Skip to content
PlanIndex Get alerts
Menu

Planning application

FOWLER WELCH LTD WEST MARSH ROAD SPALDING PE11 2BB

Granted South Holland H16-0702-18 FULL

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

The erection of a vehicle maintenance unit (VMU) together with associated external hard-standing, footpath, staircase and lighting

As published by the council, reference H16-0702-18

Application record

Reference
H16-0702-18
Type
FULL
Status
Approved
Decision
Permitted
Received
12 Jul 2018
Validated
23 Jul 2018
Decided
29 Aug 2018
Parish
Spalding
Postcode
PE11 2BB

Timeline

Dates from the published record

  1. 12 Jul 2018

    Received by South Holland

  2. 23 Jul 2018

    Validated

    Checked as complete and ready for consideration.

  3. 29 Aug 2018

    Decision issued: Permitted

  4. 17 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

South Holland granted permission on 29 August 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • BAKKAVOR WEST MARSH ROAD SPALDING PE11 2BB

    H16-0142-20 Submitted 14 Feb 2020 0m away

    Two portable cold stores and connecting lobbies

    Granted Lawful development 8 docs
  • Spalding Energy Expansion Site West Marsh Road Spalding PE11 2BB

    H16-0847-21 Submitted 9 Aug 2021 0m away

    Non-material amendment to the conditions of the deemed planning permission associated with the Section 36 consent for the construction and operation of an electricity generating station of up to 945MW (H16-0835-17). Amendments to condition 1 (definitions), condition 6 (removal and/or reprofiling of the Mound), conditions 21 & 22 (construction traffic management plan & access route), condition 43 (biodiversity enhancement measures and condition 45 (surface water drainage) in order to allow for removal and/or reprofiling of the mound as part of the permitted preliminary works and to omit the permitted preliminary works from triggering certain requirements under conditions that would be more appropriately dealt with as part of future development proposals.

    Granted Amendments 6 docs
  • Land off West Marsh Road Spalding PE11 2BB

    H16-0233-26 Submitted 11 Mar 2026 0m away

    Proposed LNG Refuelling Station

    Withdrawn Full applications 14 docs
  • Land off West Marsh Road Spalding PE11 2BB

    H16-0234-26 Submitted 11 Mar 2026 0m away

    Proposed LNG Refuelling Station

    Granted Other 21 docs
  • Land at Spalding Power Station West Marsh Road Spalding PE11 2BB

    H16-0622-26 Submitted 3 Jul 2026 0m away

    82% historically approved · decision due ~28 Aug

    Construction and operation of an unmanned Battery Energy Storage System ('BESS') with a power capacity of up to 550 megawatt ('MW') with associated works including control and protection systems, power conversion systems (and associated transformers), temperature regulation systems, a main step-up transformer(s) and switchgear, welfare facilities, electrical cabling and electrical connection, and other associated works - Approved under H16-1327-21. Modification of Conditions 4, 5, 6 & 7 to allow amendments to previously approved/submitted plans

    Decided
  • 1-3 Ashtree Lane Off Stumps Lane Spalding PE12 6HB

    H16-0546-20 Submitted 9 Jul 2020 417m away

    Change of Use (part retrospective) to retain materials recovery facility

    Granted Other 14 docs

In South Holland

  • H17-0837-26 Awaiting decision

    POLLEN HOUSE 39 COALBEACH LANE SOUTH SURFLEET PE11 4BL

    Proposed Garage & Log Store

    3 Sep 2026 Full applications
  • H17-0582-26 Granted

    82 Seas End Road Surfleet Spalding Lincolnshire PE11 4DQ

    Change of use from agricultural land to commercial staff parking & BNG area including demolition of 2 no. lean-to buildings to the side & rear - Part Retrospective

    18 Jun 2026 Full applications
  • H23-0839-26 Awaiting decision

    Hither Hold Farm Further Old Gate Whaplode PE12 6SU

    Demolition of existing barn & erection of a new dwelling

    3 Sep 2026 Full applications
  • H13-0828-26 Decided

    5 EAST COB GATE MOULTON SPALDING PE12 6QL

    Proposed Detached Double Garage

    1 Sep 2026 Full applications
  • H14-0827-26 Decided

    Milestone Nurseries Herdgate Lane Pinchbeck PE11 3UP

    Proposed double storey side and rear extensions and demolition of front hip end element

    1 Sep 2026 Full applications