Planning application

25/AP/2480

Bankside House 24 Sumner Street London Southwark SE1 9JA

Awaiting decision Southwark Major application

Proposal

Demolition of the existing building and hardstanding and redevelopment of Bankside House to provide one mixed-use building of three distinct built elements connected by a pavilion level to provide purpose-built student accommodation with ancillary facilities (Sui Generis) and ground floor commercial floorspace, café and retail (Use Class E) and community facilities (Use Class F1/F2), (including part use as a hotel Class C1 [and/or for the provision of other short-term seasonal accommodation] outside of term times) alongside associated cycle parking, servicing, plant, landscaping improvements, and wider public realm enhancements.

As published by the council, reference 25/AP/2480

Timeline

Dates from the published record

  1. 22 Aug 2025

    Received by Southwark

  2. 7 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Southwark for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/AP/3392 Awaiting decision

    Bankside 2 And 3 90 - 100 Southwark Street London Southwark SE1 0SW

    Construction of a double-height ground floor entrance linking and co-joining Bankside 2 with Bankside 3, private realm landscaping works and, removal of taxi rank and footway route

    20 Nov 2025 83m away Full applications
  • 20/AP/2620 Granted

    185 Park Street London Southwark

    Partial discharge of details required by condition 22, relating to the office building balustrades and railings, as required by LBS Planning Permision 14/AP/3842 granted 12.02.2016 (Demolition of existing buildings and redevelopment to provide a mixed use development providing three new buildings comprising basement, lower ground and ground floor plus part 9, 14 and 18 storeys (maximum height 19 storeys) containing 163 residential units (Class C3), Office (Class B1), Retail (Class A1/A3/A4), Cultural facility (Class D1/A1/A3/A4); provision of hard and soft landscaping and the provision of parking, servicing and plant areas.)

    14 Sep 2020 99m away Conditions
  • 26/AP/2087 Awaiting decision

    Advertising Right Outside 75 To 79 Southwark Street London Southwark

    Display of 1no. internally illuminated digital advertisement display within proposed communications hub.

    15 Jul 2026 125m away Advertising
  • 26/AP/1241 Awaiting decision

    71 - 79 Southwark Street London Southwark SE1 0JA

    Display of new projecting (flag sign) that will be visible.

    29 Apr 2026 145m away Advertising
  • 26/AP/1689 Awaiting decision

    14 Sumner Street London Southwark SE1 9JZ

    Advertisement consent for 1 Non Illuminated Projecting Sign and 1 Internal Digital Display Screen

    12 Jun 2026 146m away Advertising
  • 26/EES/0027 Awaiting decision

    62 - 76 Park Street London Southwark SE1 9DZ

    Follw-up Pre-application third meeting request (meeting and written advice) for the sustainable retrofit and extension of the Property to provide a new, best-inclass commercial office building (proposed 23,016.00 sqm GIA). In relation to application ref. 25/EQ/0095.

    3 Jul 2026 155m away

In Southwark

  • 25/AP/2512 Granted

    205 Rye Lane London Southwark SE15 4TP

    Demolition of the rear part of the single storey shop structure at 205 Rye Lane. Construction of a two storey residential maisonette infill at 44 Bournemouth Close, with associated external works.

    1 Sep 2025 Full applications
  • 26/AP/2251 Awaiting decision

    Flat 1 162B Underhill Road London Southwark SE22 0QH

    Construction of garden outbuilding, to be used as a home office, and all associated works

    29 Jul 2026 Full applications
  • 26/AP/2259 Awaiting decision

    64 Abercorn Way London Southwark SE1 5HL

    Prior approvaL for Erection of a single-storey rear extension projecting 5.4 metres from the original rear elevation of the property.

    29 Jul 2026 Full applications
  • 26/AP/1773 Granted

    5 Copleston Road London Southwark SE15 4AN

    Replacement of all existing single-glazed timber windows with white double-glazed uPVC units (sash to front; casement to rear and sides), and replacement of all existing timber doors with new composite front doors and a uPVC rear door.

    18 Jun 2026 Full applications
  • 26/AP/1234 Granted

    Unit 2 And Unit 7 313-349 Ilderton Road London Southwark SE19 1NW

    Temporary change of use of Units 2 and 7 from light industrial (Class E(g)(iii)) to a widened set of commercial (Class E(c), E(d), E(e) and E(g)) uses for a period of 3 years.

    29 Apr 2026 Full applications