00921/FUL Decided
288 Kingston Road Ashford TW15 3SF
Conversion of loft space, including the formation of two side dormers and a rear extension to facilitate change of use from C3 to Sui Generis 9 Person HMO includes provision for car and cycle parking, external amenity spaces, and other associated works (As shown on plans: EX - L003; EX - P001; EX - P002; EX - P004; EX - E001; EX - E002; EX - E003; EX - E004; EX - S001; EX - S002 received 01.09.2026 and PR - P001; PR - P002; PR - P001; PR - P002; PR - P004; PR - E001; PR - E002; PR - E003; PR - E004; PR - S001; PR - S002; PR - V001; PR - 3D01; PR - 3D02; PR - 3D03; PR - 3D04 received 24.09.2026)