Planning application
26/AP/2209
Flat Above 234 Rye Lane London Southwark SE15 4NL
Proposal
Roof extension and refurbishment works
As published by the council, reference 26/AP/2209
Timeline
Dates from the published record
-
24 Jul 2026
Received by Southwark
-
27 Jul 2026
Validated
Checked as complete and ready for consideration.
-
1 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Southwark for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
22/AP/3892 Granted
200 Rye Lane London Southwark SE15 4NF
Certificate of lawfulness (existing) for installation of kitchen extract duct and shed building to the rear of the premises.
-
22/AP/1953 Granted
190 And 190A Rye Lane London Southwark SE15 4NF
Part details of condition 4C (Noise Insulation - Validation Report) pursuant to planning permission 20/AP/1055 (Change of use of the basement and part ground floor level from a restaurant (Class A3) to a gymnasium (Class D2))
-
20/AP/2340 Granted
Land To Rear Of 293-295 Rye Lane London Southwark SE15 4UA
Construction of 1 bed 2 person, two-storey maisonette flat with rooftop amenity area on land to rear of 293-295 Rye Lane.
-
26/AP/0869 Awaiting decision
221 Rye Lane London Southwark SE15 4TP
Details of Condition 3 (CEMP) required by planning permission ref. 24/AP/2188 'Erection of a 5 storey building comprising ground floor café (Class E) and a 11 bedroom hotel (Class C1) following demolition of existing single storey Hot Food Takeaway (Sui Generis) unit'.
-
26/AP/1928 Awaiting decision
211 Rye Lane London Southwark SE15 4TP
Retrospective change of use from a shop (Use Class A1, now Class E(a)) to a delivery-only dark kitchen (sui generis), comprising five commercial kitchen units.
-
26/AP/1058 Granted
Flat 2 6 Philip Walk London Southwark SE15 3NH
Installation of a window to the side elevation of flat 2.
Other full applications applications
In Southwark
-
25/AP/2512 Granted
205 Rye Lane London Southwark SE15 4TP
Demolition of the rear part of the single storey shop structure at 205 Rye Lane. Construction of a two storey residential maisonette infill at 44 Bournemouth Close, with associated external works.
-
26/AP/2251 Awaiting decision
Flat 1 162B Underhill Road London Southwark SE22 0QH
Construction of garden outbuilding, to be used as a home office, and all associated works
-
26/AP/2259 Awaiting decision
64 Abercorn Way London Southwark SE1 5HL
Prior approvaL for Erection of a single-storey rear extension projecting 5.4 metres from the original rear elevation of the property.
-
26/AP/1773 Granted
5 Copleston Road London Southwark SE15 4AN
Replacement of all existing single-glazed timber windows with white double-glazed uPVC units (sash to front; casement to rear and sides), and replacement of all existing timber doors with new composite front doors and a uPVC rear door.
-
26/AP/1234 Granted
Unit 2 And Unit 7 313-349 Ilderton Road London Southwark SE19 1NW
Temporary change of use of Units 2 and 7 from light industrial (Class E(g)(iii)) to a widened set of commercial (Class E(c), E(d), E(e) and E(g)) uses for a period of 3 years.