Planning application
Land North Of Stoke Lane Dunston Norfolk
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The installation and operation of a Battery Energy Storage System to provide standby emergency electricity for National Grid in times of high electricity demand or when renewable energy projects are unable to fulfil demand. This would be for the installation of 130MW of modular battery units with ancillary equipment, including power conversion units, 132kV transformer compound, metering cabinet, switchroom, DNO control room and welfare container.
As published by the council, reference 2021/2645
Application record
- Reference
- 2021/2645
- Type
- Full
- Status
- Decided
- Decision
- Granted As published: Approval with Conditions
- Received
- 2 Dec 2021
- Validated
- 2 Dec 2021
- Decided
- 8 Sep 2022
- Ward
- Mulbarton And Stoke Holy Cross
- Parish
- Stoke Holy Cross
- Decision by
- Development Management Committee
Site history
Applications at this address on the South Norfolk register
This site has had 5 applications since 2021: 5 approved, 0 refused.
-
2025/3352 Granted
Land North Of Stoke Lane Dunston Norfolk
Details reserved by condition 3 (secondary access details) and condition 4 (tree protection scheme) of 2024/0243
-
2022/2367 Granted
Land North Of Stoke Lane Dunston Norfolk
Detail for conditions 6a of 2021/2645 - (6a) written scheme of investigation
-
2022/2358 Granted
Land North Of Stoke Lane Dunston Norfolk
Discharge of condition 7 from 2021/2645 - Tree protection measures
-
2022/2277 Granted
Land North Of Stoke Lane Dunston Norfolk
Details for condition 8 of 2021/2645 - Landscaping scheme
Timeline
Dates from the published record
-
2 Dec 2021
Received by South Norfolk
-
8 Sep 2022
Decision issued: Approval with Conditions
-
24 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
3 later applications on the register refer to this one:
-
2022/2367 Granted
Land North Of Stoke Lane Dunston Norfolk
Detail for conditions 6a of 2021/2645 - (6a) written scheme of investigation
-
2022/2358 Granted
Land North Of Stoke Lane Dunston Norfolk
Discharge of condition 7 from 2021/2645 - Tree protection measures
-
2022/2277 Granted
Land North Of Stoke Lane Dunston Norfolk
Details for condition 8 of 2021/2645 - Landscaping scheme
Who's behind it
Company information only, from the register and Companies House
Clive Fagg Planning Agent, a planning consultancy
26 applications on PlanIndex · across 20 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
83 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
South Norfolk granted permission on 8 September 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land North Of Stoke Lane Dunston Norfolk
Detail for conditions 6a of 2021/2645 - (6a) written scheme of investigation
Granted Conditions 6 docs -
Land North Of Stoke Lane Dunston Norfolk
Discharge of condition 7 from 2021/2645 - Tree protection measures
Granted Conditions Trees 5 docs -
Land North Of Stoke Lane Dunston Norfolk
The installation and operation of a Battery Energy Storage System to provide standby emergency electricity for National Grid in times of high electricity demand or when renewable energy projects are unable to fulfil demand. This would be for the installation of 130MW of modular battery units with ancillary equipment, including power conversion units, 132kV transformer compound, metering cabinet, switchroom, DNO control room and welfare container.
Granted Full applications 83 docs -
Land North Of Stoke Lane Dunston Norfolk
Details for condition 8 of 2021/2645 - Landscaping scheme
Granted Conditions 9 docs -
Land North Of Stoke Lane Dunston Norfolk
Details reserved by condition 3 (secondary access details) and condition 4 (tree protection scheme) of 2024/0243
Granted Conditions Trees 17 docs -
Land North Of Stoke Lane Dunston Norfolk
Details reserved by condition 3 (secondary access details) and condition 4 (tree protection scheme) of 2024/0243
Granted Conditions Trees 17 docs
Other full applications
In South Norfolk
-
2025/3481 Refused
Former Nurseries Spicers Lane Forncett St Mary Norfolk NR16 1JS
Erection of a self-build single storey home with associated infrastructure works and reuse of an existing access
-
2025/2324 Granted
Land South Of All Saints Church Church Lane Welborne Norfolk
Change of use of grass pasture to cemetery
-
2026/0174 Granted
Land South Of Richard Oakes Road Aylsham Norfolk
6 Units (3 buildings) comprising 1859 m2 of (Class B2/B8/E(g)) with associated servicing and parking areas, landscaping and access.
-
2026/2952 Awaiting decision
Unit 2 European Trade Centre Hempnall Road Morningthorpe Norfolk NR15 2AG
Retention of lean-to structure for storage and ancillary use in connection with Wheels 4 Less at the The European Trade Centre
-
2026/2178 Granted
Barnwell Print Dunkirk Aylsham Norfolk NR11 6SU
Change of use from Manufacturing (B2) to Storage and Distribution (B8).