Planning application
Dulwich Leisure Centre 2B Crystal Palace Road London Southwark SE22 9HB
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Listed building consent for the installation of air source heat pumps with acoustic barriers, installation of an electric substation, and replacement of the pool and gym windows upgraded to Part L thermal performance with a timber finish.
As published by the council, reference 26/AP/0391
Application record
- Reference
- 26/AP/0391
- Type
- Listed Building Consent
- Status
- Under consideration/assessment
- Received
- 9 Feb 2026
- Validated
- 10 Feb 2026
- Ward
- Goose Green
- Parish
- Dulwich
- Postcode
- SE22 9HB
Site history
Applications at this address on the Southwark register
This site has had 4 applications since 2026.
-
26/AP/1228 Awaiting decision
Dulwich Leisure Centre 2B Crystal Palace Road London Southwark SE22 9HB
Listed building consent for the installation of roof-mounted solar photovoltaic panels and associated infrastructure.
-
26/AP/1227 Awaiting decision
Dulwich Leisure Centre 2B Crystal Palace Road London Southwark SE22 9HB
Installation of roof-mounted solar photovoltaic panels and associated infrastructure.
-
26/AP/0390 Awaiting decision
Dulwich Leisure Centre 2B Crystal Palace Road London Southwark SE22 9HB
Installation of 6no. air source heat pumps with acoustic barriers, installation of an electric substation and the formation of a dropped kerb with the relocation of cycle parking spaces, and replacement of the pool and gym windows upgraded to Part L thermal performance with a timber finish.
Timeline
Dates from the published record
-
9 Feb 2026
Received by Southwark
-
10 Feb 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 7 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Southwark took a median of 51 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Architype Ltd Agent, registered in Hereford
Active · incorporated 2003 · Hereford
20 applications on PlanIndex · across 6 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
31 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Southwark for determination, against a statutory target of eight weeks. Over the last year Southwark decided heritage and listed building applications in a median of 65 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Dulwich Leisure Centre 2B Crystal Palace Road London Southwark SE22 9HB
95% historically approved · decision due ~7 Apr
Installation of 6no. air source heat pumps with acoustic barriers, installation of an electric substation and the formation of a dropped kerb with the relocation of cycle parking spaces, and replacement of the pool and gym windows upgraded to Part L thermal performance with a timber finish.
Awaiting decision Other Windows or glazing 42 docs -
39 East Dulwich Rd London Southwark SE22 9AN
Details of Condition 12 (Refuse Storage) pursuant to planning permission 21/AP/2308 (Partial-demolition of existing building and construction of extensions to create part three, part-four, part-five storey building; upgrading and reconfiguration of existing 8 flats and development of 9 additional residential units (four x 1 bedroom flats, three x 2 bedroom flats, two x 3 bedroom flats) with private amenity, cycle parking and refuse storage.)
Granted Conditions New dwelling Extension +1 8 docsSeveral homes -
39 East Dulwich Road London Southwark SE22 9AN
Discharge of S106 Obligation (Schedule 3, Part 4 - Highway Works - ref: LEG/RP/PL/S106/RR020/261) pursuant to 21/AP/2308 [Partial-demolition of existing building and construction of extensions to create part-three, part-four, part-five storey building; upgrading and reconfiguration of existing 8 flats and development of 9 additional residential units (four x 1 bedroom flats, three x 2 bedroom flats, two x 3 bedroom flats) with private amenity, cycle parking and refuse storage].
Decided Conditions New dwelling Extension +1 6 docsSeveral homes -
39 East Dulwich Road London Southwark SE22 9AN
96% historically approved · decision due ~15 Oct
Details of condition 9 'Cycle storage' pursuant to planning permission 21/AP/2308 'Partial-demolition of existing building and construction of extensions to create part-three, part-four, part-five storey building; upgrading and reconfiguration of existing 8 flats and development of 9 additional residential units (four x 1 bedroom flats, three x2 bedroom flats, two x 3 bedroom flats) with private amenity, cycle parking and refuse storage.'
Awaiting decision Conditions New dwelling Extension +1 6 docsSeveral homes -
39 East Dulwich Road London Southwark SE22 9AN
96% historically approved · decision due ~16 Mar
Discharge of planning obligation Schedule 3, Clause 1.1 (Section 278 Highway Works Specification) of the S106 agreement for planning permission 21/AP/2308 Partial-demolition of existing building and construction of extensions to create part- three, part-four, part-five storey building; upgrading and reconfiguration of existing 8 flats and development of 9 additional residential units (four x 1 bedroom flats, three x 2 bedroom flats, two x 3 bedroom flats) with private amenity, cycle parking and refuse storage.
Awaiting decision Conditions New dwelling Extension +1 11 docsSeveral homes -
39 East Dulwich Road London Southwark SE22 9AN
97% historically approved · decision due ~19 Nov
Variation of Condition 1 (Approved Plans) pursuant to planning permission 21/AP/2308 dated 20/01/2022 for 'Partial-demolition of existing building and construction of extensions to create partthree, part-four, part-five storey building; upgrading and reconfiguration of existing 8 flats and development of 9 additional residential units (four x 1 bedroom flats, three x 2 bedroom flats, two x 3 bedroom flats) with private amenity, cycle parking and refuse storage'. The amendments include the following: - to amend certain elements of the design which include changes to internal layouts, minor adjustments to the external envelope, and the inclusion of a lift.
Awaiting decision Amendments New dwelling Extension +1 14 docsSeveral homes
Other heritage and listed building applications
In Southwark
-
26/AP/1924 Granted
Railway Arches 1 To 2 Crucifix Lane London Southwark SE1 3JW
Listed building consent for the change of use of Arches 1-2 Crucifix Lane to flexible uses under Class E (a),(b), (c), (d), (g)(ii) and (g)(iii)) and Drinking Establishment (Sui Generis) and associated internal and external alteration works.
-
26/AP/1792 Granted
Camberwell School Of Arts And Crafts 61 - 65 Peckham Road London Southwark SE5 8UF
Listed building consent for the installation of a Cat ladder and edge protection to a section of the first floor pitched roof on the north and west elevations of Block D
-
26/AP/0792 Granted
11 Portland Street London Southwark SE17 2PF
Listed building consent for internal alterations including replacement of floorboards and partitions
-
26/AP/2376 Awaiting decision
13 Shad Thames London Southwark SE1 2PB
Openreach to provide a Full Fibre Infrastructure network into the property, this involves bringing full fibre cabling in from the Openreach external network, via the existing duct work into the property, and running via the basement through existing metal trunking, to the risers and false ceiling voids of the property where we will be leaving POU (point of entry boxes) outside the internal flat doors ready for tenants to place orders for service. This is necessary as part of Openreach's exchange closure programme, the property currently does not benefit from full fibre and will be directly affected when Openreach closed Southwark Telephone Exchange and the PSTN Switch off goes ahead in January 2027.
-
26/AP/1723 Granted
16 Trafalgar Avenue London Southwark SE15 6NR
Listed building consent for the partial repair and reconstruction of impact-damaged sections of the existing boundary wall, including rebuilding of collapsed brick piers and wall sections using salvaged and matching materials where practicable, and like-for-like replacement of the damaged wrought iron gate. Existing undamaged sections of wall are to be retained.