Skip to content
PlanIndex Get alerts
Menu

Planning application

68 Above Bar Street Southampton SO14 7DS

Granted Southampton 26/01016/FUL Full applications

Works: Windows or glazing

Relates to 26/01017/ADV

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of existing redundant ATM and shrouding with replacement of glazing panels.(submitted in conjunction with 26/01017/ADV)

As published by the council, reference 26/01016/FUL

Application record

Reference
26/01016/FUL
Category
Full applications
Status
Approved
Decision
Granted As published: Approved
Received
28 Aug 2026
Validated
28 Aug 2026
Ward
Bargate
Postcode
SO14 7DS

Site history

Applications at this address on the Southampton register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • 26/01017/ADV Granted

    68 Above Bar Street Southampton SO14 7DS

    Replacement of existing signage, installation of 2 x internally illuminated signs and 4 x non-illuminated signs. (submitted in conjunction with 26/01016/FUL)

    Submitted 28 Aug 2026 Advertising

Timeline

Dates from the published record

  1. 28 Aug 2026

    Received by Southampton

  2. 8 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 26/01017/ADV Granted

    68 Above Bar Street Southampton SO14 7DS

    Replacement of existing signage, installation of 2 x internally illuminated signs and 4 x non-illuminated signs. (submitted in conjunction with 26/01016/FUL)

    Submitted 28 Aug 2026 Advertising

1 later application on the register refers to this one:

  • 26/01017/ADV Granted

    68 Above Bar Street Southampton SO14 7DS

    Replacement of existing signage, installation of 2 x internally illuminated signs and 4 x non-illuminated signs. (submitted in conjunction with 26/01016/FUL)

    Submitted 28 Aug 2026 Advertising

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Southampton granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 68 Above Bar Street Southampton SO14 7DS

    26/01017/ADV Submitted 28 Aug 2026 50 yards away

    Replacement of existing signage, installation of 2 x internally illuminated signs and 4 x non-illuminated signs. (submitted in conjunction with 26/01016/FUL)

    Granted Advertising 2 docs
  • 70 Above Bar Street Southampton SO14 7DS

    24/00829/FUL Submitted 31 Jul 2024 50 yards away

    External alterations including new shop front, condenser unit on roof and installation of an ATM (Submitted in conjunction with ref 24/00830/ADV).

    Granted Full applications Windows or glazing 12 docs
  • 51 Above Bar Street Southampton SO14 7DZ

    21/01538/FUL Submitted 14 Oct 2021 50 yards away

    Installation of new shop front, roller shutter and two air conditioning units (Submitted in conjunction with 21/01539/ADV)

    Granted Full applications Windows or glazing 6 docs
  • 51 Above Bar Street Southampton SO14 7DZ

    21/01539/ADV Submitted 14 Oct 2021 50 yards away

    Installation of 1x internally illuminated fascia sign, 1x internally illuminated projecting sign and 2x digital screens (Submitted in conjunction with 21/01538/FUL)

    Granted Advertising 5 docs
  • Pedestrian Precinct Above Bar Street Southampton

    21/01201/ADV Submitted 5 Aug 2021 50 yards away

    Freestanding double-sided internally illuminated LED digital advertisement display (2.75 m wide by 5.32m high) - partly retrospective

    Granted Advertising 14 docs
  • 53 - 55 Above Bar Street Southampton SO14 7DZ

    26/01063/FUL Submitted 10 Sep 2026 50 yards away

    91% historically approved · decision due ~5 Nov

    Replacement entrance door

    Awaiting decision Full applications

In Southampton

  • 26/01131/FUL Awaiting decision

    10 - 11 Bedford Place Southampton SO15 2DB

    Implementation of planning permission 15/01470/FUL not in accordance with conditions 4 and 5 for mixed use of the premises (restaurant/cafe, drinking establishment, hot food takeaway, non-residential institutions, assembly and leisure). Variation to condition 4 (hours of operation) and 5 (hours of use for smoking terrace) sought to allow consented opening hours Mondays to Sundays 08:00-00:00 to temporarily extend for 1 year to Sundays to Thursdays 08:00-00:00 and Fridays, Saturdays and New Years Eve 08:00 to 02:00

    Full applications
  • 26/00074/FUL Awaiting decision

    462 Bursledon Road Southampton SO19 8QQ

    Erection of a storage building (Retrospective) (Resubmission of 25/01172/FUL)

    Full applications
  • 26/01177/FUL Awaiting decision

    Vedic Hindu Temple 79 - 195 Radcliffe Road Southampton SO14 0PS

    Erection of a single-storey front extension, roof alterations including replacement roof from pitched to flat and erection of spire.

    Full applications
  • 26/01067/FUL Awaiting decision

    65 Gainsford Road Southampton SO19 7AW

    Erection of single storey side extension (retrospective).

    Full applications
  • 26/01078/FUL Awaiting decision

    41 Hazeleigh Avenue Southampton SO19 9DG

    Roof alterations including raising the roof, hip to gable, side dormer and front and rear windows to facilitate loft conversion

    Full applications