Peckham Rye Railway Station Station Way And 1-4 Holly Grove London Southwark SE15 4RX

Awaiting decision Southwark 26/AP/2415

Works: Extension Demolition Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Partial discharge of condition 3(c), (e) and (f) (Windows, Internal And External Doors) as required by planning permission ref. 22/AP/1329 dated ref. 13/09/2022 for 'Listed Building Consent for partial demolition and alteration of Peckham Rye Station and formation of a new triple height concourse to the rear to provide additional circulation space, stairs and lifts and 3 storey extension onto Holly Grove provide lifts and stairs, an electrical substation and station support accommodation. Provision of an additional stair and lift on platform 1. Remodelling of the booking hall to improve station facilities and accessibility, including the creation of a new structural opening through to the new concourse building. Reinstatement of loss plasterwork and joinery in th booking hall. Reinstatement of cast iron and glazed canopy to the east elevation. Reopening of blocked up openings south elevation (booking hall) west elevation (waiting room) and installation of new timber windows, doors and associated joinery'.

As published by the council, reference 26/AP/2415

Application record

Reference
26/AP/2415
Status
Under consideration/assessment
Received
12 Aug 2026
Validated
13 Aug 2026
Postcode
SE15 4RX

Timeline

Dates from the published record

  1. 12 Aug 2026

    Received by Southwark

  2. 13 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 14 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 8 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Southwark took a median of 52 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Southwark for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Southwark is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • 11A Station Way London Southwark SE15 4RX

    22/AP/4085 Submitted 30 Nov 2022 0m away

    Listed building consent for the retention of a replacement ventilation and extraction system.

    Granted Heritage and listed buildings 29 docs
  • Peckham Rye Railway Station Station Way London Southwark SE15 4RX

    26/AP/1942 Submitted 3 Jul 2026 0m away

    95% historically approved · decision due ~3 Sep

    Certificate of lawfulness (existing) to confirm that planning permission 22/AP/1006 was lawfully implemented within the prescribed time period

    Awaiting decision
  • 11A Station Way London Southwark SE15 4RX

    22/AP/4084 Submitted 30 Nov 2022 0m away

    Retention of replacement ventilation and extraction system.

    Refused Full applications 25 docs
  • Peckham Rye Railway Station Station Way London Southwark SE15 4RX

    19/AP/7489 Submitted 18 Dec 2019 17m away

    Reopening of staircase to Platform 4 including installation of windows in voids of north elevation, demolition of existing blockwork wall and door, and installation of new stair treads, handrails and lighting

    Granted Heritage and listed buildings Demolition Windows or glazing 19 docs
  • 74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY

    23/AP/2042 Submitted 21 Jul 2023 20m away

    Non-material amendment to planning permission ref. 18/AP/2840 dated 29/11/2018 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works) to change to the wording of condition 9 "Details of Security Measures", to allow for sequential occupation of the project.

    Decided Conditions Extension Demolition 6 docs
  • Peckham Rye Railway Station Station Way London Southwark SE15 4RX

    25/AP/2450 Submitted 26 Aug 2025 28m away

    Certificate of lawful development (proposed) to secure the material commencement of the development approved under Listed Building Consent 22/AP/1329 dated 13/09/2022 for partial demolition and alteration of Peckham Rye Station and formation of a new triple height concourse to the rear to provide additional circulation space, stairs and lifts and 3 storey extension onto Holly Grove provide lifts and stairs, an electrical substation and station support accommodation. Provision of an additional stair and lift on platform 1. Remodelling of the booking hall to improve station facilities and accessibility, including the creation of a new structural opening through to the new concourse building. Reinstatement of loss plasterwork and joinery in the booking hall. Reinstatement of cast iron and glazed canopy to the east elevation. Reopening of blocked up openings south elevation (booking hall) west elevation (waiting room) and installation of new timber windows, doors and associated joinery. The proposals include plaster and brickwork exploratory in the station office area.

    Granted Lawful development Extension Demolition +1 6 docs