Planning application
North Lodge Wroxham Road Rackheath
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Conservatory And Store Shed
As published by the council, reference 20021011
Application record
- Reference
- 20021011
- Type
- Full
- Status
- Decided
- Decision
- Approval with Conditions
- Received
- 27 Jun 2002
- Validated
- 28 Jun 2002
- Decided
- 13 Aug 2002
- Parish
- Rackheath
Timeline
Dates from the published record
-
27 Jun 2002
Received by South Norfolk
-
28 Jun 2002
Validated
Checked as complete and ready for consideration.
-
13 Aug 2002
Decision issued: Approval with Conditions
-
24 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
South Norfolk granted permission on 13 August 2002, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
North Lodge Wroxham Road Rackheath
Conservatory And Store Shed
Granted Full applications Extension 7 docsSmall domestic -
Rackheath Lodge Wroxham Road Rackheath Norfolk NR13 6LY
T1 - Ash - 16m - remove major deadwood. T2 - Ash - 17m/9m - reduce the crown by 2.5m. T3 - Conifer - 14m - remove and replant with more suited species. T4 - Oak - 16m - fell.
Split decision Trees 3 docs -
Rackheath Lodge Wroxham Road Rackheath Norfolk NR13 6LY
T1 - Ash - 16m - remove major deadwood. T2 - Ash - 17m/9m - reduce the crown by 2.5m. T3 - Conifer - 14m - remove and replant with more suited species. T4 - Oak - 16m - fell.
Split decision Trees 3 docs -
Land At Home Farm Rackheath Park Rackheath NR13 6LP
1) Outline permission for up to 43 dwellings and 2) Change of use of land for public open space & connecting cycle/pedestrian routes
Refused 100 docsMajor scheme -
Land At Home Farm Rackheath Park Rackheath NR13 6LP
1) Outline permission for up to 43 dwellings and 2) Change of use of land for public open space & connecting cycle/pedestrian routes
Refused 100 docsMajor scheme -
Hill Farm Lodge Wroxham Road Rackheath NR13 6NE
Detached cart lodge style garage
Granted Householder 7 docsDomestic
Other full applications
In South Norfolk
-
2026/2068 Granted
Jack In The Box Nursery Hempnall Road Morningthorpe Norfolk NR15 2LL
Retrospective planning application for the installation of external lighting
-
2025/2954 Granted
Land On The Junction Of Sunnyside And Chapel Hill Woodton Norfolk
Erection of one detached self-build dwelling with associated access, parking, garage, garden space, landscaping, sustainable drainage and biodiversity enhancements
-
2026/1236 Granted
Petrol Filling Station Morrisons Victoria Road Diss Norfolk
Extension to the existing petrol filling station's sales building for the creation of hot food takeaway, installation of kitchen extraction equipment, new bin store, demolition of the existing jet wash and car wash and associated forecourt works.
-
2026/2055 Granted
Worlds End Norwich Road Mulbarton Norfolk NR14 8JT
Proposed Replacement Covered Beer Garden and Alterations to Existing Function Room
-
2026/1870 Granted
Cherry Tree Court Diss Norfolk
Installation of solar powered bollard lighting