Planning application
P26/00390/RM
Brabazon Park South Filton South Gloucestershire
Proposal
Laying out of public open space for 'Brabazon Park South' including informal open space, landscaping, sustainable drainage system (SuDs), queuing arrangement for ingress and egress to the YTL Arena and all associated works (Approval of Reserved Matters to be read in conjunction with outline permission P22/02113/O).
As published by the council, reference P26/00390/RM
Timeline
Dates from the published record
-
20 Feb 2026
Received by South Gloucestershire
-
2 Mar 2026
Validated
Checked as complete and ready for consideration.
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with South Gloucestershire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About reserved matters applications
How this application type works
A reserved matters application fills in the detail held back from an earlier outline permission, typically appearance, landscaping, layout, scale or access. The council judges it against the outline permission already granted, not the principle of development, which is settled. It must normally be submitted within three years of the outline decision.
Nearby applications
Within 500 metres
-
P25/01701/F Awaiting decision
Land North And South Of The Henbury Loop Railway Line At The Former Filton Airfield South Gloucestershire
Construction of a new pedestrian bridge linking the former Filton Airfield and the Brabazon Hangar sites over the Henbury Spur railway line, including earthworks and associated development.
-
DOC26/00045 Decided
Former Filton Airfield Filton South Gloucestershire
Discharge of condition 3 (Construction Phase Sediment Management P) attached to planning permission P21/08021/RM Laying out of public open space to include provision of two Local Equipped Areas of Play (LEAP), a Neighbourhood Equipped Area of Play (NEAP), area for Youth Play and a Sports Zone, informal open space, landscaping, water feature/sustainable drainage system (SuD) and all associated works (to be read in conjunction with Outline permission PT14/3867/O).
-
DOC26/00226 Awaiting decision
Former Filton Airfield Filton South Gloucestershire
Discharge of conditions 4 (hard landscaping and furniture schedules), 8 (bollards), 9 (detailed layout of LEAP), 13 (lighting) and 15 (CCTV) attached to planning permission P21/08021/RM. Laying out of public open space to include provision of two Local Equipped Areas of Play (LEAP), a Neighbourhood Equipped Area of Play (NEAP), area for Youth Play and a Sports Zone, informal open space, landscaping, water feature/sustainable drainage system (SuD) and all associated works (to be read in conjunction with Outline permission PT14/3867/O).
-
P25/02431/F Awaiting decision
Land At Brabazon Former Filton Airfield South Gloucestershire
Erection of a padel sports centre and associated works for the temporary period of up to 10 years.
-
P26/01257/NMA Awaiting decision
Former Filton Airfield Filton South Gloucestershire
Non-Material Amendment to planning permission P25/00897/F for the introduction of a DNO building within the interchange red line boundary replacement of approved ceramic cladding with aluminium cladding on the north, south and west elevations; removal of louvres and installation of a continuous acoustic panel to the east elevation and provision of a handrail to the north elevation.
-
DOC26/00180 Decided
Former Filton Airfield Filton South Gloucestershire
Discharge of condition 4 (external facing materials) attached to planning permission P25/00897/F. Erection of eight storey station building to form railway station facilities and café on ground floor and offices above.
Other reserved matters applications
In South Gloucestershire
-
P25/02283/RM Granted
Plot P7, PL35 Land West Of Colark Drive, North Of Dowsell Way Ladden Garden Village Yate
Reserved matters application for the Erection of 1no building to form a nursery and associated works with access, appearance, landscaping, layout and scale to be determined. Approval of reserved matters to be read in conjunction with PK12/1913/O, as amended by P19/6296/RVC, P22/05330/RVC & P23/03529/RVC, for the Mixed use development across 100.76 hectares of land comprising up to 2,450 new dwellings (Use Class C3), extra care housing (Use Class C2), 4.63 hectares of employment land (Use Class B1,B2) provision of a local centre, two primary schools, together with the supporting infrastructure and facilities including: new vehicular and pedestrian accesses, public open space and landscaping and proposal to underground the electricity powerlines. Permission also sought for the discharge of conditions 6, 7, 8, 9, 17, 21, 22, 25, 29, 30 33, 34, 35, 36, 37, 38, 39, 40 and 41 of the operative Outline consent.
-
P26/00135/RM Granted
Land West Of Park Farm Thornbury South Gloucestershire
Erection of 5 no. custom build dwellings with appearance, landscaping, layout, and scale to be determined. (Approval of Reserved Matters to be read in conjunction with outline permission PT18/6450/O).
-
P26/01402/RM Awaiting decision
Former Avlon Works Central Avenue Severn Beach Bristol BS10 7ZE
Erection of new storage and distribution unit (Class B8), with ancillary office space, vehicular, cycle and pedestrian connections, external yard, parking, landscaping and associated works with appearance, landscaping, layout, and scale to be determined. (Approval of Reserved Matters to be read in conjunction with outline permission P25/00232/RVC (formerly P21/06880/F)).
-
P26/01023/RM Awaiting decision
Post Farm Land Off Peacock Road Thornbury BS35 1FF
Erection of 32no dwelling with appearance, landscaping, layout, and scale to be determined. (Approval of Reserved Matters to be read in conjunction with outline permission P23/02091/O Appeal ref APP/P0119/W/24/3348557).
-
P26/01012/RM Awaiting decision
Water Testing Laboratory At Brabazon Land At The Former Filton Runway Filton South Gloucestershire
Erection of four storey Water Testing Laboratory building with parking, landscaping and associated works. Approval of reserved matters for access, appearance, landscaping, layout and scale to be determined (to be read in conjunction with Outline permission P22/02113/O)