Skip to content
PlanIndex Get alerts
Menu

Planning application

The Church Barn 6 East End Langtoft Lincolnshire PE6 9LP

Awaiting decision South Kesteven S26/1537 Listed Building Consent

Works: Loft or dormer

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Re-roofing works, replacement of existing rooflights, installation of one additional rooflight, removal of a wood-burner flue and installation of a boiler flue.

As published by the council, reference S26/1537

Application record

Reference
S26/1537
Type
Listed Building Consent
Status
Awaiting decision
Received
4 Sep 2026
Validated
4 Sep 2026
Ward
Casewick Ward
Parish
Langtoft Parish Council
Postcode
PE6 9LP

Timeline

Dates from the published record

  1. 4 Sep 2026

    Received by South Kesteven

  2. 29 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 30 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    South Kesteven took a median of 64 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Ashman Architects Ltd Agent, an architecture practice registered in Peterborough

Active · incorporated 2015 · Peterborough

25 applications on PlanIndex · across 9 councils · 89% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with South Kesteven for determination, against a statutory target of eight weeks. Over the last year South Kesteven decided heritage and listed building applications in a median of 71 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In South Kesteven

  • S26/1384 Granted

    Park House 6 Manor Drive Harlaxton Lincolnshire NG32 1HU

    Replacement of 2 softwood painted Non-Historic windows, plus the repair of 1 metal framed, diamond light, stone surround window consisting of 1 fixed light and 1 horizontal central pivoting light. Work involves the removal of the front face of the central mullion to release the frames and its replacement in new stone to match following lights refurbishment and refitting.

    Received 14 Aug, published by the council 6 Sep 2026 Heritage and listed buildings
  • S26/1024 Granted

    56 High Street Stamford Lincolnshire PE9 2AW

    New decorations to external shopfront and building facade. New aperture within existing internal wall to allow access to staircase. Removal of floorboards and ceilings to create opening to internal entrance area.

    Received 15 Jun, published by the council 22 Jul 2026 Heritage and listed buildings
  • S26/0954 Withdrawn

    4A Ironmonger Street Stamford Lincolnshire PE9 1PL

    Change of use to first and second floor commercial area to residential dwelling.

    Received 2 Jun, published by the council 26 Jul 2026 Heritage and listed buildings
  • S26/1263 Granted

    The Old School Corby Road Irnham Lincolnshire NG33 4JB

    Change of use of offices to dwelling

    Received 23 Jul, published by the council 18 Aug 2026 Heritage and listed buildings
  • S26/1214 Granted

    Old Smithy 12 Church Street Corby Glen Lincolnshire NG33 4NJ

    Replacement of french doors to ground floor rear elevation.

    Received 15 Jul, published by the council 27 Aug 2026 Heritage and listed buildings