Planning applications in Southwark, February 2025
Southwark recorded 2 planning applications in February 2025, listed newest first. Dates are as received, or as decided where the council publishes no submission date.
Applications, February 2025
Newest first
-
25/AP/0297 Granted
Land To The Rear Of 54 Nunhead Lane London Southwark SE15 3TU
Erection of a single storey two bedroom dwelling on the land to the rear of 54 Nunhead Lane.
-
25/AP/0277 Decided
Tower Bridge Business Complex 100 Clements Road Aka Biscuit Factory And Bermondsey Campus Site Keetons Road London SE16 4DG
Partial details of condition 88 (Shopfront Strategy) for part a (first part) of condition only, pursuant to planning permission ref. 23/AP/2124 (Demolition, alterations and extension of existing buildings and erection of new buildings comprising a mixed-use scheme including providing new dwellings (Class C3), flexible Class A1/A3/A4/B1/D1/D2, flexible multi-use Class A1/A3/A4/D1 floorspace within retained Block BF-F, and a new secondary school. The development also includes communal amenity space, landscaping, children's playspace, car and cycle parking, installation of plant, new pedestrian, vehicular and servicing routes, the creation of two new pedestrian routes through the Railway Arches and associated works; and Outline planning permission (with all matters reserved) for the part demolition and part retention of existing buildings and erection of two new buildings comprising a mixed-use scheme, providing new homes (Class C3) and flexible multi-use floorspace (Class A1/A3/A4/D1), and other associated works.) Amendments to planning permission 17/AP/4088 and variation of its conditions including: Increase the total number of homes from 1536 to 1624 Increased provision of social rent homes Changes to massing and architecture Changes to the quantum and allocation of non-residential floorspace Removal of block R and basement under block RST with its ramp Revised provision of public realm, playspace and tree planting Enhanced fire strategy for each building Increased communal spaces for residents Reconfigured parking provision Revised energy and overheating strategy).
Other months in 2025
- January 2025 2
- February 2025 2
- March 2025 2
- April 2025 3
- May 2025 5
- June 2025 4
- July 2025 4
- August 2025 211
- September 2025 292
- October 2025 260
- November 2025 259
- December 2025 315