Proposal
Non-material amendment to the conditions of the deemed planning permission associated with the Section 36 consent for the construction and operation of an electricity generating station of up to 945MW (H16-0835-17). Amendments to condition 1 (definitions), condition 6 (removal and/or reprofiling of the Mound), conditions 21 & 22 (construction traffic management plan & access route), condition 43 (biodiversity enhancement measures and condition 45 (surface water drainage) in order to allow for removal and/or reprofiling of the mound as part of the permitted preliminary works and to omit the permitted preliminary works from triggering certain requirements under conditions that would be more appropriately dealt with as part of future development proposals.
As published by the council, reference H16-0847-21
Application record
- Reference
- H16-0847-21
- Type
- NON MAT AMENDMENT
- Status
- Approved
- Decision
- Permitted
- Received
- 9 Aug 2021
- Validated
- 9 Aug 2021
- Decided
- 3 Sep 2021
- Parish
- Spalding
- Postcode
- PE11 2BB
Timeline
Dates from the published record
-
9 Aug 2021
Received by South Holland
-
3 Sep 2021
Decision issued: Permitted
-
28 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
South Holland granted permission on 3 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
BAKKAVOR WEST MARSH ROAD SPALDING PE11 2BB
Two portable cold stores and connecting lobbies
Granted Lawful development 8 docs -
FOWLER WELCH LTD WEST MARSH ROAD SPALDING PE11 2BB
The erection of a vehicle maintenance unit (VMU) together with associated external hard-standing, footpath, staircase and lighting
Granted Full applications 14 docs -
Land off West Marsh Road Spalding PE11 2BB
Proposed LNG Refuelling Station
Withdrawn Full applications 14 docs -
-
Land at Spalding Power Station West Marsh Road Spalding PE11 2BB
82% historically approved · decision due ~28 Aug
Construction and operation of an unmanned Battery Energy Storage System ('BESS') with a power capacity of up to 550 megawatt ('MW') with associated works including control and protection systems, power conversion systems (and associated transformers), temperature regulation systems, a main step-up transformer(s) and switchgear, welfare facilities, electrical cabling and electrical connection, and other associated works - Approved under H16-1327-21. Modification of Conditions 4, 5, 6 & 7 to allow amendments to previously approved/submitted plans
Decided -
1-3 Ashtree Lane Off Stumps Lane Spalding PE12 6HB
Change of Use (part retrospective) to retain materials recovery facility
Granted Other 14 docs
Other amendment applications
In South Holland
-
H18-0647-26 Refused
Poppy Fields Caravan Park Fields Farm South Sutton Bridge Spalding PE12 9XT
Use of site as site for caravans for seasonal workers and its retention out of season for storage of caravans - approved under H18-0224-18. Modification of Condition 2 to allow amended wording of condition.
-
H16-0821-26 Decided
Units 1 & 2 Fulney Lane North Spalding PE12 6EP
Erection of two single drive thru units with associated car parking, cycle parking, landscaping and access - approved under H16-0079-25. Amendments to include update of bridleway & associated landscaping to PWoW Officers comments & minor change of cladding colour to Unit 2.
-
H17-0795-26 Decided
28 WOODS LANE SURFLEET SPALDING PE11 4AN
Retention of dwelling without complying with agricultural habitation clause (Condition 2 of H17-0432-97)
-
H16-0782-26 Decided
78 Pinchbeck Road Spalding PE11 1QF
Change of use from Residential (C3) to Hotel (C1) - Approved under H16-0227-24. Modification of Condition 2 to allow amendments to previously approved plans
-
H13-0778-26 Awaiting decision
Rear of 24 Broad Lane Moulton Spalding PE12 6PN
Proposed erection of two 1.5 storey detached dwellings with attached garages, vehicular access and landscaping - Approved under H13-0981-24. Amendments to Plot 1 to remove bedroom 2 window on the rear gable, reduced ridge height of the roof above the living room & installation of 2 velux windows to the south elevation serving bed 2