Planning application
East End of The Royal Pier Southampton SO14 3AQ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Application for approval of details reserved by conditions 7 (Conservation Management Plan) and 10 (Programme of Archaeological Work) of permission 25/00128/LBC for the relocation of Mulberry Harbour "Whale" Bridge from Town Quay to Marchwood Port.
As published by the council, reference 26/01124/DIS
Application record
- Reference
- 26/01124/DIS
- Status
- Awaiting decision
- Validated
- 22 Sep 2026
- Postcode
- SO14 3AQ
Site history
Applications at this address on the Southampton register
This site has had 3 applications since 2025: 1 approved, 0 refused.
-
26/00019/DIS Granted
East End of The Royal Pier Southampton SO14 3AQ
Application for approval of details reserved by condition 8(Interpretation Panels) of permission 25/00128/LBC to relocate whale
-
25/01444/DIS Split decision
East End of The Royal Pier Southampton SO14 3AQ
Application for approval of details reserved by conditions 7 (Conservation management plan) and 9 (Written scheme of investigation) of listed building consent ref 25/00128/LBC for the relocation of Mulberry Harbour "Whale" Bridge from Town Quay to Marchwood Port.
Timeline
Dates from the published record
-
22 Sep 2026
Validated
Checked as complete and ready for consideration.
-
1 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 17 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Southampton took a median of 55 days over the applications it decided in the last year.
What happens while it is decided
This application is with Southampton for determination, against a statutory target of eight weeks. Over the last year Southampton's median decision took 55 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Southampton's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
1 Queensway Southampton SO14 3AQ
95% historically approved · decision due ~26 Dec
Application for a lawful development certificate for existing conversion of part of the building from office space to two flats.
Awaiting decision Lawful development New dwelling 3 docsSeveral homes -
East End of The Royal Pier Southampton SO14 3AQ
Application for approval of details reserved by condition 8(Interpretation Panels) of permission 25/00128/LBC to relocate whale
Granted Conditions 7 docs -
East End of The Royal Pier Southampton SO14 3AQ
Application for approval of details reserved by conditions 7 (Conservation management plan) and 9 (Written scheme of investigation) of listed building consent ref 25/00128/LBC for the relocation of Mulberry Harbour "Whale" Bridge from Town Quay to Marchwood Port.
Split decision Conditions 7 docs -
2 - 8 Queensway and adjoining Area of Public Highway Southampton SO14 3AZ
Application for approval of details reserved by conditions 5 (extract ventilation - control of noise, fumes and odour) and 7 (archaeological work programme) of planning permission ref 12/01262/FUL for redevelopment of the site
Granted Conditions 1 doc -
Oceana Boulevard Briton Street Southampton
Non-material amendment sought to planning permission ref 05/01276/FUL for alterations to the existing buildings to address Regulatory and Safety compliance issues including replacement AOV (Automatic Opening Vents) with two Blocks requiring widening or lengthening of openings to accommodate compliant units to be installed. Specifically to Gate 5 and 9. Installation of a Lightning Protection System. Installation of new Roof Access Ladders and Installation of new Roof Walkway between Gates 9 and 10
Granted Amendments Roofing 12 docs -
Friary House Briton Street Southampton
Prior Approval sought for a change of use from Office (Use Class B1 (a)) to 46 flats (4 x studio, 30 x 1-bed, 10 x 2-bed and 2 x3-bed) (Use Class C3)
Granted Prior approval New dwelling 19 docsMajor scheme