Skip to content
PlanIndex Get alerts
Menu

Planning application

Cuerden Strategic Site East Of Stanfield Lane Lostock Lane Lostock Hall Lancashire PR5 5YG

Decided South Ribble LCC/07/2022/00044 County Matter

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Application for Outline Planning Permission (with all matters reserved save for access from the public highway and strategic green infrastructure/landscaping) for a mixed-use development including the provision of Employment use (Use Classes B2/B8/E(g)); retail (use Class E(a)); food, drink and drive-through restaurant use (Use Class E(b)/Sui Generis Drive-Through); hotel use (Use Class C1); health, fitness and leisure use (Use Classes E(d)/F(e)/F2(b)); creche/nursery (Class E(f)); car showrooms (Use Class Sui Generis Car Showroom); Residential use (C3) the provision of associated car parking, access, public open space, landscaping and drainage. As amended under LCC/2022/0044NM1 As amended under application ref. LCC/2022/0044NM1

As published by the council, reference LCC/07/2022/00044

Application record

Reference
LCC/07/2022/00044
Type
County Matter
Status
Unknown
Decision
County Matter
Received
7 Sep 2022
Validated
7 Sep 2022
Decided
9 Mar 2023
Decision by
Committee Decision
Postcode
PR5 5YG

Timeline

Dates from the published record

  1. 7 Sep 2022

    Received by South Ribble

  2. 9 Mar 2023

    Decision issued: County Matter

  3. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Barton Willmore LLP Agent

339 applications on PlanIndex · across 77 councils · 88% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Lancashire County Council and Maple Grove Developments Limit Applicant, a developer

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

251 documents on file for this application

  • LCC Consultee Response · 04 Sep 2024
  • COVERING LETTER Planning File · 13 Dec 2023
  • STRATEGIC SITE. NOTICE. Planning File · 13 Dec 2023
  • REPORT. Planning File · 13 Dec 2023
  • RE CONSULTATION REQUEST Planning File · 01 Aug 2023
  • LANCS FIRE RESCUE Consultee Response · 15 Mar 2023
  • ENVIRO AGENCY COMMENTS Planning File · 28 Feb 2023
  • ENVIRO AGENCY COMMENTS Planning File · 28 Feb 2023
  • HISTORIC ENGLAND COMMENTS Planning File · 28 Feb 2023
  • NATURAL ENGLAND COMMENTS Planning File · 28 Feb 2023
  • SCHOOL PLANNING TEAM COMMENTS Planning File · 28 Feb 2023
  • UNITED UTILITES REVISED COMMENTS Planning File · 28 Feb 2023
  • LLFA RESPONSE Planning File · 28 Feb 2023
  • BLACKBURN WITH DARWEN COMMENTS Planning File · 28 Feb 2023
  • ECOLOGY COMMENTS Planning File · 28 Feb 2023
  • ECUS ARB 23/02/2023 REP BROOKHOUSE LTD FURTHER COMMENTS Planning File · 28 Feb 2023
  • OBSERVATIONS ON AMENDMENTS TO LCC.2022.0044_REDACTED Planning File · 28 Feb 2023
  • CONTACT WITH LCC_REDACTED Planning File · 28 Feb 2023
  • LTR - LANCASHIRE COUNTY COUNCIL - 23.02.2023 4147-5360-3653 V.2 Planning File · 28 Feb 2023
  • 20019 CUERDEN STRATEGIC SITE TECHNICAL NOTE V2.0_REDACTED Planning File · 28 Feb 2023
  • 20019 CUERDEN STRATEGIC SITE TECHNICAL NOTE V1.0_REDACTED Planning File · 28 Feb 2023
  • 230221 J325095 TN06 V.1.0 Planning File · 28 Feb 2023
  • 18/01/2023 REGULATION 25 SITE NOTICE Planning File · 28 Feb 2023
  • 03/03/2023 REGULATION 25 SITE NOTICE Planning File · 28 Feb 2023
  • 10/02/2023 EIA LANDSCAPE LETTER OF COMPLIANCE Planning File · 28 Feb 2023
  • 10/02/2023 AMENDED VOL 1 CHAPTER 7 - LANDSCAPE AND VIEWS REV A Planning File · 28 Feb 2023
  • 10/02/2023 AMENDED CHAPTER 7 - APPENDIX PART 1 REV A Planning File · 28 Feb 2023
  • 24/02/2023 BIODIVERSITY NET GAIN Planning File · 28 Feb 2023
  • 24/02/2023 RESPONSE TO LCC COVERING LETTER Planning File · 28 Feb 2023
  • 230210 21616 (LANCASHIRE CENTRAL) RESPONSE TO CONSULTATION COMMENTS_REDACTED Planning File · 28 Feb 2023
  • 10/02/2023 AMENDED DESIGN CODE REV P12 Planning File · 28 Feb 2023
  • 230224 21616 (LANCASHIRE CENTRAL) SUPPLEMENTARY RETAIL NOTE Planning File · 28 Feb 2023
  • EXTERNAL CONSULTEES Planning File · 28 Feb 2023
  • 231002 84465-WSP-XX-DR-010 REV A Planning File · 28 Feb 2023
  • 230224 21616 (LANCASHIRE CENTRAL) RESPONSE TO SRBC AND PCC_REDACTED(1). Planning File · 28 Feb 2023
  • 230224 21616 (LANCASHIRE CENTRAL) RESPONSE TO BGL_REDACTED Planning File · 28 Feb 2023
  • 230224 21616 (LANCASHIRE CENTRAL) BIODIVERSITY METRIC 3.1 LANCASHIRE CENTRAL FUL Planning File · 28 Feb 2023
  • 230224 21616 (LANCASHIRE CENTRAL) BIODIVERSITY METRIC 3.1 CALCULATIONS FOR DELAY Planning File · 28 Feb 2023
  • 230210 SF3236 REV D LANCASHIRE CENTRAL ARB SURVEY REPORT Planning File · 28 Feb 2023
  • 230210 SF3236 AIA01 - REV B - 6 OF 6 ZONE E RESIDENTIAL Planning File · 28 Feb 2023
  • 230210 SF3236 AIA01 - REV B - 5 OF 6 ZONE D EAST Planning File · 28 Feb 2023
  • 230210 SF3236 AIA01 - REV B - 4 OF 6 STAINFILED LN.JUNCTION Planning File · 28 Feb 2023
  • 230210 SF3236 AIA01 - REV B - 3 OF 6 WIGAN RD JUNCTION Planning File · 28 Feb 2023
  • 230210 SF3236 AIA01 - REV B - 2 OF 6 PHASE A GREEN CORRIDOR Planning File · 28 Feb 2023
  • 230210 SF3236 AIA01 - REV B - 1 OF 6 PHASE A GREEN INFRASTRUCTURE Planning File · 28 Feb 2023
  • WIE11556-109-R-1.3.2 - LANC CENTRAL RES SUITABILITY REPORT Planning File · 13 Jan 2023
  • WIE11556-109-R-1.3.2 - LANC CENTRAL RES SUITABILITY REPORT Planning File · 13 Jan 2023
  • SF3236 REV C LANCASHIRE CENTRAL ARBORICULTURAL SURVEY REPORT Planning File · 13 Jan 2023
  • SF3236 AIA01 - REV A-5 OF 5 ZONE D EAST Planning File · 13 Jan 2023
  • SF3236 AIA01 - REV A-4 OF 5 STAINFILED LN.JUNCTION Planning File · 13 Jan 2023
  • SF3236 AIA01 - REV A-3 OF 5 WIGAN RD JUNCTION Planning File · 13 Jan 2023
  • SF3236 AIA01 - REV A-2 OF 5 PHASE A GREEN CORRIDOR Planning File · 13 Jan 2023
  • SF3236 AIA01 - REV A-1 OF 5 PHASE A GREEN INFRASTRUCTURE Planning File · 13 Jan 2023
  • SF 3236 LL06 REV A - LANDS PROP - GREEN INFRASTRUCTURE ZONE C Planning File · 13 Jan 2023
  • SF 3236 LL05 REV A - LANDS PROP - GREEN INFRASTRUCTURE ZONE B Planning File · 13 Jan 2023
  • SF 3236 LL04 REV A - LANDS PROP - GREEN INFRASTRUCTURE ZONE A (2). Planning File · 13 Jan 2023
  • SF 3236 LL04 REV A - LANDS PROP - GREEN INFRASTRUCTURE ZONE A (1 Planning File · 13 Jan 2023
  • SF 3236 LL03 REV B - WIGAN ROAD ACCESS JUNCTION. Planning File · 13 Jan 2023
  • SF 3236 LL02 REV B - STANIFIELD LANE ACCESS JUNCTION TO PHASE D Planning File · 13 Jan 2023
  • SF 3236 LL01 REV B - LANDSCAPE PROPOSALS - GREEN INFRASTRUCTURE Planning File · 13 Jan 2023
  • FIGURE~3 Planning File · 13 Jan 2023
  • FIGURE~2. Planning File · 13 Jan 2023
  • FIGURE 2.1 CUMULATIVE SCHEMES PLAN Planning File · 13 Jan 2023
  • ES VOL 1 FIGURE 1.1 (RED LINE BOUNDARY Planning File · 13 Jan 2023
  • ES NON TECHNICAL SUMMARY D Planning File · 13 Jan 2023
  • ES NON TECHNICAL SUMMARY C Planning File · 13 Jan 2023
  • ES NON TECHNICAL SUMMARY B (RED LINE BOUNDARY Planning File · 13 Jan 2023
  • ECOLOGY ADDITIONAL INFORMATION NOV 2022_REDACTED Planning File · 13 Jan 2023
  • BIODIVERSITY NET GAIN LANCASHIRE CENTRAL R5 Planning File · 13 Jan 2023
  • BIODIVERSITY METRIC 3.1 LANCASHIRE CENTRAL FULL SITE 2017 R6 Planning File · 13 Jan 2023
  • BIODIVERSITY METRIC 3.1 LANCASHIRE CENTRAL FULL SITE 2017 R6 Planning File · 13 Jan 2023
  • B381371C Planning File · 13 Jan 2023
  • 84465-WSP-XX-DR-012 REV A WIGAN ROAD ACCESS JUNCTION Planning File · 13 Jan 2023
  • 84465-WSP-XX-DR-011 REV B NO TRACKING HIGHWAYS LAYOUT Planning File · 13 Jan 2023
  • 84465-WSP-XX-DR-011 REV B HIGHWAYS LAYOUT Planning File · 13 Jan 2023
  • 84465-WSP-XX-DR-010 REV A STANIFIELD LANE ACCESS JUNCTION TO PHASE D Planning File · 13 Jan 2023
  • 84465-WSP-XX-DR-007 REV B NO TRACKING HIGHWAYS LAYOUT SHEET 3 OF 3 Planning File · 13 Jan 2023
  • 84465-WSP-XX-DR-006 REV B HIGHWAYS LAYOUT SHEET 2 OF 3 Planning File · 13 Jan 2023
  • 84465-WSP-XX-DR-005 REV B NO TRACKING HIGHWAYS LAYOUT SHEET 1 OF 3 Planning File · 13 Jan 2023
  • 84465-WSP-XX-DR-005 REV B HIGHWAYS LAYOUT SHEET 1 OF 3 Planning File · 13 Jan 2023
  • 84465-WSP-XX-DR-004 REV A M65 TERMINUS ROUNDABOUT Planning File · 13 Jan 2023
  • 84465-WSP-XX-DR-003 REV A STANIFIELD LANE ACCESS TO RESIDENTIAL PHASE. Planning File · 13 Jan 2023
  • 84465-WSP-XX-DR-002 REV A STANIFIELD LANE ACCESS JUNCTION TO PHASE D Planning File · 13 Jan 2023
  • 84465-WSP-XX-DR-001 REV A WIGAN ROAD ACCESSS JUNCTION Planning File · 13 Jan 2023
  • 230110 21616 (LANCASHIRE CENTRAL) RESPONSE TO CONSULTATION COMMENTS_REDACTED Planning File · 13 Jan 2023
  • 221222~1 Planning File · 13 Jan 2023
  • 220110 REVISED APPLICATION FORM WITH CERTIFICATES C_REDACTED Planning File · 13 Jan 2023
  • 220110 21616 (LANCASHIRE CENTRAL) GUIDE TO DOCUMENTS FOR APPROVAL Planning File · 13 Jan 2023
  • 21017-FRA-XX-ZZ-DR-A-9113_P12_PARAMETERS PLAN 3 Planning File · 13 Jan 2023
  • 21017-FRA-XX-ZZ-DR-A-9112-P16_PARAMETERS PLAN 2 Planning File · 13 Jan 2023
  • 21017-FRA-XX-ZZ-DR-A-9111_P11_PARAMETERS PLAN 1 Planning File · 13 Jan 2023
  • 21017-FRA-XX-XX-DR-A-9125-P4-PUBLIC RIGHT OF WAYS - SHEET 2 OF 2 Planning File · 13 Jan 2023
  • 21017-FRA-XX-XX-DR-A-9124-P2-P R OF W - SHEET 1 OF 2 Planning File · 13 Jan 2023
  • 21017-DESIGN CODE_P7_2022.12.15 Planning File · 13 Jan 2023
  • DESIGN & ACCESS STATEMENT-P6-2022.11.28 Planning File · 13 Jan 2023
  • SITE NOTICE Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 12.1D - ECOLOGICAL APPRAISAL Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 12.1C - ECOLOGICAL APPRAISAL Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 12.1A - ECOLOGICAL APPRAISAL Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 11.1 - AIR QUALITY ASSESSMENT DETAILED METHODOLOGY Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 10.4 ROAD TRAFFIC NOISE ASSESSMENT Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 10.3 CONSTRUCTION ASSESSMENT METHODOLOGY Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 10.2 BASELINE CONDITIONS Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 10.1 GLOSSARY OF ACOUSTIC TERMINOLOGY Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 9-1-G TRANSPORT ASSESSMENT Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 9-1-F TRANSPORT ASSESSMENT Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 9-1-E TRANSPORT ASSESSMENT Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 9-1-D TRANSPORT ASSESSMENT Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 9-1-C TRANSPORT ASSESSMENT Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 9-1-B TRANSPORT ASSESSMENT_PART2 Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 9-1-B TRANSPORT ASSESSMENT_PART1 Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 9-1-A TRANSPORT ASSESSMENT Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 8.1 BUILT HERITAGE STATEMENT Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 7.10BR - VISUAL RECEPTORS Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 7.10A - VISUAL RECEPTORS Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 7.9 PROPOSED LANDSCAPE MITIGATION Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 7.8 PUBLIC RIGHTS OF WAY Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 7.7 SITE SPECIFIC LANDSCAPE CHARACTER AREAS Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 7.6 TOPOGRAPHY Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 7.4 - CUMULATIVE SITES Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 7.3 - PUBLISHED SOURCES OF LANDSCAPE CHARACTER Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 7.2 - LANDSCAPE PLANNING POLICY DESIGNATIONS Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 7.1 - METHODOLOGY Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 2.2 SCOPING OPINION LCC Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 2.1 EIA SCOPING REPORT Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 1.2 EXPERTISE STATEMENT Planning File · 07 Sep 2022
  • ES VOL 2 APPENDIX 1.1 LOCATION OF INFORMATION WITHIN THE ES Planning File · 07 Sep 2022
  • ES VOL 2 - APPENDICES CONTENTS PAGE Planning File · 07 Sep 2022
  • ES VOL 1 FIGURE 11.2 CONSTRUCTION PHASE RECEPTOR PLANS AND AQMA Planning File · 07 Sep 2022
  • ES VOL 1 FIGURE 11.1 SITE PLAN AND RECEPTOR LOCATIONS Planning File · 07 Sep 2022
  • ES VOL 1 FIGURE 10.1 NOISE RECEPTORS Planning File · 07 Sep 2022
  • ES VOL 1 FIGURE 8.1 HERITAGE ASSETS Planning File · 07 Sep 2022
  • ES VOL 1 FIGURE 5.1 OUTLINE PHASING STRATEGY Planning File · 07 Sep 2022
  • ES VOL 1 FIGURE 3.5 ILLUSTRATIVE MASTERPLAN Planning File · 07 Sep 2022
  • ES VOL 1 FIGURE 3.4 LANDSCAPE AND PARAMETERS PLAN Planning File · 07 Sep 2022
  • ES VOL 1 FIGURE 3.2 DEVELOPMENT ZONES LAND USE AND QUANTUM AND BUILDING HEIGHTS Planning File · 07 Sep 2022
  • ES VOL 1 FIGURE 3.1B - FEATURES PLAN (DESIGNATIONS). Planning File · 07 Sep 2022
  • ES VOL 1 FIGURE 3.1A - FEATURES PLAN (ROAD NETWORK). Planning File · 07 Sep 2022
  • ES VOL 1 FIGURE 2.1 CUMULATIVE SCHEMES PLAN Planning File · 07 Sep 2022
  • ES VOL 1 FIGURE 1.1 RED LINE BOUNDARY Planning File · 07 Sep 2022
  • ES VOL 1 CHAPTER 13 SUMMARY Planning File · 07 Sep 2022
  • ES VOL 1 CHAPTER 12 ECOLOGY Planning File · 07 Sep 2022
  • ES VOL 1 CHAPTER 11 AIR QUALITY Planning File · 07 Sep 2022
  • ES VOL 1 CHAPTER 10 NOISE Planning File · 07 Sep 2022
  • ES VOL 1 CHAPTER 9 TRANSPORT AND ACCESS Planning File · 07 Sep 2022
  • ES VOL 1 CHAPTER 8 BUILT HERITAGE Planning File · 07 Sep 2022
  • ES VOL 1 CHAPTER 7 LANDSCAPE AND VIEWS Planning File · 07 Sep 2022
  • ES VOL 1 CHAPTER 6 SOCIOECONOMICS Planning File · 07 Sep 2022
  • ES VOL 1 CHAPTER 5 CONSTRUCTION Planning File · 07 Sep 2022
  • ES VOL 1 CHAPTER 4 ALTERNATIVES Planning File · 07 Sep 2022
  • ES VOL 1 CHAPTER 3 SITE AND DEVELOPMENT Planning File · 07 Sep 2022
  • ES VOL 1 CHAPTER 2 EIA METHODOLOGY Planning File · 07 Sep 2022
  • ES VOL 1 CHAPTER 1 INTRODUCTION Planning File · 07 Sep 2022
  • ES VOL 1 MAIN TEXT AND FIGURES CONTENTS Planning File · 07 Sep 2022
  • ES NON-TECHNICAL SUMMARY K Planning File · 07 Sep 2022
  • ES NON-TECHNICAL SUMMARY J Planning File · 07 Sep 2022
  • ES NON-TECHNICAL SUMMARY I Planning File · 07 Sep 2022
  • ES NON TECHNICAL SUMMARY H Planning File · 07 Sep 2022
  • ES NON TECHNICAL SUMMARY G Planning File · 07 Sep 2022
  • ES NON TECHNICAL SUMMARY F Planning File · 07 Sep 2022
  • ES NON TECHNICAL SUMMARY E Planning File · 07 Sep 2022
  • ES NON-TECHNICAL SUMMARY D Planning File · 07 Sep 2022
  • ES NON-TECHNICAL SUMMARY C Planning File · 07 Sep 2022
  • ES NON-TECHNICAL SUMMARY B Planning File · 07 Sep 2022
  • ES NON-TECHNICAL SUMMARY A Planning File · 07 Sep 2022
  • WCR FINANCIAL VIABILITY STATEMENT_PART3 Planning File · 07 Sep 2022
  • WCR FINANCIAL VIABILITY STATEMENT_PART2 Planning File · 07 Sep 2022
  • WCR FINANCIAL VIABILITY STATEMENT_PART1 Planning File · 07 Sep 2022
  • PRELIMINARY UNEXPLODED ORDANCE RISK ASSESSMENT Planning File · 07 Sep 2022
  • WC WIE11556-110-R-1.3.1-PRA APPENDIX D_E_F_G Planning File · 07 Sep 2022
  • WC WIE11556-110-R-1.3.1-PRA APPENDIX C10 Planning File · 07 Sep 2022
  • WC WIE11556-110-R-1.3.1-PRA APPENDIX C9 Planning File · 07 Sep 2022
  • WC WIE11556-110-R-1.3.1-PRA APPENDIX C8 Planning File · 07 Sep 2022
  • WC WIE11556-110-R-1.3.1-PRA APPENDIX C7 Planning File · 07 Sep 2022
  • WC WIE11556-110-R-1.3.1-PRA APPENDIX C6 Planning File · 07 Sep 2022
  • WC WIE11556-110-R-1.3.1-PRA APPENDIX C5 Planning File · 07 Sep 2022
  • WC WIE11556-110-R-1.3.1-PRA APPENDIX C4 Planning File · 07 Sep 2022
  • WC WIE11556-110-R-1.3.1-PRA APPENDIX C3 Planning File · 07 Sep 2022
  • WC WIE11556-110-R-1.3.1-PRA APPENDIX C2 Planning File · 07 Sep 2022
  • WC WIE11556-110-R-1.3.1-PRA APPENDIX C1 Planning File · 07 Sep 2022
  • WC WIE11556-110-R-1.3.1-PRA APPENDIX B Planning File · 07 Sep 2022
  • WC WIE11556-110-R-1.3.1-PRA APPENDIX A Planning File · 07 Sep 2022
  • WC WIE11556-110-R-1.3.1-PRA Planning File · 07 Sep 2022
  • WC LANCASHIRE CENTRAL SITE CUERDEN - SUMMARY OF ARCHAEOLOGICAL INVESTIGATIONS Planning File · 07 Sep 2022
  • WC LANCASHIRE CENTRAL SCI FINAL 280622 Planning File · 07 Sep 2022
  • WC LANCASHIRE CENTRAL - ECONOMIC BENEFITS STATEMENT 28.06.22 FINAL Planning File · 07 Sep 2022
  • WC EMPLOYMENT SKILLLS STATEMENT Planning File · 07 Sep 2022
  • WC EMPLOYMENT MARKET REPORT - LANCASHIRE CENTRAL (CUERDEN STRATEGIC SITE). Planning File · 07 Sep 2022
  • WC DSFRA APP I Planning File · 07 Sep 2022
  • WC DSFRA APP H Planning File · 07 Sep 2022
  • WC DSFRA APP G Planning File · 07 Sep 2022
  • WC DSFRA APP F PART 3 OF 3 Planning File · 07 Sep 2022
  • WC DSFRA APP F PART 2 OF 3 Planning File · 07 Sep 2022
  • WC DSFRA APP F PART 1 OF 3 Planning File · 07 Sep 2022
  • WC DSFRA APP E Planning File · 07 Sep 2022
  • WC DSFRA APP D Planning File · 07 Sep 2022
  • WC DSFRA APP C Planning File · 07 Sep 2022
  • WC DSFRA APP B PART 2 OF 2R Planning File · 07 Sep 2022
  • WC DSFRA APP B PART 1 OF 2 Planning File · 07 Sep 2022
  • WC DSFRA APP A Planning File · 07 Sep 2022
  • WC DSFRA Planning File · 07 Sep 2022
  • WC 70084465 - LANCASHIRE CENTRAL - TRAVEL PLAN - V1_OPTIMIZED_UPDATEDPPR Planning File · 07 Sep 2022
  • WC 20220621 LANCASHIRE CENTRAL_BREEAM PRE-ASSESSMENT V3 (ISSUED). Planning File · 07 Sep 2022
  • WC 220711 WIE11556-107-R-1-3-1 Planning File · 07 Sep 2022
  • WC 220624 BUILT HERITAGE STATEMENT Planning File · 07 Sep 2022
  • WC 220624 21616 A5 SS 220616 RIA FINAL Planning File · 07 Sep 2022
  • WC 220624 21616 (LANCASHIRE CENTRAL) PLANNING STATEMENT OPTIMISED Planning File · 07 Sep 2022
  • WC 22-06-23 UTILITIES REPORT V1 Planning File · 07 Sep 2022
  • WC 22-06-23 ENERGY REPRT FINAL V1 Planning File · 07 Sep 2022
  • MRA APPENDIX C (PART10) Planning File · 07 Sep 2022
  • MRA APPENDIX C (PART9) Planning File · 07 Sep 2022
  • MRA APPENDIX C (PART8)R Planning File · 07 Sep 2022
  • MRA APPENDIX C (PART7) Planning File · 07 Sep 2022
  • MRA APPENDIX C (PART6) Planning File · 07 Sep 2022
  • MRA APPENDIX C (PART5) Planning File · 07 Sep 2022
  • MRA APPENDIX C (PART4). Planning File · 07 Sep 2022
  • MRA APPENDIX C (PART3)R Planning File · 07 Sep 2022
  • MRA APPENDIX C (PART2). Planning File · 07 Sep 2022
  • MRA APPENDIX C (PART1). Planning File · 07 Sep 2022
  • MRA APPENDIX B Planning File · 07 Sep 2022
  • MRA APPENDIX A Planning File · 07 Sep 2022
  • WIE11556-110-R-2-3-2-MRA Planning File · 07 Sep 2022
  • WIE11556-109-R-1.1.6 - LANCASHIRE CENTRAL RESIDENTIAL SUITABILITY REPORT Planning File · 07 Sep 2022
  • LANCASHIRE CENTRAL TA V0.3_OPTIMIZED VII APP K Planning File · 07 Sep 2022
  • LANCASHIRE CENTRAL TA V0.3_OPTIMIZED VI APP J Planning File · 07 Sep 2022
  • LANCASHIRE CENTRAL TA V0.3_OPTIMIZED V APP J Planning File · 07 Sep 2022
  • LANCASHIRE CENTRAL TA V0.3_OPTIMIZED IV APP I AND J Planning File · 07 Sep 2022
  • LANCASHIRE CENTRAL TA V0.3_OPTIMIZED III APP G TO H Planning File · 07 Sep 2022
  • LANCASHIRE CENTRAL TA V0.3_OPTIMIZED II APP D TO F - UPDATED PARAMETER PLANS R Planning File · 07 Sep 2022
  • LANCASHIRE CENTRAL TA V0.3_OPTIMIZED I TEXT PLUS APP A TO C - UPDATED PARAMETER Planning File · 07 Sep 2022
  • LANCASHIRE CENTRAL TA V0.3_OPTIMIZED I TEXT PLUS APP A TO C - UPDATED PARAMETER Planning File · 07 Sep 2022
  • BIODIVERSITY NET GAIN LANCASHIRE CENTRAL R4 Planning File · 07 Sep 2022
  • 21017-DESIGN CODE-P5-2022.07.01 Planning File · 07 Sep 2022
  • 21017-DESIGN ACCESS STATEMENT-P5-20220701 Planning File · 07 Sep 2022
  • 84465-WSP-XX-DR-004_1-2500 Planning File · 07 Sep 2022
  • MMD-370964-C-DR-00-XX-0015 Planning File · 07 Sep 2022
  • MMD-370964-C-DR-00-XX-0014 Planning File · 07 Sep 2022
  • MMD-357876-C-DDR-00-0007 Planning File · 07 Sep 2022
  • SF 3236 LM05 REV F - LANDSCAPE PROPOSALS PHASE D Planning File · 07 Sep 2022
  • SF 3236 LM04 REV F - LANDSCAPE PROPOSALS PHASE C Planning File · 07 Sep 2022
  • SF 3236 LM03 REV F - LANDSCAPE PROPOSALS PHASE B Planning File · 07 Sep 2022
  • SF 3236 LM02 REV G - LANDSCAPE PROPOSALS PHASE A Planning File · 07 Sep 2022
  • SF 3236 LM01 REV G - GREEN INFRASTRUCTURE A Planning File · 07 Sep 2022
  • 84465-WSP-XX-DR-011 Planning File · 07 Sep 2022
  • 84465-WSP-XX-DR-010 Planning File · 07 Sep 2022
  • 21017-FRA-XX-ZZ-DR-A-9113_P9_PARAMETERS PLAN 3 Planning File · 07 Sep 2022
  • 21017-FRA-XX-ZZ-DR-A-9112_P10_PARAMETERS PLAN 2 Planning File · 07 Sep 2022
  • 21017-FRA-XX-ZZ-DR-A-9111_P8_PARAMETERS PLAN 1 Planning File · 07 Sep 2022
  • 21017-FRA-XX-ZZ-DR-A-91-0001_P4-SITE LOCATION PLAN Planning File · 07 Sep 2022
  • 220726 21616 (LANCASHIRE CENTRAL) APPLICATION COVERING LETTER Planning File · 07 Sep 2022
  • APPLICATIONFORMREDACTED Planning File · 07 Sep 2022

Trade members open them from here.

Open the documents

After the decision

South Ribble has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Wigan Road Cuerden Bamber Bridge

    23/00034/CTY Submitted 13 Jan 2023 458m away

    Consultation from Lancashire County Council regarding an application for Outline Planning Permission (with all matters reserved save for access from the public highway to Development Zones A, B and D (M65 Terminus Roundabout, A49 Wigan Road and Stanifield Lane) and strategic green infrastructure/landscaping) for a mixed-use development including the provision of Employment use (Use Classes B2/B8/E(g)); retail (use Class E(a)); food, drink and drive-through restaurant use (Use Class E(b)/Sui Generis Drive-Through); hotel use (Use Class C1); health, fitness and leisure use (Use Classes E(d)/F(e)/F2(b)); creche/nursery (Class E(f)); car showrooms (Use Class Sui Generis Car Showroom); Residential use (C3) the provision of associated car parking, access, public open space, landscaping and drainage. (Additional documents received)

    Granted Other 53 docs
  • 21 Cuerden Close Cuerden Bamber Bridge Preston PR5 6BX

    24/00989/PDE Submitted 21 Nov 2024 496m away

    Notification of a proposed single storey rear extension measuring 4.5m in depth, with eaves height of 2.5m, and a maximum height of 2.75m

    Granted Extension 7 docs
    Small domestic

In South Ribble

  • Lower Hall Farm Potters Lane Samlesbury Preston Lancashire PR5 0UE

    Application to determine if prior approval is required for an agricultural storage building.

    24 Apr 2026 Other
  • 07/2026/00203/HAZ Status unknown

    Evans Vanodine International Walton Summit Industrial Estate Bamber Bridge Preston Lancashire PR5 8AH

    Application to amend its hazardous substance consent for the manufacture, storage and supply of hazardous substances (Detergents/Disinfectants) with an increase in quantities from approved application 07/2017/3057/HAZ

    12 Mar 2026 Other
  • Joyston 10 Town Lane Much Hoole Preston Lancashire PR4 4GJ

    Prior Approval for the erection of an agricultural building

    29 Nov 2024 Other
  • Tyndale Building Runshaw College Langdale Road Leyland Lancashire PR25 3AQ

    Partial demolition of Tyndale building

    30 Jan 2023 Other
  • Lever House County Primary School Bristol Avenue Farington Preston Lancashire PR25 4QP

    PROVISION OF 4NO. 6 METRE LIGHTING COLUMNS TO CAR PARK

    18 May 2022 Other