Skip to content
PlanIndex Get alerts
Menu

Planning application

74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY

Awaiting decision Southwark 26/AP/2463 Approval of Details

Works: Extension Demolition Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Details of Condition 3 (Hard and soft landscaping scheme) as required by full planning permission 23/AP/3112 dated 02/02/2024 for 'Variation of Condition 1 (Approved plans) to planning permission 18/AP/2840 'Variation of Condition 1 (Approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and Boundary fencing.' for the following amendments - Adjustments to the fenestration and shop fronts on the Blenheim Grove building - Adjustment and addition of ventilation louvres - Changes to the internal layouts - Former Use Classes A1, A2, A3, A5, B1a and D1 to be Use Classes E (Commercial, business and service) and F2 (Local community) - Modification of the number and location of columns beneath Platform 3 on the north side of the square - Modification of the platform screen forming the south face of Platform 3 at high level'

As published by the council, reference 26/AP/2463

Application record

Reference
26/AP/2463
Type
Approval of Details
Status
Under consideration/assessment
Received
17 Aug 2026
Validated
18 Aug 2026
Ward
Rye Lane
Parish
Peckham And Nunhead
Postcode
SE15 4RY

Site history

Applications at this address on the Southwark register

This site has had 4 applications since 2019: 2 approved, 0 refused.

  • 26/AP/0713 Granted

    74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY

    Details of Condition 14 (Surface water drainage strategy) pursuant to planning permission 23/AP/3112 (Variation of Condition 1 (Approved plans) to planning permission 18/AP/2840 'Variation of Condition 1 (Approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and Boundary fencing.' for the following amendments: - Adjustments to the fenestration and shop fronts on the Blenheim Grove building - Adjustment and addition of ventilation louvres - Changes to the internal layouts - Former Use Classes A1, A2, A3, A5, B1a and D1 to be Use Classes E (Commercial, business and service) and F2 (Local community) - Modification of the number and location of columns beneath Platform 3 on the north side of the square - Modification of the platform screen forming the south face of Platform 3 at high level)

    Decided 22 Jun 2026 Conditions
  • 23/AP/2042 Decided

    74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY

    Non-material amendment to planning permission ref. 18/AP/2840 dated 29/11/2018 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works) to change to the wording of condition 9 "Details of Security Measures", to allow for sequential occupation of the project.

    Decided 11 Aug 2023 Conditions
  • 19/AP/6159 Granted

    74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY

    Details of part of Condition 5 - details of a surface water drainage strategy for phase one (2-10 Blenheim Grove only) as required by planning permission dated 29/11/2018 ref. 18/AP/2840 (for 'Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising: Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts.')

    Decided 26 Feb 2020 Conditions

Timeline

Dates from the published record

  1. 17 Aug 2026

    Received by Southwark

  2. 18 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 19 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 13 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Southwark took a median of 52 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Landolt + Brown Ltd Agent

4 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

  • VALID APPLICATION LETTER WITH INVOICE Valid Application Letter · 19 Aug 2026
  • GENERAL ARRANGEMENT LANDSCAPE PLAN Plan - General · 18 Aug 2026
  • RENDERED LANDSCAPE PLAN ILLUSTRATING LAYOUT OF STONE COLOURS AND BRICK PAVING Plan - General · 18 Aug 2026
  • TYPICAL PLANTER SEAT DETAILS PLAN AND SECTION PLANS Plan - General · 18 Aug 2026
  • PHASE 2 DETAILED PLANTING PLAN Plan - General · 18 Aug 2026
  • PLANNING NOTICE CONDITION DISCHARGE SUBMISSION PARTICULARS OF DECISION SECTION 6 Document · 18 Aug 2026
  • LIGHTING COLUMN DETAILS Plan - General · 18 Aug 2026
  • PROPOSED FLOOR INTERFACE DETAILS 2 OF 3 Plan - Proposed · 18 Aug 2026
  • PROPOSED FLOOR INTERFACE DETAILS 3 OF 3 Plan - General · 18 Aug 2026
  • PHYSICAL SAMPLES ARE AVAILABLE FOR INSPECTION Plan - General · 18 Aug 2026
  • PROPOSED FLOOR INTERFACE DETAILS 1 OF 3 Plan - Proposed · 18 Aug 2026
  • PROPOSED TYPICAL PLANTER DETAILS Plan - Proposed · 18 Aug 2026
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application - Form (Without Personal data) · 17 Aug 2026
  • COVER LETTER Planning statement · 17 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Southwark for determination, against a statutory target of eight weeks. Over the last year Southwark decided condition discharge and variation applications in a median of 49 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Peckham Rye Railway Station Station Way And 1-4 Holly Grove London Southwark SE15 4RX

    26/AP/2415 Submitted 12 Aug 2026 50 yards away

    Partial discharge of condition 3(c), (e) and (f) (Windows, Internal And External Doors) as required by planning permission ref. 22/AP/1329 dated ref. 13/09/2022 for 'Listed Building Consent for partial demolition and alteration of Peckham Rye Station and formation of a new triple height concourse to the rear to provide additional circulation space, stairs and lifts and 3 storey extension onto Holly Grove provide lifts and stairs, an electrical substation and station support accommodation. Provision of an additional stair and lift on platform 1. Remodelling of the booking hall to improve station facilities and accessibility, including the creation of a new structural opening through to the new concourse building. Reinstatement of loss plasterwork and joinery in th booking hall. Reinstatement of cast iron and glazed canopy to the east elevation. Reopening of blocked up openings south elevation (booking hall) west elevation (waiting room) and installation of new timber windows, doors and associated joinery'.

    Granted Extension Demolition +1
  • 11A Station Way London Southwark SE15 4RX

    22/AP/4085 Submitted 30 Nov 2022 50 yards away

    Listed building consent for the retention of a replacement ventilation and extraction system.

    Granted Heritage and listed buildings 29 docs
  • 11A Station Way London Southwark SE15 4RX

    22/AP/4084 Submitted 30 Nov 2022 50 yards away

    Retention of replacement ventilation and extraction system.

    Refused Full applications 25 docs
  • Peckham Rye Railway Station Station Way London Southwark SE15 4RX

    19/AP/7489 Submitted 18 Dec 2019 50 yards away

    Reopening of staircase to Platform 4 including installation of windows in voids of north elevation, demolition of existing blockwork wall and door, and installation of new stair treads, handrails and lighting

    Granted Heritage and listed buildings Demolition Windows or glazing 19 docs
  • 74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY

    23/AP/2042 Submitted 21 Jul 2023 50 yards away

    Non-material amendment to planning permission ref. 18/AP/2840 dated 29/11/2018 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works) to change to the wording of condition 9 "Details of Security Measures", to allow for sequential occupation of the project.

    Decided Conditions Extension Demolition 6 docs
  • Peckham Rye Railway Station Station Way London Southwark SE15 4RX

    22/AP/0249 Submitted 28 Jan 2022 50 yards away

    Patial Discharge of Condition 2 (Material Samples), as required by planning permission dated 04/11/2021 [LBS Ref 21/AP/3272] for 'Repair of main roof covering, gutter repairs reconfiguring of rainwater goods/ gutters. Reinstatement of the lost decorative cresting to the main roof. Replacement of life expired slate to the four wing roofs with patent clay tiles to the building's original Victorian design and installation of thermal insulation to ceilings below. Installation of architectural lighting to the front facade. Replacement of existing pigeon deterrent. Stone work repairs. Steam clean of the brick and stonework. Repair/ replacement of external doors and windows. Redecoration of external metal work. The refurbishment of the internal south east wing stairway including installation of glass safety screen'.

    Granted Conditions Roofing Windows or glazing 14 docs

In Southwark

  • 26/AP/1686 Granted

    Aylesbury Estate Land Bounded By Albany Road Portland Street Bagshot Street Alvey Street East Street And Dawes Street London SE17

    Non-material amendment to planning permission ref: 14/AP/3844 dated 05.08.2015 (and variation of associated legal agreement) for the '...demolition of existing buildings and phased redevelopment to provide a mixed use development comprising a number of buildings ranging between 2 to 20 storeys in height (12.45m - 68.85m AOD) with capacity for up to 2,745 residential units (Class C3), up to 2,500sqm of employment use (Class B1); up to 500sqm of retail space (Class A1); 3,100 to 4,750sqm of community use; medical centre and early years facility (Class D1); in addition to up to 3,000sqm flexible retail use (Class A1/A3/A4) or workspace use (Class B1); new landscaping; parks, public realm; energy centre; gas pressure reduction station; up to 1,098 car parking spaces; cycle parking; landscaping and associated works.' Amendments sought: -Trigger points of Conditions 5 (Surface water stratgy), 7 (Drainage details), 10 (Site contamination), 12 (Advanced infrastructure and enabling works) amended to exclude demolition works. -Variation of associated S106 (Clause 7.1) to alter demolition sequencing (early demolition of 1-240 Wendover sought)

    Received 10 Jun, published by the council 25 Jul 2026 Conditions
  • 26/AP/1633 Granted

    49-53 Surrey Row London SE1

    Deed of Variation to amend the Section 106 Agreement associated with planning permission ref: 98/AP/1754

    Received 5 Jun, published by the council 25 Jul 2026 Conditions
  • 26/AP/1592 Granted

    Aylesbury Estate Land Bounded By Albany Road Portland Street Bagshot Street Alvey Street East Street And Dawes Street London SE17

    Deed of variation to amend Schedule 3, paragraph 16 (Car Club Scheme) in relation to Plot 18 / Development Phase 2A of the section 106 agreement attached to planning permission ref. 14/AP/3844 date 05.08.2015 for 'Demolition of existing buildings and redevelopment to provide a mixed use development comprising a number of buildings ranging between 2 to 20 storeys in height (9.45m - 72.2m AOD), providing 830 residential dwellings (Class C3); flexible community use, early years facility (Class D1) or gym (Class D2); public and private open space; formation of new accesses and alterations to existing accesses; energy centre; gas pressure reduction station; associated car and cycle parking and associated works.'

    Received 4 Jun, published by the council 25 Jul 2026 Conditions
  • 26/AP/2250 Granted

    Rich Industrial Estate Crimscott Street And Willow Walk London Southwark SE1 5TE

    Deed of Variation to amend the Section 106 Agreement associated with planning permission ref: 20/AP/2993, to amend the definition of Social Rented Housing to meet the requirements of the Rent Standard and deletion of Paragraph 5.3 in Schedule 3 to remove the service charge cap.

    Received 28 Jul, published by the council 9 Aug 2026 Conditions
  • 26/AP/2658 Awaiting decision

    Camberwell Police Station 9 Wren Road London Southwark SE5 8QP

    Details of Condition 2 'Method Statement and Schedule of Works' required by listed building consent ref. 26/AP/1608 'Listed building consent for proposed internal and external alterations to facilitate the conversion of the former Camberwell Police Station to create a mixed-use building comprising of Class E or Sui Generis at ground and lower ground floors and short stay, bed and breakfast accommodation (Use Class C1) at first and second floors.'

    Received 7 Sep, published by the council 10 Sep 2026 Conditions