Skip to content
PlanIndex Get alerts
Menu

Planning application

21/AP/4656

Chambers Wharf Chambers Street London Southwark

Granted Southwark Approval of Details

Proposal

Partial discharge of Worksite Construction Logistic Plan (Secondary Lining Phase) pursuant to Requirement PW6 (CoCP Part A Section 5.1.9) of the Schedule 3 of The Thames Tideway Utilities Limited (Thames Tideway Tunnel) Order 2014 (as amended) (hereafter referred to The Order) for the Chambers Wharf Foreshore Thames Tideway Tunnel worksite.

As published by the council, reference 21/AP/4656

Timeline

Dates from the published record

  1. 20 Dec 2021

    Received by Southwark

  2. 7 Jun 2022

    Decision issued: AOD - Granted

  3. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 21/AP/4658 Granted

    Chambers Wharf Chambers Street London Southwark

    Partial discharge of Traffic Management Plan (Secondary Lining Phase) pursuant to Requirement CHAWF8 of the Schedule 3 of The Thames Tideway Utilities Limited (Thames Tideway Tunnel) Order 2014 (as amended) (hereafter referred to The Order) for the Chambers Wharf Foreshore Thames Tideway Tunnel worksite.

    20 Dec 2021 0m away Conditions
  • 22/AP/3569 Granted

    Thames Tideway Tunnel At Chambers Wharf Chambers Street London Southwark

    Partially Discharge (external appearance of the hoarding) pursuant to Requirement CHAWF1 (CoCP Part B, Section 4), Schedule 3 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (as amended) for the works at Chambers Wharf Thames Tideway Tunnel worksite only

    14 Oct 2022 33m away Conditions
  • 22/AP/3684 Granted

    Thames Tideway Tunnel At Chambers Wharf Chambers Street London Southwark SE16

    Partial discharge of (removal of Ivy Green Wall and its associated supporting metal frame from the existing hoarding in Loftie Street ) pursuant to the Requirement CHAWF1 (CoCP Part B) of the Schedule 3 of The Thames Tideway Utilities Limited (Thames Tideway Tunnel) Order 2014 (as amended) (hereafter referred to The Order).

    24 Oct 2022 33m away Conditions
  • 20/AP/2554 Granted

    Chambers Wharf Chambers Street London Southwark

    Partial discharge of 'Chambers Wharf Worksite Specific Traffic Management Plan (Tunnelling)' Schedule 3 Requirement CHAWF8 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.

    11 Sep 2020 44m away Conditions
  • 20/AP/2553 Granted

    Chambers Wharf Chambers Street London Southwark

    Partial discharge of Schedule 3 Requirement PW6 'Worksite Specific Construction Logistics Plan' (CoCP Part A, Section 5.1.9) of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014

    11 Sep 2020 44m away Conditions
  • 20/AP/2681 Withdrawn

    4C River View Heights 27 Bermondsey Wall West London Southwark SE16 4TN

    Replacement of balcony doors and removal of the upstand/step below door frame.

    17 Sep 2020 154m away Full applications

In Southwark

  • 26/AP/0974 Granted

    110 The Queens Walk London Southwark SE1 2DB

    Partial discharge - Details of condition 28 (Bird boxes) pursuant to planning permission 24/AP/0918 (Alteration (including demolition) and extension of the existing office building for use as Offices (Class E(g)(i); Flexible Commercial (Class E) to include additional floorspace through extensions; altered and additional entrances; creation of office amenity terraces and plant enclosures; facade alterations including urban greening and associated works. Associated works including deconstruction / removal of an existing garage / kiosk structure and provision of new hard and soft landscaping within the public realm including improvements to the Scoop, and other works incidental to the development. (The site is within the setting of the Grade 1 listed Tower Bridge, the Tower of London World Heritage site, and the Tooley Street and Tower Bridge Conservation Areas))

    30 Mar 2026 Conditions
  • 26/AP/2268 Awaiting decision

    40 Village Way London Southwark SE21 7AP

    Non-Material Amendment provide additional information and minor revisions to the landscaping scheme for section 73 planning application 25/AP/0849 dated 02/06/2025 (for: Minor-material amendment to application ref 24/AP/1031 dated 12/03/2025, itself for: Construction of a single dwelling adjacent to 40 Village Way and minor works to the existing house to remove single-storey side extension and detached garage; proposed works include landscaping, cycle and refuse stores, and other associated works).

    30 Jul 2026 Conditions
  • 26/AP/1755 Granted

    Surrey Quays Railway Station Lower Road London Southwark SE16 2UE

    Details of Condition 7 - 'External Lighting' required by planning permission ref no. 20/AP/3744: 'Outline planning permission (with all matters reserved) for the erection of a new canopy related to a future northern entrance to Surrey Quays Station fronting on Deal Porters Way and the change of use of land adjacent to 181 Lower Road to operational railway land with the erection of a new single storey building containing back of house facilities to enable the development of step-free access and stairs to platform level'

    17 Jun 2026 Conditions
  • 26/AP/0917 Granted

    110 The Queens Walk London Southwark SE1 2DB

    Partial discharge - Details of condition 23 (Bat tubes, bricks or boxes) pursuant to planning permission 24/AP/0918 (Alteration (including demolition) and extension of the existing office building for use as Offices (Class E(g)(i); Flexible Commercial (Class E) to include additional floorspace through extensions; altered and additional entrances; creation of office amenity terraces and plant enclosures; facade alterations including urban greening and associated works. Associated works including deconstruction / removal of an existing garage / kiosk structure and provision of new hard and soft landscaping within the public realm including improvements to the Scoop, and other works incidental to the development. (The site is within the setting of the Grade 1 listed Tower Bridge, the Tower of London World Heritage site, and the Tooley Street and Tower Bridge Conservation Areas))

    30 Mar 2026 Conditions
  • 26/AP/2262 Awaiting decision

    Southwark Underground Station And Adjoining Land The Cut London Southwark SE1 8JZ

    Details of condition 24 (Piling Methodology) pursuant to planning permission 24/AP/2770 'Demolition and redevelopment to provide a purpose built student accommodation building of 15 storeys (plus basement and rooftop plant) with retail and/or cafe uses within Use Class E on the ground floor, and a residential building of 9 storeys (plus rooftop plant) to accommodate the required affordable housing within Use Class C3, with community uses within Use Class F1 on the ground floor; together with cycle parking, refuse/recycling storage, servicing, improvements to Joan Street, landscaping and other works.'

    29 Jul 2026 Conditions