Planning application
The Church Of St John The Baptist Church Lane Londonthorpe Lincolnshire NG31 9RU
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of a new resin gravel footpath to provide level access into the church through the north door (no steps) and resurfacing of the existing concrete patch with resin gravel. Installation of a trench arch drainage system for the accessible toilet.
As published by the council, reference S26/1316
Application record
- Reference
- S26/1316
- Type
- Full Planning Permission
- Status
- Awaiting decision
- Received
- 3 Aug 2026
- Validated
- 3 Aug 2026
- Ward
- Belmont Ward
- Parish
- Londonthorpe & Harrowby Without Parish C
- Postcode
- NG31 9RU
Comment by 12 September 2026
The council is taking comments on this application until then. Have your say on South Kesteven's portal.
Timeline
Dates from the published record
-
3 Aug 2026
Received by South Kesteven
-
27 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 28 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
South Kesteven took a median of 65 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Worksop
14 applications on PlanIndex · across 7 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with South Kesteven for determination, against a statutory target of eight weeks. Over the last year South Kesteven decided full applications in a median of 117 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
1 High Road Londonthorpe Lincolnshire NG31 9RU
T1 - to reduce limb navy by 3m to clear border on horse chestnut tree
Granted Trees 6 docs -
21 High Road Londonthorpe Lincolnshire NG31 9RU
Rebuild dilapidated chimney stack.
Granted Householder 11 docsDomestic -
21 High Road Londonthorpe Lincolnshire NG31 9RU
Rebuild dilapidated chimney stack.
Granted Heritage and listed buildings 12 docs -
Park House 12 Newgate Lane Londonthorpe Lincolnshire NG31 9RY
Change of use of domestic outbuilding to create holiday let.
Granted Full applications 10 docs -
Holly Bank Cottage 14 Newgate Lane Londonthorpe NG31 9RY
14 NL - To remove 1no Lawson Cypress tree
Granted Trees 5 docs
Other full applications
In South Kesteven
-
S26/0771 Refused
Land East Of 51 Towngate East Market Deeping Lincolnshire PE6 8DR
Erection of bungalow and industrial units
-
S26/1103 Granted
The Bath House 16 Bath Row Stamford Lincolnshire PE9 2QU
Change of use from office to residential dwelling
-
S26/1019 Refused
3 Red Lion Street Stamford Lincolnshire PE9 1PA
Retrospective Application for the Painting of Front Facade
-
S26/0630 Granted
53 Grantley Street Grantham Lincolnshire NG31 6BW
Change of use of from residential garden (C3) to mixed use of residential (C3) and commercial (B8) for garages and formation of new access
-
S26/1000 Granted
Little Farm 83 Station Street Rippingale Lincolnshire PE10 0SX
Section 73 application to vary condition 2 (approved plans) of S25/1476 (Residential development of two detached dwellings)