Skip to content
PlanIndex Get alerts
Menu

Planning application

Red Lion Inn 14 South Street Bourne Lincolnshire PE10 9LT

Awaiting decision South Kesteven S26/0453 Full Planning Permission (Major)

Works: New dwelling Demolition Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use of part of Red Lion Public House to form 3 dwellings and development at rear to form 15 new dwellings (including demolition of outbuildings).

As published by the council, reference S26/0453

Application record

Reference
S26/0453
Type
Full Planning Permission (Major)
Status
Awaiting decision
Received
16 Mar 2026
Validated
16 Mar 2026
Ward
Bourne East Ward
Parish
Bourne Town Council
Postcode
PE10 9LT

Timeline

Dates from the published record

  1. 16 Mar 2026

    Received by South Kesteven

  2. 22 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 15 June 2026, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.

    South Kesteven took a median of 64 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Plan-It Design Ltd Agent, a design practice registered in Newark

Active · incorporated 1998 · Newark

106 applications on PlanIndex · across 19 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

60 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with South Kesteven for determination, against a statutory target of thirteen weeks. Over the last year South Kesteven decided full applications in a median of 115 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 2 Abbey Road Bourne Lincolnshire PE10 9EF

    S26/0028 Submitted 30 Dec 2025 50 yards away

    Submission of Details in relation to Condition 3 (Joinery details) of planning permission S25/1505 - Change of use of part of public house (Sui generis) to commercial unit (Class E) including alterations to existing window to provide door.

    Granted Conditions Windows or glazing 6 docs
  • 18 Abbey Road Bourne PE10 9EF

    S21/0724 Submitted 12 Apr 2021 50 yards away

    Change of use from B8 to a Community Based Dance School Business.

    Granted Full applications 16 docs
  • 18 Abbey Road Bourne Lincolnshire PE10 9LX

    S21/1337 Submitted 1 Jul 2021 50 yards away

    LED Illuminated Signage

    Granted Advertising 7 docs
  • The Cedars Church Walk Bourne Lincolnshire PE10 9UQ

    S26/0408 Submitted 9 Mar 2026 50 yards away

    Section 211 notice to as per EAS tree pruning standard, crown reduction of one beech tree by approx. 1.5m in height and spread (marked red).

    Granted Trees 4 docs
  • The Cedars Church Walk Bourne PE10 9UQ

    S21/1706 Submitted 27 Aug 2021 100 yards away

    Yew (T11) - Reduce lateral branch from sub-dominant limb overhanging main footpath into care home by a maximum of 2 metres, leaving a limb length of 4 metres, due to decay on topside of limb from 350mm up to 1 metre above ground level. Limb is at risk of failing over footpath as the decay progresses

    Granted Trees 12 docs
  • The Town Hall Market Place North Street Bourne Lincolnshire PE10 9EA

    S26/1598 Submitted 16 Sep 2026 100 yards away

    95% historically approved · decision due ~11 Nov

    Addition of swift bricks to rear elevation of C20 extension.

    Awaiting decision Heritage and listed buildings Extension 4 docs

In South Kesteven

  • S26/0591 Granted

    Former Salvation Army Hall East Street Stamford

    Erection of four dwellings.

    Received 3 Apr, published by the council 22 Jul 2026 Full applications
  • S26/0417 Refused

    Birchwood Nursing Home 6 Dudley Road Grantham Lincolnshire NG31 9AA

    Change of use of Care Home (Use Class C2) to 2no. Houses of Multiple Occupation (Sui Generis) with associated installation of hardstanding, cycle storage and bin storage

    Received 10 Mar, published by the council 22 Jul 2026 Full applications
  • S26/0268 Granted

    13 East Street Rippingale Lincolnshire PE10 0SS

    Engineering works for constructing a retaining wall

    Received 13 Feb, published by the council 22 Jul 2026 Full applications
  • S26/1374 Granted

    Ticket Office Station Road Little Bytham Lincolnshire NG33 4RA

    Change of use of single storey railway building (The Old Ticket Office) to 2 storey dwelling.

    Received 12 Aug, published by the council 6 Sep 2026 Full applications
  • S26/1305 Granted

    40 The Crescent Allington Gardens Allington Lincolnshire NG32 2DR

    Proposed erection of pre fabricated single garage

    Received 30 Jul, published by the council 14 Aug 2026 Full applications