Proposal
Close Two Existing Exits And Replace With Single Vehicular Access.
As published by the council, reference 20021238
Timeline
Dates from the published record
-
13 Aug 2002
Received by South Norfolk
-
15 Aug 2002
Validated
Checked as complete and ready for consideration.
-
15 Nov 2002
Decision issued: Approval with Conditions
-
24 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
20021238 Granted
Eastgate House Easton Way Eastgate Cawston
Close Two Existing Exits And Replace With Single Vehicular Access.
-
20220065 Granted
Southview Falgate Cawston NR10 4HG
Two storey side extension
-
20220065 Granted
Southview Falgate Cawston NR10 4HG
Two storey side extension
-
2024/2529 Granted
Wyndsmoor Easton Way Cawston Norfolk NR10 4HF
proposed detached garage/store to rear garden (partially constructed)
-
2024/2529 Granted
Wyndsmoor Easton Way Cawston Norfolk NR10 4HF
proposed detached garage/store to rear garden (partially constructed)
-
2025/3621 Granted
Land West Of Old Friendship Lane Cawston Norfolk
Discharge of statutory Biodiversity Gain Plan Condition and details of condition 3 (location of muck heap), condition 4 (proposed interim storage, removal frequency and disposal arrangements of manure from the site) and condition 5 (Habitat Management and Monitoring Plan) of permission 2024/3823
Other full applications applications
In South Norfolk
-
2026/0754 Granted
Land Adj The Grove Booton Norfolk
Installation of post construction field drainage to support the operation of the Hornsea Project Three onshore export cable route (EIA Development).
-
2025/2830 Granted
Land South Of Dairy Farm Burgh Road Wheatacre Norfolk
Erection of new self build 3-bedroom detached single storey dwelling/farmhouse
-
2026/0612 Granted
Land South East Of Easton Road Marlingford Norfolk
Retention of vehicular crossover Access Point 32 created by Orsted Power (UK) Ltd for the 'Hornsea Project Three Offshore Wind Farm' Project
-
2026/0861 Granted
The School House The Street Framingham Earl Norfolk NR14 7QY
Change of use from a fostering agency (sui generis) to children's day nursery (class E(f)) and associated external alterations
-
2026/2106 Awaiting decision
The Old Vineyard Overwood Lane Forncett St Peter Norfolk
Construction of 1no. rural worker and self build dwelling.