Planning application
Chambers Wharf Chambers Street London SE16 4XQ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details of condition (Construction Environmental Management Plan (CEMP)) pursuant to planning permission 13/AP/4266 (Variation of Condition 34 (approved drawings) of planning permission 11-AP-1875 [related to parent permission 07/AP/1262 which consented the erection of six residential buildings providing 587 residential units and 275 sq. m. of flexible A/B1 floorspace at ground floor level along Chambers Street and 203 sq. m. of Class D1 floorspace along Llewellyn Street] to allow for two additional affordable dwellings to the scheme.)
As published by the council, reference 26/AP/3020
Application record
- Reference
- 26/AP/3020
- Status
- Under consideration/assessment
- Received
- 13 Oct 2026
- Validated
- 14 Oct 2026
- Postcode
- SE16 4XQ
Timeline
Dates from the published record
-
13 Oct 2026
Received by Southwark
-
14 Oct 2026
Validated
Checked as complete and ready for consideration.
-
23 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Southwark took a median of 52 days over the applications it decided in the last year.
What happens while it is decided
This application is with Southwark for determination, against a statutory target of eight weeks. Over the last year Southwark's median decision took 52 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Southwark's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Chambers Wharf Chambers Street London Southwark
Partial discharge of Requirements CHAWF1 (CoCP Part B) of Schedule 3 of the Thames Tideway Utilities Limited (Thames Tideway Tunnel) Order 2014 (as amended) for the Chambers Wharf (CHAWF) worksite to allow for works to be undertaken over the Easter week of 2022.
Granted Conditions 4 docs -
Chambers Wharf Chambers Street London Southwark
Formal application submitted to vary Schedule 3 Requirement CHAWF1 (CoCP Part B) of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 20141 (the Order) (as amended) to allow for vessel loading/ unloading and moving onto/ off the berth at night in line with the approved Phase 6 Section 61.
Granted Conditions 5 docs -
Chambers Wharf Chambers Street London Southwark
Partial discharge of Worksite Construction Logistic Plan (Secondary Lining Phase) pursuant to Requirement PW6 (CoCP Part A Section 5.1.9) of the Schedule 3 of The Thames Tideway Utilities Limited (Thames Tideway Tunnel) Order 2014 (as amended) (hereafter referred to The Order) for the Chambers Wharf Foreshore Thames Tideway Tunnel worksite.
Granted Conditions 12 docs -
Chambers Wharf Chambers Street London Southwark
Partial discharge of Traffic Management Plan (Secondary Lining Phase) pursuant to Requirement CHAWF8 of the Schedule 3 of The Thames Tideway Utilities Limited (Thames Tideway Tunnel) Order 2014 (as amended) (hereafter referred to The Order) for the Chambers Wharf Foreshore Thames Tideway Tunnel worksite.
Granted Conditions 11 docs -
Chambers Wharf Chambers Street London Southwark SE16 4XR
Non-material amendment to planning permission ref: 19/AP/1465 dated 27/08/2019 for: Construction of a new river wall at Chambers Wharf as a flood defence. The proposal includes: Inter-tidal terrace with a planting scheme and safety features.The amendment sought is for:-the proposed change in the chemical composition of the cladding for the river wall (i.e. from Concrete Mix of 38kg of ECO Admixture with an alternative mix consisting of 38kg of limestone filler. -The proposed changes in material also require amendments to two of the plans approved under condition 2 from revision P01 to revision P02.
Decided Conditions 10 docs -
Thames Tideway Tunnel At Chambers Wharf Chambers Street London Southwark
Partially Discharge (external appearance of the hoarding) pursuant to Requirement CHAWF1 (CoCP Part B, Section 4), Schedule 3 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (as amended) for the works at Chambers Wharf Thames Tideway Tunnel worksite only
Granted Conditions 10 docs