Skip to content
PlanIndex Get alerts
Menu

Planning application

47 Copleston Road London Southwark SE15 4AN

Awaiting decision Southwark 26/AP/2759

Works: Trees

Relates to 26/AP/1691

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

TREE PRESERVATION ORDER: (TPO 240 2019) T1 Ash: Remove (fell) to near ground level and treat stump to inhibit regrowth. REASONS FOR WORKS: The above tree is considered to be responsible for root induced clay shrinkage subsidence damage to 76 Avondale Rise, SE15 4AL. This is a re-submission of 26/AP/1691.

As published by the council, reference 26/AP/2759

Application record

Reference
26/AP/2759
Status
Awaiting decision
Received
17 Sep 2026
Validated
17 Sep 2026
Postcode
SE15 4AN

Site history

Applications at this address on the Southwark register

This site has had 2 applications since 2026: 0 approved, 1 refused.

  • 26/AP/1691 Refused

    47 Copleston Road London Southwark SE15 4AN

    Works to tree with a TPO: Tree preservation order:(TPO 240 2019) Tree works - as referenced in the MWA Arboricultural Report: T1 Ash - remove (fell) to near ground level and treat stump to inhibit regrowth. Reasons for works: The above tree is considered to be responsible for root induced clay shrinkage subsidence damage to 76 Avondale Rise, SE15 4AL.

    Decided 27 Jul 2026 Trees

Timeline

Dates from the published record

  1. 17 Sep 2026

    Received by Southwark

  2. 17 Sep 2026

    Added to PlanIndex

  3. 18 Sep 2026

    Status changed to Awaiting decision

    Previously Under consideration/assessment.

  4. Decision

    Awaiting decision

    Decision expected by 12 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Southwark took a median of 51 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 26/AP/1691 Refused

    47 Copleston Road London Southwark SE15 4AN

    Works to tree with a TPO: Tree preservation order:(TPO 240 2019) Tree works - as referenced in the MWA Arboricultural Report: T1 Ash - remove (fell) to near ground level and treat stump to inhibit regrowth. Reasons for works: The above tree is considered to be responsible for root induced clay shrinkage subsidence damage to 76 Avondale Rise, SE15 4AL.

    Decided 27 Jul 2026 Trees

What happens while it is decided

This application is with Southwark for determination, against a statutory target of eight weeks. Over the last year Southwark's median decision took 51 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Southwark's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Flat 3 33 Copleston Road London Southwark SE15 4AN

    23/AP/2686 Submitted 25 Sep 2023 6m away

    Construction of a roof terrace with a 1.7m high privacy screen on the rear roof slope, together with the installation of glazed doors in place of the existing dormer window to provide access to the roof terrace, two rooflights on the front roof slope, including a 'mini dormer' Velux window, and the replacement of the existing rooflight on the side roof slope.

    Granted Full applications Loft or dormer Windows or glazing 14 docs
  • 23A Copleston Road London Southwark SE15 4AN

    26/AP/1005 Submitted 8 Apr 2026 20m away

    Construction of single storey outbuilding and shed at the rear of the garden incidental to the main dwelling.

    Granted Full applications 25 docs
    Small domestic
  • 4 Danby Street London Southwark SE15 4BU

    26/AP/0356 Submitted 5 Feb 2026 35m away

    Erection of L-shaped rear roof dormer extension with ridge raised by 400mm and addition of three rooflights to the front roof slope, also alterations proposed to the ground floor rear and side fenestration.

    Granted Householder Extension Loft or dormer +1 24 docs
    Domestic
  • 5 Danby Street London Southwark SE15 4BS

    22/AP/1715 Submitted 17 May 2022 36m away

    Construction of ground floor side and rear extension

    Granted Householder Extension 13 docs
    Domestic
  • 13A Copleston Road London Southwark SE15 4AN

    22/AP/0541 Submitted 22 Feb 2022 48m away

    Construction of a new side extension to the lower ground floor including alterations to the boundary fencing.

    Granted Full applications Extension 28 docs
  • 13A Copleston Road London Southwark SE15 4AN

    22/AP/3254 Submitted 12 Sep 2022 48m away

    91% historically approved · decision due ~25 Jan

    Subdivision of apartment to create two apartments

    Awaiting decision Full applications New dwelling 29 docs
    Several homes