Skip to content
PlanIndex Get alerts
Menu

Planning application

70 Above Bar Street Southampton SO14 7DS

Granted Southampton 24/00829/FUL Full Application

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

External alterations including new shop front, condenser unit on roof and installation of an ATM (Submitted in conjunction with ref 24/00830/ADV).

As published by the council, reference 24/00829/FUL

Application record

Reference
24/00829/FUL
Type
Full Application
Status
Approved
Decision
Granted As published: Approve with Conditions
Received
31 Jul 2024
Validated
31 Jul 2024
Decided
23 Sep 2024
Ward
Bargate
Decision by
Delegated Decision
Postcode
SO14 7DS

Site history

Applications at this address on the Southampton register

This site has had 3 applications since 2021: 3 approved, 0 refused.

  • 21/01791/ADV Granted

    70 Above Bar Street Southampton SO14 7DS

    Installation of 3x internally illuminated fascia signs and 2x internally illuminated projecting signs (Submitted in conjunction with 21/01790/FUL)

    Decided 21 Jan 2022 Advertising
  • 21/01790/FUL Granted

    70 Above Bar Street Southampton SO14 7DS

    Installation of roof top extraction equipment and alterations to shopfront (Submitted in conjunction with 21/01791/ADV)

    Decided 21 Jan 2022 Full applications

Timeline

Dates from the published record

  1. 31 Jul 2024

    Received by Southampton

  2. 23 Sep 2024

    Decision issued: Approve with Conditions

  3. 28 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Southampton granted permission on 23 September 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 68 Above Bar Street Southampton SO14 7DS

    26/01016/FUL Submitted 28 Aug 2026 50 yards away

    Removal of existing redundant ATM and shrouding with replacement of glazing panels.(submitted in conjunction with 26/01017/ADV)

    Granted Full applications Windows or glazing 3 docs
  • 68 Above Bar Street Southampton SO14 7DS

    26/01017/ADV Submitted 28 Aug 2026 50 yards away

    Replacement of existing signage, installation of 2 x internally illuminated signs and 4 x non-illuminated signs. (submitted in conjunction with 26/01016/FUL)

    Granted Advertising 2 docs
  • 70 Above Bar Street Southampton SO14 7DS

    21/01791/ADV Submitted 3 Dec 2021 50 yards away

    Installation of 3x internally illuminated fascia signs and 2x internally illuminated projecting signs (Submitted in conjunction with 21/01790/FUL)

    Granted Advertising 7 docs
  • 70 Above Bar Street Southampton SO14 7DS

    21/01790/FUL Submitted 3 Dec 2021 50 yards away

    Installation of roof top extraction equipment and alterations to shopfront (Submitted in conjunction with 21/01791/ADV)

    Granted Full applications Windows or glazing 8 docs
  • 53 - 55 Above Bar Street Southampton SO14 7DZ

    26/01063/FUL Submitted 10 Sep 2026 50 yards away

    91% historically approved · decision due ~5 Nov

    Replacement entrance door

    Awaiting decision Full applications
  • 61 Above Bar Street Southampton SO14 7DZ

    26/00922/ADV Submitted 10 Aug 2026 50 yards away

    Installation of internally illuminated fascia sign and digital screen

    Granted Advertising

In Southampton

  • 26/01131/FUL Awaiting decision

    10 - 11 Bedford Place Southampton SO15 2DB

    Implementation of planning permission 15/01470/FUL not in accordance with conditions 4 and 5 for mixed use of the premises (restaurant/cafe, drinking establishment, hot food takeaway, non-residential institutions, assembly and leisure). Variation to condition 4 (hours of operation) and 5 (hours of use for smoking terrace) sought to allow consented opening hours Mondays to Sundays 08:00-00:00 to temporarily extend for 1 year to Sundays to Thursdays 08:00-00:00 and Fridays, Saturdays and New Years Eve 08:00 to 02:00

    Full applications
  • 26/00074/FUL Awaiting decision

    462 Bursledon Road Southampton SO19 8QQ

    Erection of a storage building (Retrospective) (Resubmission of 25/01172/FUL)

    Full applications
  • 26/01177/FUL Awaiting decision

    Vedic Hindu Temple 79 - 195 Radcliffe Road Southampton SO14 0PS

    Erection of a single-storey front extension, roof alterations including replacement roof from pitched to flat and erection of spire.

    Full applications
  • 26/01067/FUL Awaiting decision

    65 Gainsford Road Southampton SO19 7AW

    Erection of single storey side extension (retrospective).

    Full applications
  • 26/01078/FUL Awaiting decision

    41 Hazeleigh Avenue Southampton SO19 9DG

    Roof alterations including raising the roof, hip to gable, side dormer and front and rear windows to facilitate loft conversion

    Full applications