Skip to content
PlanIndex Get alerts
Menu

Planning application

East Kilbride 275kV Grid Substation Cairnmuir Road East Kilbride Glasgow South Lanarkshire

Awaiting decision South Lanarkshire P/26/0892 Detailed planning application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of 33kv switchgear within GPR housing

As published by the council, reference P/26/0892

Application record

Reference
P/26/0892
Type
Detailed planning application
Status
Registered
Received
16 Jul 2026
Validated
18 Aug 2026
Ward
09 East Kilbride West
Decision by
Delegated
Postcode
G76 9EU

Timeline

Dates from the published record

  1. 16 Jul 2026

    Received by South Lanarkshire

  2. 18 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 18 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 13 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    South Lanarkshire took a median of 69 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

  • Location plan Drawing · 18 Aug 2026
  • Switchgear housing elevations Drawing · 18 Aug 2026
  • Proposed elevations Drawing · 06 Aug 2026
  • Location plan Drawing · 06 Aug 2026
  • Block plan Drawing · 06 Aug 2026
  • Existing site layout Drawing · 06 Aug 2026
  • Proposed site layout Drawing · 06 Aug 2026
  • Existing elevations Drawing · 06 Aug 2026
  • Existing elevations Drawing · 06 Aug 2026
  • Proposed cross-sections Drawing · 06 Aug 2026
  • Application pdf Application Form · 06 Aug 2026
  • Application pdf Application Form · 16 Jul 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with South Lanarkshire for determination, against a statutory target of eight weeks. Over the last year South Lanarkshire decided full applications in a median of 113 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In South Lanarkshire

  • P/26/1132 Awaiting decision

    Asanti House 4 Lister Way Hamilton International Tech Park Blantyre G72 0FT

    Erection of 2m and 2,4m (h) fencing, formation of fire tender road access, erection of plant compound, removal of bin storage and associated alterations

    Received 1 Sep, published by the council 25 Sep 2026 Full applications
  • P/26/1087 Awaiting decision

    Thankerton Hall 49 Station Road Thankerton Biggar ML12 6NZ

    Demolition of rear extensions. Erection of single-story rear extension, associated access ramp, formation of car park and additional access, and associated alterations

    Received 24 Aug, published by the council 3 Sep 2026 Full applications
  • P/26/1098 Awaiting decision

    45 Carlisle Road Birkenshaw Larkhall ML9 2TP

    Sub-division of garden ground and erection of dwellinghouse

    Received 24 Aug, published by the council 1 Sep 2026 Full applications
  • P/26/1085 Awaiting decision

    Fallburn Toll House A73 From Symington A72 To Hyndford Bridge Thankerton Biggar ML12 6PD

    Erection of Agricultural Shed

    Received 21 Aug, published by the council 7 Sep 2026 Full applications
  • P/26/1078 Awaiting decision

    St Brides Centre Braehead Douglas Lanark ML11 0PT

    Erection of single storey workshop to accomodate Douglas Valley Mens Shed

    Received 20 Aug, published by the council 1 Sep 2026 Full applications