Planning application
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Hinkley Point C Connection Project discharge of Requirement 6(1)(b) (Drainage Management Plan), Requirement 17 (Surface Water Drainage), Requirement 19 (Inspection of temporary watercourses) and Requirement 21 (Accumulation and Deposits) for Stage 10.1 of the authorised development
As published by the council, reference DCO/01/R6171921
Application record
- Reference
- DCO/01/R6171921
- Type
- DCO Major Requirements
- Status
- Decided
- Decision
- Granted As published: Discharge of Requirement - Approval
- Received
- 12 Mar 2021
- Validated
- 12 Mar 2021
- Decided
- 6 May 2021
Site history
Applications at this address on the South Gloucestershire register
This site has had 16 applications since 2021: 7 approved, 0 refused.
-
DCO/10/01/R15 Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Hinkley Point C Connection Project - Requirement 15(1) Reinstatement Schemes
-
DCO/10.1/15 Awaiting decision
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal Submission to discharge of Requirement 15 (Reinstatement Scheme) for Stage 10.1 of the authorised development
-
DCO/10.1/10 Awaiting decision
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
-
DCO/10.1/61F Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal Submission to discharge of Requirement 6(1)(f) Emergency Response Plan for Flood Events for Stage 10.1 of the authorised development
-
DCO/10/52B/C Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal Submission to discharge of Requirement 5(2)(b) Biodiversity Mitigation Strategy for Stage 10.1 of the authorised development
-
DCO/32/61I/12/PRE Decided
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Pre-application request for Requirements 6(1)(i) and 12 (Tree and Hedgerow Protection Strategy) for Stage 3.2 of the authorised development.
-
DCO/32/52B/PRE Decided
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Pre-application submission seeking advice on Requirement 5(2)(b) (Biodiversity Mitigation Strategy) addendum for Stage 3.2 of the authorised development
-
DCO/32/61G/PRE Decided
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
HCCP Stage 3.2 Pre-application advice on Requirement 6(1)(G) - Site Waste Management Plan
-
DCO/32/16/PRE Decided
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Pre-application submission seeking advice on Requirement 16 (Fencing and other means of enclosure) for Stage 3.2 of the authorised development
-
DCO/32/61F/PRE Decided
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Pre-application submission seeking advice on Requirement 6(1)(f) (Emergency Response Plan) for Stage 3.2 of the authorised development
Timeline
Dates from the published record
-
12 Mar 2021
Received by South Gloucestershire
-
6 May 2021
Decision issued: Discharge of Requirement - Approval
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
49 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
South Gloucestershire granted permission on 6 May 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In South Gloucestershire
-
P26/01559/F Granted
The Hill 38 Abson Road Pucklechurch South Gloucestershire BS16 9RH
Creation of vehicular access onto classified road (Class C). (retrospective)
-
P25/02431/F Granted
Land At Brabazon Former Filton Airfield South Gloucestershire
Erection of a padel sports centre and associated works for the temporary period of up to 10 years.
-
P25/01664/F Refused
Land At Three Horseshoes Farm High Street Doynton South Gloucestershire
Demolition of existing agricultural buildings and erection of 4no. dwellings with associated works.
-
P26/01692/F Granted
Unit 6 More Plus Central Park Hudson Avenue Severn Beach South Gloucestershire BS35 4EL
Installation of a sprinkler tank, pump house and entrance gate.
-
P26/01603/F Granted
Unit 440 Bristol Business Park Stoke Gifford South Gloucestershire BS16 1EJ
Installation of an external ramp, associated ground infill works to create level access, and installation of 1no. fire escape door on the south-facing elevation.