Planning application
68 South Street Chichester West Sussex PO19 1EE
Works: Loft or dormer
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed conversion of existing first floor level to serve existing residential units at second and third floor level with new entrance/stairway to first floor at rear, proposed dormer at third floor level on rear elevation, and associated works.
As published by the council, reference 25/03075/FUL
Application record
- Reference
- 25/03075/FUL
- Type
- Full Application
- Status
- Pending Consideration
- Received
- 23 Dec 2025
- Validated
- 28 Jan 2026
- Ward
- Chichester Central
- Parish
- Chichester
- Decision by
- Delegated
- Postcode
- PO19 1EE
Timeline
Dates from the published record
-
23 Dec 2025
Received by South Downs National Park
-
28 Jan 2026
Validated
Checked as complete and ready for consideration.
-
10 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 25 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
South Downs National Park took a median of 54 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice
14 applications on PlanIndex · across 4 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with South Downs National Park for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
68 South Street Chichester West Sussex PO19 1EE
98% historically approved · decision due ~9 Mar
Proposed new signage for commercial unit at ground floor level with internal alterations. Proposed conversion of existing first floor level to serve existing residential units at second and third floor level with new entrance/stairway to first floor at rear, proposed dormer at third floor level on rear elevation, and associated works.
Awaiting decision Heritage and listed buildings Loft or dormer 10 docs -
68 South Street Chichester West Sussex PO19 1EE
98% historically approved · decision due ~9 Mar
Proposed new signage for commercial unit at ground floor level with internal alterations. Proposed conversion of existing first floor level to serve existing residential units at second and third floor level with new entrance/stairway to first floor at rear, proposed dormer at third floor level on rear elevation, and associated works.
Awaiting decision Heritage and listed buildings Loft or dormer 10 docs -
68 South Street Chichester West Sussex PO19 1EE
81% historically approved · decision due ~25 Mar
Proposed conversion of existing first floor level to serve existing residential units at second and third floor level with new entrance/stairway to first floor at rear, proposed dormer at third floor level on rear elevation, and associated works.
Awaiting decision Full applications Loft or dormer 12 docs -
68 South Street Chichester West Sussex PO19 1EE
92% historically approved · decision due ~30 Jun
1 no. hand painted fascia sign (non-illuminated).
Awaiting decision Advertising 5 docs -
68 South Street Chichester West Sussex PO19 1EE
92% historically approved · decision due ~30 Jun
1 no. hand painted fascia sign (non-illuminated).
Awaiting decision Advertising 5 docs -
62 - 63 South Street Chichester West Sussex
Conversion of existing part 1st floor and 2nd floor office space into 6 no. flats.
Refused Prior approval New dwelling 30 docsSeveral homes
Other full applications applications
In South Downs National Park
-
SDNP/26/03328/FUL Awaiting decision
Holiday Inn Hotel Winchester Telegraph Way Winchester Hampshire SO21 1HZ
The erection of 10 No. Tesla Supercharger bays, a substation, a battery energy storage unit (megapack), and associated charging infrastructure, operational cabinets, lighting columns, security fencing and ancillary infrastructure including ducts, cables and associated equipment.
-
26/01360/FUL Granted
The Pavilion Connolly Way Chichester West Sussex PO19 6DA
Change loose gravel car park surface to permeable asphalt finish.
-
SDNP/26/03270/FUL Awaiting decision
Lancing College College Drive Lancing West Sussex BN15 0RW
Construction of 2.no 3m x 6m covered spectator stands
-
26/01333/FUL Granted
44 Woodfield Close Tangmere Chichester West Sussex PO20 2FL
Replacement of rear conservatory roof, windows and doors. New replacement window and door to existing porch
-
SDNP/26/03178/FUL Awaiting decision
Twyford Methodist Church The Drove Twyford Hampshire SO21 1QL
Change of use from a Church to a 2 bed dwelling. Insertion of rooflights.