Planning application
Winston Drumacre Lane East Longton Preston Lancashire PR4 4SD
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application to discharge conditons 3, 6, 8, 9, 15 and 19 of planning approval 07/2022/00795/FUL
As published by the council, reference 07/2023/00168/DIS
Application record
- Reference
- 07/2023/00168/DIS
- Type
- Discharge of conditions
- Status
- Unknown
- Decision
- Granted As published: Part Discharged
- Received
- 27 Feb 2023
- Validated
- 27 Feb 2023
- Decided
- 11 Apr 2023
- Ward
- Longton and Hutton West
- Parish
- Longton Parish Council
- Decision by
- Delegated Decision
- Postcode
- PR4 4SD
Site history
Applications at this address on the South Ribble register
This site has had 2 applications since 2023: 2 approved, 0 refused.
-
07/2024/00802/DIS Granted
Winston Drumacre Lane East Longton Preston Lancashire PR4 4SD
Discharge of condition 16 SAP Calcs of planning approval 07/2022/00795/FUL
Timeline
Dates from the published record
-
27 Feb 2023
Received by South Ribble
-
11 Apr 2023
Decision issued: Part Discharged
-
15 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Application: 07/2022/00795/FUL
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
- DISCHARGE OF CONDITIONS LETTER
- ECOLOGY
- LCC HIGHWAYS
- DECISION NOTICE WITH CONDITIONS
- CONSTRUCTION PHASE PLAN
- SAP INPUT SUMMARY SHEET
- CONDITION 8 HIGHWAY MANAGEMENT AND MAINTENANCE PLAN
- CONDITION 19 INVASIVE SPECIES
- APPLICATIONFORMREDACTED.
- APPLICATIONFORM
- DESK STUDY
- LOCATION PLAN
- SITE ACCESS DETAILS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
South Ribble granted permission on 11 April 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Winston Drumacre Lane East Longton Preston Lancashire PR4 4SD
Discharge of condition 16 SAP Calcs of planning approval 07/2022/00795/FUL
Granted Conditions 5 docs -
Peel View Garage Drumacre Lane East Longton Preston Lancashire PR4 4SD
Discharge of conditions 2 (drainage) and 6 (dust management) of planning permission 07/2022/00160/FUL
Granted Conditions 7 docs -
Moorthorpe Drumacre Lane East Longton Preston Lancashire PR4 4SD
96% historically approved · decision due ~8 Dec
Discharge of conditions 1-20 pursuant to permission 07/2024/00262/VAR - variation of condition 2 relating to permission 07/2023/00408/REM to substitute Plot 4 for an alternative housetype and to allow erection of a detached garage to plot 5 with conversion of existing garage and rear balcony.
Awaiting decision -
Moorthorpe Barn Drumacre Lane East Longton Preston Lancashire PR4 4SD
96% historically approved · decision due ~12 Aug
Erection of detached garage with home office in the roof space
Awaiting decision 9 docs -
Yard North Of Drumacre Lane East Longton Lancashire
Discharge of conditions 3 Materials, 8 Foul drainage and 9 Surface water drainage of planning approval 07/2023/00145/FUL
Granted Conditions 7 docs -
Pipe House Farm Six Acre Lane Longton Preston Lancashire PR4 4SE
96% historically approved · decision due ~4 Nov
Outline application (access, layout and scale) for erection of three detached dwellings and associated works following demolition of existing buildings and structures.
Awaiting decision Outline Demolition 16 docs
Other condition discharge and variation applications
In South Ribble
-
07/2026/00578/DIS Status unknown
Land Off Quin Street and John Street, Leyland, PR25 2SY
Discharge of Conditions Nos 5 (Site Investigation), 6 (Affordable Housing), 7 (Landscaping Details), 10 (Highways Works) and 12 (Street Management and Maintenance) of planning permission 07/2023/00644/VAR (Variation of Condition 5 of Planning Approval 07/2022/00748/FUL)
-
07/2026/00514/DIS Status unknown
Mcdonald's Restaurants Ltd Preston New Road Samlesbury Preston PR5 0UJ
Discharge of Condition no 5 (highway works) of planning permission ref 07/2025/00269/FUL (Erection of a drive-thru restaurant (Use Class E / Sui Generis) with associated access, servicing, car parking, hard and soft landscaping, substation, engineering works and other associated works.
-
07/2026/00513/DIS Status unknown
Mcdonald's Restaurants Ltd Preston New Road Samlesbury Preston PR5 0UJ
Discharge of Condition no 9 (SUDs and maintainance plan) of planning permisison ref 07/2025/00269/FUL (Erection of a drive-thru restaurant (Use Class E / Sui Generis) with associated access, servicing, car parking, hard and soft landscaping, substation, engineering works and other associated works.
-
07/2026/00233/DIS Granted
Land At Penwortham Mills Factory Lane Penwortham Preston Lancashire PR1 9SN
Discharge of conditions 14 (pre-occupation surface water drainage - Lidl Parcel only) of permission 07/2024/00296/VAR for Variation of condition 2 (Lidl phase 1A only) of permission 07/2020/01034/ORM for full planning permission for a phased development comprising: the erection of a retail store (Use Class E) with associated access, car parking, electricity sub-station re-location, landscaping and servicing and delivery areas (Phase 1a); the erection of 120 dwellings (Use Class C3) and associated access off the Cross Borough Link Road, car parking, public open space, landscaping, and associated engineering and infrastructure works (Phase 1b); and Outline planning permission, with all matters reserved except for access, for a phased residential development comprising the erection of up to 181 dwellings (Phases 2 & 3).
-
07/2026/00316/DIS Granted
Yew Tree Inn 100 Victoria Road Walton-Le-Dale Preston Lancashire PR5 4AU
Discharge of conditions 3 & 5 of permission 07/2025/01022/FUL - Temporary access creation to maintain customer and supplier access to the Yew Tree during construction of the Preston and South Ribble Area 3 and 4 Flood Risk Management Scheme