Skip to content
PlanIndex Get alerts
Menu

Planning application

99 Carlisle Road Stonehouse ML9 3PN

Awaiting decision South Lanarkshire P/26/0228 Detailed planning application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Formation of residential caravan park and associated works (part-retrospective)

As published by the council, reference P/26/0228

Application record

Reference
P/26/0228
Type
Detailed planning application
Status
Registered
Received
20 Feb 2026
Validated
20 Feb 2026
Ward
20 Larkhall
Decision by
Delegated
Postcode
ML9 3PN

Timeline

Dates from the published record

  1. 20 Feb 2026

    Received by South Lanarkshire

  2. 28 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 17 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    South Lanarkshire took a median of 67 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

A1 Architectural Design Ltd Agent, an architecture practice

Active · incorporated 2007

55 applications on PlanIndex · across 6 councils · 96% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

  • Hamilton advertiser Advert · 26 Mar 2026
  • Proposed full site plan Drawing · 20 Feb 2026
  • Proposed north site plan Drawing · 20 Feb 2026
  • Proposed south site plan Drawing · 20 Feb 2026
  • Static caravan(s) Drawing · 20 Feb 2026
  • Amenity building Drawing · 20 Feb 2026
  • Site entrance plans Drawing · 20 Feb 2026
  • Location plan Drawing · 20 Feb 2026
  • Application pdf Application Form · 20 Feb 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with South Lanarkshire for determination, against a statutory target of eight weeks. Over the last year South Lanarkshire decided full applications in a median of 97 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In South Lanarkshire

  • P/25/0942 Granted

    Malcolmwood Farm Loanend Road Blantyre G72 9UL

    Construction of Battery Energy Storage System (and associated infrastructure) with generating capacity of 49.5MW on land at Malcolm Wood Farm, Blantyre.

    12 Aug 2025 Full applications
  • P/26/0430 Refused

    Eastford B7016 From Forth A706 To Carnwath A70 Forth ML11 8ET

    Erection of dwellinghouse

    6 Apr 2026 Full applications
  • P/26/0321 Refused

    Dunsmore Brothers Burnhead Road Larkhall ML9 3AB

    Change of use of open space to yard space

    12 Mar 2026 Full applications
  • P/25/0825 Granted

    Thistle Seafoods Goldie Road Bothwell Park Industrial Estate Uddingston G71 6LS

    Erection of side and rear extensions to existing manufacturing and distribution facility including installation of noise barrier, formation of vehicular turning areas, reconfiguration of car park and associated works

    11 Jul 2025 Full applications
  • P/26/0440 Granted

    34 Old Mill Road Uddingston G71 7HH

    Extension to third floor over flat roof area

    8 Apr 2026 Full applications