Planning application
Centre West Development Site Rothesay Street East Kilbride G74 1LL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Redevelopment of town-centre land to provide a residential-led mixed use development including ancillary retail, professional services and healthcare (Class 1A), food and drink (Class 3), business (Class 4), non-residential institutions (Class 10), assembly and leisure (Class 11) floorspace with new public realm and associated landscaping, car parking, access and servicing arrangements, infrastructure, and ancillary works (Planning Permission in Principle)
As published by the council, reference P/25/1387
Application record
- Reference
- P/25/1387
- Type
- Permission in principle
- Status
- Awaiting decision
- Received
- 21 Nov 2025
- Validated
- 3 Dec 2025
- Ward
- 08 East Kilbride Central North
- Decision by
- Planning committee
- Postcode
- G74 1LL
Timeline
Dates from the published record
-
21 Nov 2025
Received by South Lanarkshire
-
3 Dec 2025
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 28 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
South Lanarkshire took a median of 67 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Savills (UK) Ltd Agent, registered in London
Active · incorporated 1991 · London
929 applications on PlanIndex · across 135 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordSouth Lanarkshire Council Applicant
21 applications on PlanIndex · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
48 documents on file for this application
- Committee report
- Delineation of residential and civic zones
- Consultation response - wosas
- Consultation response - transport scotland
- Socio economic assessment
- Consultation response - east mains community council
- Consultation response - spt
- Published advert - east kibride
- Consultation response - scottish water
- Consultation response - sp energy network
- Design and access statement part 3
- Design and access statement part 4
- Accessibility and movement plan
- Block plan as existing
- Block plan as proposed
- Design and access statement - part 1
- Design and access statement - part 2
- Illustrative ground floor masterplan
- Illustrative roof level masterplan
- Illustrative typical upper level masterplan
- Maximum horizontal limit of deviation plan
- Maximum vertical limit of deviation plan
- Application pdf
- Site plan as existing
- Site plan as proposed
- Flood risk assessment
- Application form
- Air quality assessment
- Community benefit statement
- Design code
- Drainage strategy
- Energy strategy assessment
- Geo environmental report part 1
- Geo environmental report part 2
- Geo environmental report part 3
- Illustrative site sections elevations
- Maximum parameters of buildings
- Pac report
- Pac report appendix 1-5
- Pac report appendix 6 - part 1
- Pac report appendix 6 - part 2
- Pac report appendix 7 - part 1
- Pac report appendix 7 - part 2
- Planning statement
- Site sections as existing
- Transport assessment part 1
- Transport assessment part 2
- Utility review
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with South Lanarkshire for determination, against a statutory target of eight weeks. Over the last year South Lanarkshire decided outline applications in a median of 96 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Eurochange 300 Centre West East Kilbride G74 1LL
Display of 4 fascia signs and erection and display of a (1200mm high x 592mm wide) digital advertisement hoarding
Granted Advertising 6 docs -
East Kilbride Shopping Centre Churchill Avenue East Kilbride
Erection and display of seven large format vinyl advertisements
Granted Advertising 10 docs -
Kiosk 2 16 The Plaza East Kilbride G74 1LW
Alterations to existing shop front and associated works
Granted Full applications Windows or glazing 9 docs -
23 Headhouse Green East Kilbride G75 0BY
Removal of existing conservatory and erection of single storey side and front extension.
Granted Extension 11 docsSmall domestic -
53 The Plaza East Kilbride G74 1LW
Change of use of retail unit (Class 1A) to dance/music studio (Class 11) with associated works
Granted Full applications 6 docs -
Carnegie Hill East Kilbride G75 0AH
Installation of electrical substation and associated infrastructure for residential development
Granted New dwelling 6 docs
Other outline applications
In South Lanarkshire
-
P/26/0293 Refused
Hollybank Biggar Road Carnwath Lanark ML11 8LU
Erection of dwellinghouse and associated works (Planning Permission in Principle)
-
P/26/0501 Withdrawn
51 Brownside Road Cambuslang G72 8AG
Sub-division of garden ground, erection of dwellinghouse and formation access (Planning Permission in Principle)
-
P/26/0338 Granted
Land Adjacent To 95 Carlise Road Abington Biggar ML12 6SD
Erection of dwellinghouse, formation of access and associated works (planning permission in principle)
-
P/26/0323 Granted
Land To North Of Whistleberry Road Blantyre ML3 0HP
Residential development with associated infrastructure, roads and landscaping (Screening Opinion request)
-
P/25/0915 Granted
Yard - Behind 25 And 27 Ayr Road Shawsburn Larkhall South Lanarkshire
Erection of residential development, formation of access and associated works (Planning Permission in Principle)