Skip to content
PlanIndex Get alerts
Menu

Planning application

79 Crofton Road London Southwark SE5 8LZ

Awaiting decision Southwark 25/AP/2961 Certificate of Lawful Dev. - Proposed

Works: Extension Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Certificate of lawfulness (proposed) for replacement of bathroom windows on side elevation of outrigger with larger windows of with matching proportion. Obscure glass to be used on both/all glazing. Both windows to feature a fixed lower panel, a minimum of 1700mm from internal FFL and top-hung openable vent light above.

As published by the council, reference 25/AP/2961

Application record

Reference
25/AP/2961
Type
Certificate of Lawful Dev. - Proposed
Status
Under consideration/assessment
Received
13 Oct 2025
Validated
13 Oct 2025
Ward
St Giles
Postcode
SE5 8LZ

Timeline

Dates from the published record

  1. 13 Oct 2025

    Received by Southwark

  2. 10 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 8 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Southwark took a median of 52 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in London

5 applications on PlanIndex · across 4 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Southwark for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About lawful development applications

How this application type works

A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.

More on lawful development applications in our guide

Nearby applications

Within 500 metres

  • 83 Crofton Road London Southwark SE5 8LZ

    26/AP/1308 Submitted 7 May 2026 10m away

    Excavation of basement with rear side infill extension and L-shaped rear dormer extension with 2no. rooflights to the front roof slope

    Refused Householder Extension Loft or dormer 20 docs
    Domestic
  • 90 Crofton Road London Southwark SE5 8NA

    22/AP/1332 Submitted 7 Feb 2022 57m away

    Ground floor side infill and rear extension with oriel window, skylight, and internal courtyard.

    Granted Full applications Extension Windows or glazing 16 docs
  • Flat A 100 Bushey Hill Road London Southwark SE5 8QQ

    22/AP/2359 Submitted 4 Jul 2022 59m away

    Construction of wraparound extension, floor plan re-design and all associated works

    Granted Full applications Extension 13 docs
  • 55A And 55B Crofton Road London Southwark SE5 8LY

    22/AP/2283 Submitted 27 Jun 2022 65m away

    Replacement of windows and garden doors of 2 No. self-contained converted flats with double glazed white coloured UPVC sliding sash and casement styles to front elevation and top hung over top hung casement styles to rear elevation.Replacement of main entrance front door with a Composite door. All replacements to match existing styles and sizes.

    Granted Full applications New dwelling Windows or glazing 11 docs
  • 75 Bushey Hill Road London Southwark SE5 8QQ

    22/AP/3709 Submitted 26 Oct 2022 76m away

    Details of Condition 4 (details of the means of enclosure for all site boundaries) as required by planning permission dated 12/08/2021 [LBS Ref: 21/AP/1567] for 'Minor material amendment to plans of the previously approved planning permission ref: 20/AP/1103 granted on 10/06/2020 for: (Demolition of existing single storey studio and construction of a new 2-bedroom house; together with construction of a single storey ground floor side return extension to existing dwelling house) to allow the following changes:- Internal alteration to layout of the rooms, room sizes and otherfacilities within the house- Reduce basement size,- Retain rear garden level- Remove proposal for additional rooflights set in the garden- Rear extension/outrigger to be increased in depth by 0.86mand reduced its width by 1.31m.- Provision of cycle and refuse bins store within front courtyard- Enlargements of the proposed building at the ground floor front- Increase in the depth of the rear outrigger- Increase in roof height- changes to elevational brick work, fenestration and roofingmaterials- Removal of side chimney'.

    Granted Conditions Extension Loft or dormer +2 21 docs
    Small domestic
  • 75 Bushey Hill Road London Southwark SE5 8QQ

    22/AP/3531 Submitted 11 Oct 2022 76m away

    Variation of Condition 1 (Approved Plans) pursuant to planning permission 21/AP/1567 granted on 12/08/2021 for: (Minor material amendment to plans of the previously approved planning permission ref: 20/AP/1103 granted on 10/06/2020 for: (Demolition of existing single storey studio and construction of a new 2-bedroom house; together with construction of a single storey ground floor side return extension to existing dwelling house) to allow the following changes:-Installation of eighteen photovoltaic panels on the roof and of the same colour as the Zinc roof-Omission of all 7 windows from the gable end (i.e. side elevation) -Change two separate windows at each level of the rear outrigger in to a single window.

    Granted Amendments Extension Demolition +1 15 docs
    Small domestic

In Southwark

  • 26/AP/1316 Granted

    Seavington House Champion Hill London Southwark SE5 8DN

    Certificate of lawfulness (proposed) to confirm excavation works carried out on the site in the form of trial pits constitute a material operation under the Town and Country Planning Act 1990 and therefore represent lawful commencement of the approved planning permission 22/AP/0174.

    7 May 2026 Lawful development
  • 26/AP/1420 Granted

    40 Strathnairn Street London Southwark SE1 5BL

    Certificate of lawfulness (proposed) for construction of a ground floor rear extension and a rear dormer.

    18 May 2026 Lawful development
  • 26/AP/1618 Granted

    252 Barry Road London Southwark SE22 0JS

    Certificate of lawful development (proposed) for the construction of a rear dormer extension.

    5 Jun 2026 Lawful development
  • 26/AP/1577 Granted

    Residence Inn By Marriott London Bridge 201-211 Long Lane London SE1 4PN

    Certificate of lawfulness (proposed) for undertaking of facade remedial works to remove combustible cladding materials and replace with a like-for-like non-combustible cladding with no change to the outer aesthetics of the building.

    2 Jun 2026 Lawful development
  • 26/AP/1509 Withdrawn

    Railway Arch 101 Rockingham Street London Southwark SE1 6PD

    Certificate of lawfulness (proposed) for confirmation of implementation of planning permission 22/AP/3065: Change of use of the railway arch at 101 Rockingham Street from Use Class B8 (Storage/Distribution) to Use Classes E (Commercial, Business and Service) and F2 (Local Community) and a new glazed facade to the exterior including 2x extractor fans.

    27 May 2026 Lawful development