Skip to content
PlanIndex Get alerts
Menu

Planning application

132 King Georges Avenue Southampton SO15 4LA

Awaiting decision Southampton 26/00865/NMA Non-material amendment application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Non-material amendment sought to planning permission ref 22/01244/FUL for reduction in size of two storey side extension to single storey (Retrospective)

As published by the council, reference 26/00865/NMA

Application record

Reference
26/00865/NMA
Type
Non-material amendment application
Status
Awaiting decision
Received
23 Jul 2026
Validated
23 Jul 2026
Ward
Millbrook
Postcode
SO15 4LA

Site history

Applications at this address on the Southampton register

This site has had 2 applications since 2022: 1 approved, 0 refused.

  • 22/01244/FUL Granted

    132 King Georges Avenue Southampton SO15 4LA

    Erection of a part 2-storey, part single storey side/front extension

    Decided 17 Nov 2022 Full applications

Timeline

Dates from the published record

  1. 23 Jul 2026

    Received by Southampton

  2. 8 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 17 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Southampton took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Southampton for determination, against a statutory target of eight weeks. Over the last year Southampton decided amendment applications in a median of 30 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Southampton

  • 26/01196/NMA Awaiting decision

    Southampton Sports Centre Thornhill Road Southampton SO16 7AY

    Non-material amendment sought to planning permission ref 24/00601/MMA seeking amendments to condition 26 (Electric Vehicle Spaces) relating to a reduction of electric vehicle charging facilities.

    Amendments
  • 26/01133/NMA Awaiting decision

    87 Ludlow Road Southampton SO19 2ET

    Non-material amendment sought to planning permission ref 22/01526/FUL for roof alterations (hip to gable), changes to materials, fenestration and footprint (retrospective)

    Amendments
  • 26/00966/NMA Granted

    St Marys Stadium Britannia Road Southampton SO14 5FP

    Non-material amendment sought to planning permission ref 24/00479/FUL for the erection of a fan zone for the following: Erection of fan zone marque, three LED display screens, 14 food and beverage concession and retail stalls (new, relocated and non-permanent), three W/C blocks (two new, one relocated), two ticket offices, altered stadium entry access gates, altered car and cycle parking bays and related ancillary works.

    Received 19 Aug, published by the council 26 Aug 2026 Amendments
  • 26/01118/NMA Awaiting decision

    59 Burgess Road Southampton SO16 7AL

    Non-material amendment sought to planning permission ref 25/00001/FUL (amended planning permission ref 22/00531/FUL) for changes to windows

    Amendments
  • 26/01117/NMA Granted

    Scout Hut 51 - 57 Brookvale Road Southampton SO17 1QS

    Non-material amendment sought to planning permission ref 25/00627/FUL for replacement scout building to change windows/doors, photovoltaic panels, building footprint and site layout.

    Amendments