Planning application

Occleshaw House 2 Worden Lane Leyland Lancashire PR25 3EL

Granted South Ribble 07/2022/00932/FUL Full Application

Works: New dwelling Loft or dormer Roofing Windows or glazing Several homes

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use of Grade II listed commerical property to ground floor front commercial and eight flats across three floors with ancillary works including repair and restoration of building, new windows to rear to match existing and new roof lights.

As published by the council, reference 07/2022/00932/FUL

Application record

Reference
07/2022/00932/FUL
Type
Full Application
Status
Awaiting decision
Decision
Approval with Conditions
Received
15 Nov 2022
Validated
15 Nov 2022
Decided
27 Jan 2023
Ward
Buckshaw and Worden
Decision by
Delegated Decision
Postcode
PR25 3EL

Timeline

Dates from the published record

  1. 15 Nov 2022

    Received by South Ribble

  2. 27 Jan 2023

    Decision issued: Approval with Conditions

  3. 24 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Occleshaw House 2 Worden Lane Leyland Lancashire PR25 3EL

    07/2022/00933/LBC Submitted 15 Nov 2022 0m away

    Change of use of Grade II listed commerical property to ground floor front commercial and eight flats across three floors with ancillary works including repair and restoration of building, new windows to rear to match existing and new roof lights.

    Granted Heritage and listed buildings New dwelling Loft or dormer +2 21 docs
    Several homes
  • Occleshaw House 2 Worden Lane Leyland Lancashire PR25 3EL

    07/2019/12130/PIP Submitted 18 Nov 2019 0m away

    Application in Principle for change of use from offices to apartments

    Granted Outline New dwelling 14 docs
  • 10 Worden Lane Leyland Lancashire PR25 3EL

    07/2019/1113/LBC Submitted 24 Oct 2019 35m away

    Listed building consent for repositioning side access door and replace transom over an internal door

    Granted Heritage and listed buildings 14 docs
  • 24 Worden Lane Leyland Lancashire PR25 3EL

    07/2026/00510/TPO Submitted 8 Jul 2026 36m away

    95% historically approved · decision due ~8 Sep

    T1 Beech crown lift on the road side for highway regulations, 5.5m over the road 2.5m over the footpath

    Awaiting decision Trees 4 docs
  • 9 - 11 Towngate Leyland Lancashire PR25 2EN

    07/2026/00222/LBC Submitted 18 Mar 2026 39m away

    95% historically approved · decision due ~22 Jul

    Listed Building Consent for replacement non-illuminated signage scheme

    Awaiting decision Heritage and listed buildings 12 docs
  • 9 - 11 Towngate Leyland Lancashire PR25 2EN

    07/2026/00423/ADV Submitted 4 Jun 2026 39m away

    95% historically approved · decision due ~30 Jul

    Advertisement Consent for replacement non-illuminated signage scheme including new wall mounted sign to gable end

    Awaiting decision Advertising 11 docs

In South Ribble

  • 07/2026/00092/FUL Withdrawn

    Ranch House Farm Brownhill Lane Longton Preston Lancashire PR4 4SJ

    Proposed change of use of 5m wide x 45m long strip of paddock to enable construction of double gargage/ garden store for residential use, together with associated extended driveway access and erection of 6m tall flag pole

    6 Feb 2026 Full applications
  • 07/2026/00621/FUL Awaiting decision

    Land Off Howick Cross Lane Penwortham PR1 0NU

    Change of use from horse grazing field to dog walking field, erection of boundary treatment and extension of the existing hard standing

    24 Aug 2026 Full applications
  • 07/2026/00612/FUL Status unknown

    Ranch House Farm Brownhill Lane Longton Preston Lancashire PR4 4SJ

    Proposed change of use of 5m wide x 45m long strip of paddock to enable construction of double garage garden store, associated extended driveway access and erection of 6m tall flagpole.

    20 Aug 2026 Full applications
  • 07/2026/00608/FUL Awaiting decision

    32 Preston Road Leyland Lancashire PR25 4NT

    Retrospective Part Change of Use from Retail (Class E) to Tyre Fitting and Servicing Workshop (Sui Generis)

    18 Aug 2026 Full applications
  • 07/2026/00597/FUL Awaiting decision

    2 Liverpool Old Road Walmer Bridge Preston Lancashire PR4 5GA

    Proposed re-roofing, partial demolition and alterations to storage annexe building

    12 Aug 2026 Full applications