Planning applications in Southwark, August 2025
Page 5 of 5, newest first. Back to the first page for August 2025.
Applications, August 2025
Newest first · page 5 of 5
-
25/AP/2280 Granted
71 Stanbury Road London Southwark SE15 2DA
Construction of L-shaped rear dormer extension together with raising the ridge by 500mm and addition of 2No. of rooflights on front roof slope.
-
25/AP/2282 Granted
118 College Road London Southwark SE21 7HW
Amended Description Works to trees with a TPO: Tree works subject to TPO No 443 and 295 Tree ID 5892 An Oak tree approximately 23m in height, situated on the far left-hand side of the rear garden. Remove Deadwood. Tree ID 5893 A Dawn Redwood tree approximately 16m in height, situated near mid right-hand side of the rear garden. Remove Deadwood. Tree ID 5894 An Oak tree approximately 14m in height, situated near right-hand side of the rear garden. Crown would benefit from a light thinning of overcrowded areas by up to 10%, no other works required A further application willl be made once the result of the PICUS Test is known.
-
25/AP/2281 Awaiting decision
100 Underhill Road London Southwark SE22 0QU
New outbuilding on screw pile foundations to the rear garden
-
25/AP/2283 Awaiting decision
Tower Bridge Business Complex 100 Clements Road Aka Biscuit Factory And Bermondsey Campus Site Keetons Road London SE16 4DG
Details of condition 62 'Noise: Fixed Plant and Equipment' for Buildings 1-4, 5 and ST as required by planning permission ref. 23/AP/2124 dated 12/03/2024 for Demolition, alterations and extension of existing buildings and erection of new buildings comprising a mixed-use scheme including providing new dwellings (Class C3), flexible Class A1/A3/A4/B1/D1/D2, flexible multi-use Class A1/A3/A4/D1 floorspace within retained Block BF-F, and a new secondary school. The development also includes communal amenity space, landscaping, children's playspace, car and cycle parking, installation of plant, new pedestrian, vehicular and servicing routes, the creation of two new pedestrian routes through the Railway Arches and associated works; and Outline planning permission (with all matters reserved) for the part demolition and part retention of existing buildings and erection of two new buildings comprising a mixed-use scheme, providing new homes (Class C3) and flexible multi-use floorspace (Class A1/A3/A4/D1), and other associated works.
-
25/AP/2288 Awaiting decision
34 Alleyn Road London Southwark SE21 8AL
Demolition of the building with retention of the front façade to facilitate the development approved under 24/AP/3809 (amended description)
-
25/AP/2290 Granted
16-54 Newington Causeway London SE1 6DR
Temporary change of use until 31 August 2026 of existing land and buildings to a mixed-use comprising Use Class E(a), (b), (d) and (g)i), and Sui Generis drinking establishment, cinema, event space uses, and other minor alterations incidental to the development.
-
25/AP/2284 Awaiting decision
Tower Bridge Business Complex 100 Clements Road Aka Biscuit Factory And Bermondsey Campus Site Keetons Road London SE16 4DG
Non material amendment to amend condition 62 'Noise: Fixed Plant and Equipment' (to exclude the emergency plant from the noise measuring) of planning permission ref. 23/AP/2124 for 'Demolition, alterations and extension of existing buildings and erection of new buildings comprising a mixed-use scheme including providing new dwellings (Class C3), flexible Class A1/A3/A4/B1/D1/D2, flexible multi-use Class A1/A3/A4/D1 floorspace within retained Block BF-F, and a new secondary school. The development also includes communal amenity space, landscaping, children's playspace, car and cycle parking, installation of plant, new pedestrian, vehicular and servicing routes, the creation of two new pedestrian routes through the Railway Arches and associated works; and Outline planning permission (with all matters reserved) for the part demolition and part retention of existing buildings and erection of two new buildings comprising a mixed-use scheme, providing new homes (Class C3) and flexible multi-use floorspace (Class A1/A3/A4/D1), and other associated works.) Amendments to planning permission 17/AP/4088 and variation of its conditions including: Increase the total number of homes from 1536 to 1624 Increased provision of social rent homes Changes to massing and architecture Changes to the quantum and allocation of non-residential floorspace Removal of block R and basement under block RST with its ramp Revised provision of public realm, playspace and tree planting Enhanced fire strategy for each building Increased communal spaces for residents Reconfigured parking provision Revised energy and overheating strategy).'
-
25/AP/2286 Awaiting decision
35 Tarbert Road London Southwark SE22 8QB
Construction of a ground floor side extension and a basement extension
-
25/AP/2258 Awaiting decision
38-44 Rye Lane London Southwark SE15 5BY
Extension of existing mixed-use building at first and second floors and an upward extension forming third, fourth, and fifth floors comprising 13 x new dwellings; refurbishment and reconfiguration of the existing 11 x dwellings and ground floor retail units; a new plant room and residential lobby at ground floor; associated cycle store and bin store; the installation of new access gates in Highshore Road; and the installation of photovoltaic (PV) arrays at third, fourth, and fifth roof levels.
-
25/AP/2219 Awaiting decision
40-46 Solomons Passage London Southwark SE15 3UH
Deed of variation which proposes to replace the provision of 32 on-site affordable homes with a payment in lieu and a mechanism for securing the payment of deferred contributions from the disposal of those residential units to the council, by amending the section 106 agreement relating to planning permission ref. 20/AP/3285 dated 20 April 2022 (Demolition of all buildings on the site and construction of a development of 91 residential units within four buildings (a 7-storey Block A building, a 6-storey Block B/C building and two buildings in Block D of 2- and 4-storeys), together with alterations to the retained basement, provision of car and cycle parking and landscaping) (as amended). The deed would include the associated amendments to the s106 agreement to delete and replace words, phrases and/or definitions and insert additional definitions, clauses and schedules relating to affordable housing delivery and viability.
Other months in 2025
- January 2025 2
- February 2025 1
- March 2025 2
- April 2025 1
- May 2025 1
- June 2025 2
- July 2025 4
- August 2025 210
- September 2025 292
- October 2025 260
- November 2025 259
- December 2025 315