Skip to content
PlanIndex Get alerts
Menu

Planning application

26/AP/1882

210 Camberwell Grove London Southwark SE5 8RJ

Awaiting decision Southwark Listed Building Consent

Proposal

Listed building consent for retention of basement damp remediation works including removal of tanking and render and application of lime plaster to front wall and front porch, and the proposed works for the reinstatement of finishes to the basement front wall, and for installation of ventilation to the front room, under-stairs room, rear bedroom and bathroom and replacement of the flat roof with a polyurethane covering incorporating lead flashings and capping.

As published by the council, reference 26/AP/1882

Timeline

Dates from the published record

  1. 29 Jun 2026

    Received by Southwark

  2. 29 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 3 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Southwark for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • 26/AP/1946 Granted

    199B Camberwell Grove London Southwark SE5 8JU

    T1 - Self sown medium Holm oak, growing against base of wall. Section fell to ground level and poison stump. Plant 1 x replacement Persian Silk tree or Pear. T2 - Medium Mimosa tree. Crown thin canopy by 20%, reduce canopy south east direction by 10% and remove 2 small lower branches in south east direction. Reduce elongated upper branch by 2m.

    6 Jul 2026 52m away Trees
  • 26/AP/1622 Granted

    189 Camberwell Grove London Southwark SE5 8JU

    Works to tree in a conservation area: (T2) Box Elder Box Elder in rear garden - Crown reduce by 30% to previous reduction points. To maintain the tree at the same extent at those dimensions every 2-3 years, for a period not exceeding 6 years (after which a new application will be made).

    8 Jun 2026 52m away Trees
  • 22/AP/3655 Granted

    Springfield Lodge 1 Grove Hill Road London Southwark SE5 8DF

    Works to trees in a Conservation Area: T1 - Mixed vegetation - cut back overhang to wall / kerb line. Clear around cameras removing ivy from fittingsT2 - Lime - Crown lift to provide 3metres clearance from ground level. Remove basal and epicormic growthT3 - Mixed Vegetation - cut back to clear vegetation from building and pathwayT4 - Ivy / Vine - Cut back vegetation close to rear right hand side and rear boundary wall/ fenceT5 - Elder - Make new pollard at crown break. Sever ivyT7 - Common Horse Chestnut - Sever and remove ivy from base up to crown break.T8 - Gleditsia - Tree appears to be under stress. Clear a 0.5m circle around the base of the tree from vegetation. Supply and apply a complete fertiliser around the base of the tree. Supply and spread a bag of bark chipping around the base to keep weed growth clear.T9 - 7x Ash / Sycamore - Remove major deadwood throughout whole crown area. Crown lift 4m. Shorten back low branches from building by 3m. Sever ivy. Remove self sets at base.

    20 Oct 2022 59m away Trees
  • 26/AP/1250 Awaiting decision

    72 Harfield Gardens Grove Lane London Southwark SE5 8DB

    Variation of Condition 1- Subject to a number of planning conditions 25/AP/2456 dated 10/11/2025 for Construction of a ground floor side extension with 4no. rooflights, rear patio and pergola, garage conversion, facade alterations and all associated works. The amendment seeks to alter the approved windows and rooflights within the property.

    30 Apr 2026 66m away Amendments
  • 26/AP/1236 Granted

    Flat 8 Karen Court Grove Lane London Southwark SE5 8DA

    Windows replacement

    29 Apr 2026 89m away Full applications
  • 26/AP/1446 Granted

    Karen Court Grove Lane London Southwark SE5 8DA

    Five day notification for tree works: T1 Silver Tree, approximately 8 metres in height - Fell dead tree to ground level situated at the front of the property by the footpath.

    18 May 2026 98m away Trees

In Southwark

  • 26/AP/1813 Granted

    The School Of Historical Dress 52 Lambeth Road London Southwark SE1 7PP

    Listed building consent for repairs to parapet wall to prevent water ingress. General mortar pointing repairs.

    22 Jun 2026 Heritage and listed buildings
  • 26/AP/1408 Granted

    73A Peckham Road London Southwark SE5 8UH

    Listed Building Consent for the replacement of the unauthorised UPVC front entrance door with a timber heritage door. (revised description)

    15 May 2026 Heritage and listed buildings
  • 26/AP/0879 Granted

    Anchor 1 Bankside London Southwark SE1 9DN

    Remove the redundant kitchen and service area to the mezzanine area and provide a new bar servery including backfitting and counter

    25 Mar 2026 Heritage and listed buildings
  • 26/AP/2178 Awaiting decision

    Bridge Masters House Tower Bridge Tower Bridge Road London Southwark SE1 2UP

    Listed building consent for internal alterations - removal of stud partitions installed post construction, and installation of stud partitions and doors

    23 Jul 2026 Heritage and listed buildings
  • 26/AP/1240 Granted

    Anchor 1 Bankside London Southwark SE1 9DN

    Listed building consent for Installation of replacement signs to include 2x pictorial projecting sign, 1x 3D Anchor, 4x fascia signs, 2x menu cases, 2x door plaques, 1 large lantern, 9x small lanterns 1x set of building numbers and repainting of the exterior windows and doors by others

    29 Apr 2026 Heritage and listed buildings