Skip to content
PlanIndex Get alerts
Menu

Planning application

Bridgemasters House Duchess Walk London Southwark SE1 2RF

Awaiting decision Southwark 25/AP/2549 Minor application

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Amendments to the rear facade of Bridgemaster's house on Duchess Walk to facilitate the Fire Suppression project work. This requires the adaption of the Duchess Walk glazed facade to accommodate 2no. grilles, a breaching inlet, and alarm.

As published by the council, reference 25/AP/2549

Application record

Reference
25/AP/2549
Type
Minor application
Status
Under consideration/assessment
Received
5 Sep 2025
Validated
5 Sep 2025
Ward
London Bridge & West Bermondsey
Parish
Bermondsey And Rotherhithe
Postcode
SE1 2RF

Timeline

Dates from the published record

  1. 5 Sep 2025

    Received by Southwark

  2. 10 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 31 October 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Southwark took a median of 52 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Purcell LLP Agent, registered in Thames Ditton

Dissolved · incorporated 2001 · Thames Ditton

239 applications on PlanIndex · across 45 councils · 99% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

29 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Southwark for determination, against a statutory target of eight weeks. Over the last year Southwark decided full applications in a median of 65 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Bridge Masters House Tower Bridge Tower Bridge Road London Southwark SE1 2UP

    22/AP/1396 Submitted 19 Apr 2022 50 yards away

    Installation of replacement timber main entrance door

    Granted Heritage and listed buildings 15 docs
  • Bridgemasters House Duchess Walk London Southwark SE1 2UP

    26/AP/1117 Submitted 20 Apr 2026 50 yards away

    95% historically approved · decision due ~22 Jun

    Certificate of lawfulness (listed building) for internal alterations to include removal of stud partitions installed post construction, and installation of stud partitions and doors

    Awaiting decision Lawful development 5 docs
  • Bridge Masters Residence Tower Bridge Road Butlers Wharf London Southwark

    22/AP/2613 Submitted 21 Jul 2022 50 yards away

    Construction of installing a different locking system that requires an external handle be installed to the door, to remove the existing timber main entrance door and install a new timber entrance door, to match the existing installation, with the exception of the removal of the brass push plate and installation of a new brass handle as shown. All other existing ironmongery will be reinstated to the new door, with anything not to be reused left on the existing door which is to be retained by CLC and put on display. proposal will seek to increase the security of the door through an added 5mm of thickness, stronger Oak timber and multi point locking mechanisms.

    Granted Heritage and listed buildings 11 docs
  • Unit 9.2B Horace Jones House One Tower Bridge Tower Bridge Road London Southwark

    20/AP/0565 Submitted 25 Feb 2020 50 yards away

    Display of six internally hung illuminated signs within the shop windows consisting of company logos, together with the display of a non-illuminated hanging sign

    Granted Advertising Windows or glazing 9 docs
  • 189 Tower Bridge Road London Southwark SE1 2UP

    21/AP/3292 Submitted 16 Sep 2021 50 yards away

    Internally illuminated ATM fascia sign.

    Granted Advertising 11 docs
  • 6 Duchess Walk London Southwark SE1 2SD

    22/AP/0299 Submitted 2 Feb 2022 50 yards away

    Projecting sign 6 Duchess Walk.

    Granted Advertising 13 docs

In Southwark

  • 26/AP/2734 Awaiting decision

    Flat D 116 Barry Road London Southwark SE22 0HP

    Construction of a rear dormer extension with juliet balcony and the addition of three roof lights to the front roof slope.

    Received 15 Sep, published by the council 11 Oct 2026 Full applications
  • 26/AP/0663 Granted

    Burgess Business Park Parkhouse Street London Southwark SE5 7TJ

    Construction of new employment floorspace to provide Class E(g)(iii) and Class B8 floorspace, together with associated external works including the installation of a security cabin and replacement boundary fencing.

    Received 5 Mar, published by the council 28 Jul 2026 Full applications
  • 26/AP/0565 Withdrawn

    Church Of St Thomas More 380 Lordship Lane London Southwark SE22 8ND

    Landscaping works to provide accessible access from the church carpark to the John Paul Community Hall and Parish Office.

    Received 25 Feb, published by the council 28 Jul 2026 Full applications
  • 26/AP/2659 Awaiting decision

    23B Adys Road London Southwark SE15 4DX

    Rear dormer with 2no. rooflights on front slope plus a roof terrace over part of rear addition roof

    8 Sep 2026 Full applications
  • 26/AP/2660 Awaiting decision

    Vintage Yard 59 - 63 Bermondsey Street London Southwark SE1 3XF

    Installation of replacement rooftop and replacement low level roof plant, elevation alterations to include the removal of existing entrance gate and refurbishment of existing front door.

    8 Sep 2026 Full applications