Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Around Preston Hill Farm South Of Levedale Road

Awaiting decision South Staffordshire 26/00537/VAR Amendments

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Variation of conditions 3,5,6,7,8,12,16,18,19,20 of application 23/00009/FUL Amendment to site layout All pre-commencement conditions that have been discharged to be amended to compliance conditions

As published by the council, reference 26/00537/VAR

Application record

Reference
26/00537/VAR
Category
Amendments
Status
Awaiting decision
Received
22 Jun 2026
Validated
22 Jun 2026
Ward
Penkridge North & Acton Trussell
Parish
PENKRIDGE

Timeline

Dates from the published record

  1. 22 Jun 2026

    Received by South Staffordshire

  2. 23 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 17 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    South Staffordshire took a median of 70 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 23/00009/FUL (Application approved with conditions)

Who's behind it

Company information only, from the register and Companies House

Aura Power Developments Ltd Applicant, a developer registered in Bristol

Active · incorporated 2016 · Bristol

4 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

29 documents on file for this application

  • AURA POWER LETTER Documents · 17 Jul 2026
  • SITE CLEARANCE VISIBILITY SPLAYS Plans and Drawings · 06 Jul 2026
  • BIODIVERSITY MONITORING AND MANAGEMENT SCHEDULE Biodiversity Survey · 06 Jul 2026
  • AMENDED Construction Management Plan (CEMP) · 06 Jul 2026
  • APPLICATIONFORMREDACTED Application Form (Redacted) · 22 Jun 2026
  • FIGURE 3 TYPICAL SOLAR PANEL Plans and Drawings · 22 Jun 2026
  • FIGURE 4 TYPICAL ARRANGEMENT OF ROWS Plans and Drawings · 22 Jun 2026
  • FIGURE 5 -TRANSFORMER STATION Plans and Drawings · 22 Jun 2026
  • FIGURE 9 - 33KV SWITCH ROOM LAYOUT Plans and Drawings · 22 Jun 2026
  • FIGURE 10 CUSTOMER SIDE FENCE POST LAYOUT AND DETAILS Plans and Drawings · 22 Jun 2026
  • FIGURE 12 SPARE PARTS CONTAINER Plans and Drawings · 22 Jun 2026
  • FIGURE 15 16 AND 17 - FENCE AND GATE Plans and Drawings · 22 Jun 2026
  • S111 VEHICLE SWEPT PATH ANALYSIS Plans and Drawings · 22 Jun 2026
  • S111 SWEPT PATH ANALYSIS-ARTIC Plans and Drawings · 22 Jun 2026
  • PRE-CONSTRUCTION ROAD CONDITION SURVEY Additional Information · 22 Jun 2026
  • DESIGN FOR ARCHAEOLOGICAL TRIAL TRENCH EVALUATION Additional Information · 22 Jun 2026
  • TRIAL TRENCH EVALUATION REPORT Additional Information · 22 Jun 2026
  • PH APPENDIX 5 - ECOLOGICAL ASSESSMENT 1 Ecological Appraisal · 22 Jun 2026
  • ADDENDUM BASELINE HABITAT CONDITIONS Additional Information · 22 Jun 2026
  • FLOOD RISK ASSESSMENT ADDENDUM Additional Information · 22 Jun 2026
  • TREE PROTECTION METHOD STATEMENT Additional Information · 22 Jun 2026
  • NEO ENVIRONMENTAL LTD VERIFICATION LETTER Additional Information · 22 Jun 2026
  • VIENTO ENVIRONMENTAL LETTER Additional Information · 22 Jun 2026
  • SUPERSEDED Construction Management Plan (CEMP) · 22 Jun 2026
  • AURA POWER DEVELOPMENTS LIMITED Covering Letter · 22 Jun 2026
  • FIGURE 7 AND 8 - 132KV SUBSTATION SECTION SHEET 2/2 Sections - Proposed · 22 Jun 2026
  • FIGURE 7 AND 8 - 132KV SUBSTATION LAYOUT SHEET 1/2 Layout Plan - Proposed · 22 Jun 2026
  • FIGURE 9 - 132KV CONTROL ROOM LAYOUT SHEET 1 Floor Plan - Proposed · 22 Jun 2026
  • FIGURE 9 - 132KV CONTROL ROOM DOOR DETAILS SHEET 2 Plans and Drawings · 22 Jun 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with South Staffordshire for determination, against a statutory target of eight weeks. Over the last year South Staffordshire decided amendment applications in a median of 55 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

In South Staffordshire

  • 26/00755/VAR Awaiting decision

    Saredon Farm House Saredon Road Cheslyn Hay WALSALL WS6 7JD

    Variation of conditions 2, 3, 4, 5, 7, 8 & 12 for application 24/01071/VAR

    1 Sep 2026 Amendments
  • 26/00713/VAR Awaiting decision

    The Lane House Top Road Acton Trussell STAFFORD ST17 0RQ

    Variation of condition 2 (approved plans) of planning approval 17/00703/FUL to allow revised design and footprint of Plot 4

    18 Aug 2026 Amendments
  • 26/00703/VAR Awaiting decision

    Hockerhill Farm Kiddemore Green Road Brewood STAFFORD ST19 9BQ

    Variation of Condition Nos. 2 (approved plans) and 17 (housing mix) of planning approval 25/00296/OUTM to allow greater flexibility over site layout and design and housing mix.

    13 Aug 2026 Amendments
  • 26/00672/VAR Awaiting decision

    Land At Saredon Road Cheslyn Hay Walsall WS6 7JD

    Variation of Condition 1 of 24/00458/VAR to extend the use of the land as a sawmill for an additional 2 years.

    5 Aug 2026 Amendments
  • 26/00485/VAR Granted

    34 Showell Lane Lower Penn WOLVERHAMPTON WV4 4TT

    Variation of Condition 2 (Approved Plans) of 23/00935/FULHH to increase the size of the ground floor rear and front extensions and change rear bedroom windows to Juliet balconies

    5 Jun 2026 Amendments