Council hub · North West
South Ribble planning applications
435 applications. 99% approved. 50 days to decide.
As of July 2026, PlanIndex holds 435 planning applications from South Ribble. 115 were decided in the trailing 12 months, with 99% of clear-cut outcomes approved.
Latest applications
Data to July 2026
-
07/2026/00562/DIS Status unknown
Land Between 196-208 Liverpool Road Hutton Lancashire
Discharge of conditions 5-6, 9-11, 15-20 pursuant to permission 07/2026/00307/TDC - technical details for proposed 3 no: dwelling following Permission In Principle 07/2025/00237/PIP
-
07/2026/00554/HPD Status unknown
34 Station Road New Longton Preston Lancashire PR4 4ZB
Application for prior approval for single storey rear extension. Proposed length 3.6m and height 3.2m
-
07/2026/00553/HOH Status unknown
5 Orchard Lane Longton Preston Lancashire PR4 5AX
Extension to first floor rear dormer. The rear dormer extension would be the full width of the rear elevation.
-
07/2026/00556/HPD Status unknown
16 Poplar Grove Bamber Bridge Preston Lancashire PR5 6RE
Prior Approval for a larger home extension. Proposed length - 6.08m, height - 3.95m and height to eaves - 2.55m.
-
07/2026/00552/DIS Status unknown
42 Hall Carr Lane Longton Preston Lancashire PR4 5JJ
Discharge of conditions 3 (materials), 4 (levels), 6 (construction management plan), 10 (invasive species method statement), 11 (RAMS), 12 (biodiversity), 14 (tree protection), 15 (landscaping), 16 (surface water drainage), 18 (foul drainage) and 19 (boundary treatments) of planning permission 07/2026/00054/TDC
-
07/2026/00549/HOH Status unknown
48 Withy Grove Crescent Bamber Bridge Preston Lancashire PR5 6WX
Front porch
-
07/2026/00547/NMA Status unknown
Oaklands Grange Nursing Home Moss Lane Leyland Lancashire PR25 4SH
Non-Material Amendment to planning approval 07/2024/00617/VAR to remove part brick slip and replace with through-colour render and replace angled mansard roof truss with pitched roof and vertically hung tile
-
07/2026/00548/NMA Status unknown
2 Brookdale New Longton Preston Lancashire PR4 4XL
Non material amendment to permission 07/2026/00199/HOH to amend window locations and sizes, include additional windows and amend approved materials
-
07/2026/00550/NMA Status unknown
Test Track Aston Way Moss Side Industrial Estate Leyland Lancashire PR26 7TZ
Non material amendment to application ref. 07/2017/3361/ORM (updated Tree Planting Schedule and Tree Survey and Constraints Assessment) seeking removal of trees for construction of temporary haul road
-
07/2026/00542/DIS Status unknown
Applebee Wood Community Specialist School Far Croft Lostock Hall Preston Lancashire PR5 5SS
Discharge of Conditions no 6 (SUDs Site Specific operation and maintenance manual) and 24 (Community Use Agreement) of planning permission 07/2024/00831/FUL (Demolition of existing buildings and erection of a two-storey educational building (Use Class F1(a)) containing roof top photovoltaic (PV) panels, erection of a separate canopy structure covered by PV Panels, installation of ground source heat pumps, provision of hard and soft landscaping, car parking, cycle parking and revised pedestrian access.)
Recent decisions
Data to July 2026
-
07/2025/00230/FUL Withdrawn
Penwortham Girls High School Cop Lane Penwortham Preston Lancashire PR1 0SR
APPLICATION FOR THE DIVERSION OF A PUBLIC RIGHT OF WAY UNDER S257 TOWN AND COUNTRY PLANNING ACT
-
07/2026/00535/CLD Granted
1 Ratten Lane Hutton Preston Lancashire PR4 5TE
Certificate of lawful development for proposed single storey rear extension
-
07/2026/00400/TPO Granted
6 Partridge Close Longton Preston Lancashire PR4 5BW
Ash Tree (T1) Fell
-
07/2026/00413/HOH Granted
Moorthorpe Barn Drumacre Lane East Longton Preston Lancashire PR4 4SD
Erection of detached garage with home office in the roof space
-
07/2026/00415/ADV Granted
Leyland Leisure Centre Lancastergate Leyland Lancashire PR25 2EX
Advertisement Banner & Frame
-
07/2026/00431/CLD Granted
3 Cooper Hill Drive Walton-le-dale Preston Lancashire PR5 4HE
Certificate of lawfulnness for proposed construction of rear dormer, erection of single storey side extension, internal and external cosmetic amendments, extension of front driveway and demolition of existing garage
-
07/2026/00443/PIP Withdrawn
The Lodge 2 Moor Lane Hutton Preston Lancashire PR4 5SE
Following demolition of the existing building, Permission In Principle Stage 1 application for erection of up to 2no. dwellings and associated infrastructure.
-
07/2026/00445/NMA Granted
Land To West Newgate Lane Whitestake Lancashire PR4 4JU
Non-Material Amendment to Planning Approval 07/2026/00265/FUL - Revised phasing plan.
-
07/2026/00528/NOT Granted
Telecommunications Mast Tomlinson Road Leyland Lancashire
Telecommunications installation replacement mast 19.9m high and other alternations of cabinets
-
07/2026/00412/CLD Granted
17 Green Drive Penwortham Preston Lancashire PR1 0RD
Certificate of Lawfulness for a proposed detached timber-framed garage with mono-pitch roof for incidental domestic storage
The full record
Decisions between 2002 and 2026
PlanIndex holds 300 decisions from South Ribble between 2002 and 2026, part of 435 applications on record. Over that period 97% of clear-cut outcomes were approvals, 238 granted against 8 refused. The busiest single year was 2026, with 225 applications recorded.
The trailing-year figures above track current activity. This record reaches back further, so a decision here may predate the online portal; each application still has its own page with the source link.
From the archive
Earliest records shown in full
-
07/2002/0912 Granted
Little Orchard Moss Lane Penwortham Preston
Two storey rear extension. Bay window to front with canopy over
-
07/2016/0161/PDTEL Granted
STREET RECORD Leyland Road Penwortham Lancashire
CTIL 127659, VF83577, TEF034215 upgrade of telecommunications equipment
-
07/2016/0167/PDTEL Granted
STREET RECORD Liverpool Road Hutton Lancashire
Proposewd base station upgrad at CTIL 131604 VF 64467 TEF N/A
-
07/2022/00816/TPO Refused
3 Bank Close Longton Preston Lancashire PR4 5DH
Proposed Tree Works: T1 Poplar, T2 Horse Chestnut T3 Cypress - Remove
-
07/2021/00333/TDE Withdrawn
Land Adjacent To Roundabout At Farington Road / Centurion Way Farington Preston Lancashire PR25 3GR
Proposed 20m Phase 8 Monopole C/W wrapround Cabinet at base and associated ancillary works.
-
07/2021/00762/NMA Granted
Land Off Croston Road and Moss Lane Flensburg Way Farington Moss Lancashire
Non material amendment to planning permission 07/2020/00544/REM for amendment of Style 3 house types and re-distribute approved brick choices throughout the development
-
07/2021/00761/NMA Granted
Land Off Croston Road and Moss Lane Flensburg Way Farington Moss Lancashire
Non material amendment to planning permission 07/2020/00552/FUL (Demolition of existing farm buildings and construction of 121 dwellings (Use Class C3), including access, internal roads, garages, car parking and associated infrastructure) for amendment of Style 3 house types and re-distribute approved brick choices throughout the development
-
07/2021/00734/NMA Granted
154 Brindle Road Bamber Bridge PR5 6ZH
Non material change to orientation of proposed annex as approved 07/2021/00277/HOH
-
07/2021/00670/DIS Decided
Earnshaw Business Centre Hugh Lane Leyland Preston Lancashire PR26 6PD
Discharge of conditions pursuant to application 07/2020/00669//REM
-
07/2021/00647/HOH Granted
5 The Vinery New Longton Preston Lancashire PR4 4YB
Dormer extension to front and dormer to rear to be constructed under Permitted Development
Decision speed
12 months to July 2026, where both dates are published
-
Within 8 weeks the statutory target for most applications 78 68%
-
8 to 13 weeks the target band for major development 24 21%
-
Over 13 weeks often extended by agreement 13 11%
Common questions
How many planning applications does South Ribble decide?
In the 12 months to July 2026, South Ribble decided 115 planning applications. 99% of clear-cut outcomes were approvals.
How long does a planning decision take in South Ribble?
The median time from a planning application being received to a decision was 50 days over the 12 months to July 2026. Individual cases vary with complexity and consultation responses.
How many South Ribble decisions arrive within the eight week target?
Of the 115 decisions in the 12 months to July 2026 where both dates are published, 68% came within eight weeks of the application being received, and 89% within thirteen weeks.
How many planning applications has South Ribble decided in total?
PlanIndex holds 300 decisions from South Ribble between 2002 and 2026, out of 435 applications on record. Across that whole period 97% of clear-cut outcomes were approvals.
When is planning activity busiest in South Ribble?
June 2026 was the busiest month across the 12 months to July 2026, with 59 applications recorded. The monthly pattern is listed on this page.
How do I find a planning application by its reference number?
Every application indexed here has its own page at a stable address. Look the reference up in a search engine together with the council name, or browse the latest applications below. Each page shows the description, address, dates and decision as the council published them.
Cite these figures
South Ribble: 435 planning applications on record as of July 2026. Trailing 12 months: 115 decided, 99% approved, median 50 days to a decision. 241 new applications received in the same period. Decisions on record run between 2002 and 2026: 300 in total, 97% approved. Source: PlanIndex, planindex.co.uk.