Planning application
Land East of Normanton Road Crowland
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details of Construction Management Plan & Method Statement, Estate Road Phasing & Completion Plan and details of installation of fire hydrants (Conditions 14, 17 & 29 of H02-0759-25)
As published by the council, reference H02-0832-26
Application record
- Reference
- H02-0832-26
- Type
- CONDITION COMPLIANCE
- Status
- Undecided
- Received
- 2 Sep 2026
- Validated
- 2 Sep 2026
- Parish
- Crowland
Site history
Applications at this address on the South Holland register
This site has had 5 applications since 2025: 2 approved, 0 refused.
-
H02-0829-26 Granted
Land East of Normanton Road Crowland
Details of written scheme of archaeological investigation (Condition 19 of H02-0759-25)
-
H02-0830-26 Awaiting decision
Land East of Normanton Road Crowland
Details of surface water drainage scheme and details of means of foul and water disposal (Conditions 12 & 13 of H02-0759-25)
-
H02-0831-26 Awaiting decision
Land East of Normanton Road Crowland
Details of boundary treatments, equipped childrens play area including timing of implementation, location, detailed design, layout, specification of equipment and management & maintenance regime, plan illustrating all areas publicly accessible open space etc, timetable of hard landscaping, management & maintenance schedule for areas of landscaping, refuse/recycling collection points & parking courts/private drives, BNG Plan, HMMP, ecological survey and details of design & position of external meter boxes etc (Conditions 6, 7, 8, 10, 11, 22, 23, 25 and 28 of H02-0759-25)
-
H02-0759-25 Granted
Land East of Normanton Road Crowland
Development for 80 dwellings with access, landscape, drainage, open space and associated infrastructure
Timeline
Dates from the published record
-
2 Sep 2026
Received by South Holland
-
4 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 28 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
South Holland took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Allison Homes Ltd Fleet House Cygnet Road Hampton Peterborough PE7 8FD Agent and applicant, a developer
10 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordWhat happens while it is decided
This application is with South Holland for determination, against a statutory target of eight weeks. Over the last year South Holland decided condition discharge and variation applications in a median of 51 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In South Holland
-
H09-1037-26 Awaiting decision
41 & 43 Hallgate Holbeach Spalding PE12 7JA
Details of Construction Management Plan, Method Statement and proposed soakaway system (Conditions 6 and 8 of H09-0818-26)
-
H23-1036-26 Awaiting decision
Newgate Hockney Hole Lane Whaplode PE12 6TH
Details of existing & proposed site levels and proposed floor levels and hard surfaced areas, external lighting, external CCTV cameras, BNG Gain Plan & Biodiversity Management Plan and proposed soakaway system for the disposal of surface water (Conditions 4, 7, 8, 15 & 16 of H23-0921-23)
-
H20-1028-26 Awaiting decision
Barn Adjacent to Holly Cottage Old Fen Dike Sutton St James PE12 0HE
Details of landscaping & tree planting, three swift nest bricks, one integrated bat box, contamination of land or pollution of controlled waters, biodiversity gain plan, written 30-year Habitat Management & Maintenance Plan (HMMP) (Conditions 7, 9, 10, 17, 18 & 19 of H20-0645-26)
-
H09-1031-26 Awaiting decision
Lazy Acre Caravan Site Little Dog Drove Holbeach St Johns PE12 8RR
Details of proposed means of foul & surface water disposal, site management plan & external illumination of all buildings & areas of the site including details of luminance and fields of illumination (Conditions 4, 6 & 8 of H09-1284-25)
-
H12-1026-26 Awaiting decision
84 Little London Long Sutton Spalding PE12 9LF
Details of Habitat Management & Monitoring Plan (HMMP) (Condition 10 of H12-0381-26