Skip to content
PlanIndex Get alerts
Menu

Planning application

Junction Of Anderson Drive Chapelton Strathaven ML10 6GH

Awaiting decision South Lanarkshire P/26/0422 Detailed planning application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of 5 dwellings with access and associated works

As published by the council, reference P/26/0422

Application record

Reference
P/26/0422
Type
Detailed planning application
Status
Registered
Received
2 Apr 2026
Validated
28 Apr 2026
Ward
05 Avondale And Stonehouse
Parish
Auldhouse Chapelton Community Council
Decision by
Delegated
Postcode
ML10 6GH

Timeline

Dates from the published record

  1. 2 Apr 2026

    Received by South Lanarkshire

  2. 28 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 23 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    South Lanarkshire took a median of 67 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

  • Housetype 2 general arrangement and elevations Drawing · 12 Jun 2026
  • Drainage layout Drawing · 12 Jun 2026
  • Application pdf Application Form · 12 Jun 2026
  • Consultation response from scottish water Consultation Response · 06 May 2026
  • Application form Application Form · 30 Apr 2026
  • Location plan Drawing · 27 Apr 2026
  • Proposed site layout Drawing · 27 Apr 2026
  • House type 1 general arrangment and elevations Drawing · 27 Apr 2026
  • Existing site layout Drawing · 27 Apr 2026
  • Housetype 1 & 2 general arrangement and elevations Superseded drawing · 02 Apr 2026
  • Levels and road long sections Drawing · 02 Apr 2026
  • Vehicle swept path Drawing · 02 Apr 2026
  • Design statement Other · 02 Apr 2026
  • Application pdf Application Form · 02 Apr 2026
  • Storm drainage calculations from flow Other · 02 Apr 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with South Lanarkshire for determination, against a statutory target of eight weeks. Over the last year South Lanarkshire decided full applications in a median of 97 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In South Lanarkshire

  • P/25/0942 Granted

    Malcolmwood Farm Loanend Road Blantyre G72 9UL

    Construction of Battery Energy Storage System (and associated infrastructure) with generating capacity of 49.5MW on land at Malcolm Wood Farm, Blantyre.

    12 Aug 2025 Full applications
  • P/26/0430 Refused

    Eastford B7016 From Forth A706 To Carnwath A70 Forth ML11 8ET

    Erection of dwellinghouse

    6 Apr 2026 Full applications
  • P/26/0321 Refused

    Dunsmore Brothers Burnhead Road Larkhall ML9 3AB

    Change of use of open space to yard space

    12 Mar 2026 Full applications
  • P/25/0825 Granted

    Thistle Seafoods Goldie Road Bothwell Park Industrial Estate Uddingston G71 6LS

    Erection of side and rear extensions to existing manufacturing and distribution facility including installation of noise barrier, formation of vehicular turning areas, reconfiguration of car park and associated works

    11 Jul 2025 Full applications
  • P/26/0440 Granted

    34 Old Mill Road Uddingston G71 7HH

    Extension to third floor over flat roof area

    8 Apr 2026 Full applications