Planning application
Waterbeach Barracks And Airfield, Key Phase 1, Parcels 6.1, 6.2, 7.1, 7.2.
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Reserved matters approval (appearance, access, landscaping, layout and scale) for the development of four blocks comprising 387 Build to Rent (BtR) dwellings with associated resident amenity areas (Use Class C3) and 482 sq.m (GEA) of flexible commercial floorspace (Use Class E), areas of open space and public realm including a Lakeside Promenade and Civic Plaza, cycle storage, waste storage and substation buildings and all associated infrastructure including: access junctions, access/internal roads, parking, utilities infrastructure including alignment of service runs, foul and surface water drainage infrastructure, roof mounted solar panels, green roofs, street lighting, external hard landscaping, soft landscaping and planting, ecological mitigation, footways / cycleways, car and cycle parking, boundary treatments, street furniture, lake-edge engineering works, any necessary temporary stockpiling of construction materials, areas for construction use, land reprofiling, temporary haul routes and any necessary demolition at Parcels 6.1, 6.2, 7.1 and 7.2 at Key Phase 1 of the Waterbeach Barracks and Airfield development pursuant to Condition 3 of the outline planning consent ref: S/0559/17/OL (Environmental Impact Assessment application with Environmental Statement)
As published by the council, reference 26/02870/REM
Application record
- Reference
- 26/02870/REM
- Type
- Approval of Reserved Matters
- Status
- Awaiting decision
- Received
- 29 Jul 2026
- Validated
- 29 Jul 2026
- Ward
- Milton & Waterbeach
- Parish
- Waterbeach CP
Timeline
Dates from the published record
-
29 Jul 2026
Received by South Cambridgeshire
-
2 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
South Cambridgeshire took a median of 62 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: S/0559/17/OL (Decided)
Who's behind it
Company information only, from the register and Companies House
David Lock Associates Ltd Agent, registered in Milton Keynes
Active · incorporated 1989 · Milton Keynes
351 applications on PlanIndex · across 34 councils · 99% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
124 documents on file for this application
- ECOLOGY
- CAMCYCLE
- SUSTAINABILITY
- LLFA
- LOCAL HIGHWAY AUTHORITY
- WASTE - SHARED SERVICE
- WASTE - SHARED SERVICE
- ACKNOWLEDGEMENT LETTER
- SITE NOTICE
- SITE NOTICE
- SITE NOTICE
- SITE NOTICE
- FEE CALCULATION
- APPLICATION FORM - NO PERSONAL INFO
- ATTACHMENT SUMMARY FROM PORTAL
- SITE LOCATION PLAN
- SITE BLOCK PLAN
- GENERAL ARRANGEMENT PLAN GROUND FLOOR LEVEL
- GENERAL ARRANGEMENT PLAN LEVEL 01
- GENERAL ARRANGEMENT PLAN LEVEL 02
- GENERAL ARRANGEMENT PLAN LEVEL 03
- GENERAL ARRANGEMENT PLAN LEVEL 04
- GENERAL ARRANGEMENT PLAN LEVEL 05
- GENERAL ARRANGEMENT PLAN LEVEL 06
- GENERAL ARRANGEMENT PLAN BLOCK GROUND FLOOR
- GENERAL ARRANGEMENT PLAN BLOCK 1 (P7.2) LEVEL 01 - 04
- GENERAL ARRANGEMENT PLAN BLOCK 1 (P7.2) LEVEL 05
- GENERAL ARRANGEMENT PLAN BLOCK 1 (P7.2) LEVEL 06
- GENERAL ARRANGEMENT PLAN BLOCK 2 (P7.1) BLOCK PLAN GROUND FLOOR
- GENERAL ARRANGEMENT PLAN BLOCK 2 (P7.1) BLOCK PLAN LEVEL 01
- GENERAL ARRANGEMENT PLAN BLOCK 2 (P7.1) LEVEL 02
- GENERAL ARRANGEMENT PLAN BLOCK 2 (P7.1) LEVEL 03
- GENERAL ARRANGEMENT PLAN BLOCK 2 (P7.1) LEVEL 04
- GENERAL ARRANGEMENT PLAN BLOCK 2 (P7.1) LEVEL 05
- GENERAL ARRANGEMENT PLAN BLOCK 2 (P7.1) LEVEL 06
- GENERAL ARRANGEMENT PLAN BLOCK 3 (P6.2) GROUND FLOOR LEVEL
- GENERAL ARRANGEMENT PLAN BLOCK 3 (P6.2) LEVELS 01 - 03
- GENERAL ARRANGEMENT PLAN BLOCK 3 (P6.2) LEVEL 04
- GENERAL ARRANGEMENT PLAN BLOCK 3 (P6.2) 3 LEVEL 05
- GENERAL ARRANGEMENT PLAN BLOCK 3 (P6.2) LEVEL 06
- GENERAL ARRANGEMENT PLAN BLOCK 4 (P6.1) GROUND FLOOR LEVEL
- GENERAL ARRANGEMENT PLAN BLOCK 4 (P6.1) LEVELS 01 - 03
- GENERAL ARRANGEMENT PLAN BLOCK 4 (P6.1) LEVEL 04
- GENERAL ARRANGEMENT PLAN BLOCK 4 (P6.1) LEVEL 05
- GENERAL ARRANGEMENT PLAN BLOCK 4 (P6.1) LEVEL 06
- GENERAL ARRANGEMENT ELEVATIONS SITE WIDE
- BLOCK ELEVATIONS BLOCK 1 (P7.2) NORTH AND EAST ELEVATIONS
- BLOCK ELEVATIONS BLOCK 1 (P7.2) SOUTH AND WEST ELEVATIONS
- BLOCK ELEVATIONS BLOCK 2 (P7.1) NORTH AND EAST ELEVATIONS
- BLOCK ELEVATIONS BLOCK 2 (P7.1) SOUTH AND WEST ELEVATIONS
- BLOCK ELEVATIONS BLOCK 3 (P6.2) NORTH AND EAST ELEVATIONS
- BLOCK ELEVATIONS BLOCK 3 (P6.2) SOUTH AND WEST ELEVATIONS
- BLOCK ELEVATIONS BLOCK 4 (P6.1) NORTH AND EAST ELEVATIONS
- BLOCK ELEVATIONS BLOCK 4 (P6.1) SOUTH AND WEST ELEVATIONS
- SITE WIDE GENERAL ARRANGEMENT SECTIONS
- BLOCK 1 (P7.2) BLOCK SECTIONS
- BLOCK 2 (P7.1) - BLOCK SECTIONS
- BLOCK 3 (P6.2) BLOCK SECTIONS
- BLOCK 4 (P6.1) BLOCK SECTIONS
- APARTMENT TYPES 1 BED 1 PERSON
- APARTMENT TYPES 1 BED 2 PERSON TYPE A
- APARTMENT TYPES 1 BED 2 PERSON TYPE B
- APARTMENT TYPES 1 BED 2 PERSON TYPE C
- APARTMENT TYPES 1 BED 2 PERSON TYPE D
- APARTMENT TYPES 2 BED 3 PERSON TYPE A
- APARTMENT TYPES 2 BED 3 PERSON TYPE B
- APARTMENT TYPES 2 BED 3 PERSON TYPE C
- APARTMENT TYPES 3 BED 4 PERSON TYPE A
- APARTMENT TYPES 3 BED 4 PERSON TYPE B
- APARTMENT TYPES 3 BED 5 PERSON TYPE A
- APARTMENT TYPES 3 BED 5 PERSON TYPE B
- AREA SCHEDULE
- APARTMENT SCHEDULE AND UNIT MIX
- GENERAL ARRANGEMENT PLAN AFFORDABLE PRIVATE RENT UNIT PLAN
- GENERAL ARRANGEMENT EXTERNAL BIN STORES
- PLAZA BIN AND CYCLE STORES
- SUBSTATION AND GENERATOR PLAND AND ELEVATIONS
- AFFORDABLE PRIVATE RENT UNIT PLAN
- AFFORDABLE PRIVATE RENT UNIT PLAN LEVEL 01
- AFFORDABLE PRIVATE RENT UNIT PLAN LEVEL 02
- LANDSCAPE GENERAL ARRANGEMENT PLAN
- LANDSCAPE GENERAL ARRANGEMENT 1ST FLOOR
- LANDSCAPE GENERAL ARRANGEMENT 3RD FLOOR
- LANDSCAPE LEVELS AND DRAINAGE PLAN
- LANDSCAPE PLANTING STRATEGY
- DETAIL PLAN CIVIC SPACE AND PROMENADE
- SOFT LANDSCAPE DETAILS 1 OF 2
- SOFT LANDSCAPE DETAILS 2 OF 2
- COVERING LETTER
- PROPOSED SITE ACCESSES
- VEHICULAR SWEPT PATHS ANALYSIS USING DB32 FIRE APPLIANCE (SHEET 1 2 3)
- VEHICULAR SWEPT PATHS ANALYSIS USING LARGE SIZE CAR (SHEET 1 2 3)
- EXTERIOR LIGHTING CALCULATIONS
- EXTERNAL LIGHTING LAYOUT ISOLINE PLOT
- SITEWIDE COMBINED UTILITIES PLAN
- BELOW GROUND DRAINAGE GENERAL ARRANGEMENT SHEET 1
- BELOW GROUND DRAINAGE GENERAL ARRANGEMENT SHEET 2
- SUDS STRATEGY GENERAL ARRANGEMENT SHEET 1
- SUDS STRATEGY GENERAL ARRANGEMENT SHEET 2
- TYPICAL DRAINAGE DETAILS MISCELLANEOUS
- TYPICAL DRAINAGE DETAILS SHEET 1 OF 3
- TYPICAL DRAINAGE DETAILS SHEET 2 OF 3
- TYPICAL DRAINAGE DETAILS SHEET 3 OF 3
- DESIGN & ACCESS STATEMENT PART1
- DESIGN & ACCESS STATEMENT PART 10
- DESIGN & ACCESS STATEMENT PART 11
- DESIGN & ACCESS STATEMENT PART 2
- DESIGN & ACCESS STATEMENT PART 3
- DESIGN & ACCESS STATEMENT PART 4
- DESIGN & ACCESS STATEMENT PART 5
- DESIGN & ACCESS STATEMENT PART 6
- DESIGN & ACCESS STATEMENT PART 7
- DESIGN & ACCESS STATEMENT PART 8
- DESIGN & ACCESS STATEMENT PART9
- PLANNING DESIGN AND CONFORMITY STATEMENT
- SUSTAINABILITY CONFORMITY STATEMENT
- EXTERNAL LANDSCAPE LIGHTING DESIGN REPORT
- LANDSCAPE MANAGEMENT AND MAINTENANCE PLAN
- SOFT LANDSCAPE AND ECOLOGY SPECIFICATION AND SCHEDULES
- RESIDENTIAL TRAVEL PLAN
- ECOLOGICAL IMPLEMENTATION AND MITIGATIO PLAN
- BOUNDARY PLAN
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with South Cambridgeshire for determination, against a statutory target of eight weeks. Over the last year South Cambridgeshire decided reserved matters applications in a median of 152 days. More in our guide to how long planning decisions take.
About reserved matters applications
A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Waterbeach Barracks Denny End Road Waterbeach Cambridgeshire CB25 9PA
Submission of details required by condition 2 (Restoration of land to former condition) of planning permission 22/04191/FUL
Granted Conditions 7 docs -
Waterbeach Barracks Denny End Road Waterbeach Cambridgeshire CB25 9PA
Temporary siting of two shipping containers for a cafe and toilet block of up to 30sqm of total floorspace, cycle parking with up to 5 spaces, and ancillary works including associated landscaping and utitlities infrastructure - retrospective.
Granted Full applications 12 docs -
Waterbeach Barracks And Airfield Key Phase 1 North And East. Denny End Road Waterbeach Cambridgeshire CB25 9PA
95% historically approved · decision due ~8 Apr
Reserved Matters approval of access, appearance, landscape, layout and scale in respect of works to construct Space for Imaginative Play at Waterbeach Woods, Waterbeach Gardens, Waterbeach Gardens East and Waterbeach Lakeside East, Local Area for Play and Community Play at Waterbeach Gardens East, and Local Equipped Area for Play at Waterbeach Gardens, ground remodelling, and associated works at the existing located at Key Phase 1 of the Waterbeach Barracks and Airfield development (Ref: S/0559/17/OL), including: hard and soft landscaping, land reprofiling, planting, any necessary demolition, areas for construction use and temporary stockpiling, and works to create construction access.
Awaiting decision Reserved matters Demolition 34 docs -
Waterbeach Barracks Denny End Road Waterbeach Cambridgeshire CB25 9PA
Submission of details required by condition 2 (Ecology) of reserved matters application 21/02458/REM
Granted Conditions 10 docs -
Parcels 2.2 And 3.2 Waterbeach Barracks Denny End Road Waterbeach Cambridgeshire
Reserved Matters application (appearance, landscaping, layout and scale) pursuant to outline planning permission ref: S/0559/17/OL for the construction of 198 new dwellings, 391sqm of commercial retail space (Use class E(a)) and associated works.
Granted Reserved matters New dwelling 284 docsMajor scheme -
Parcels 2.2 And 3.2 Waterbeach Barracks Denny End Road Waterbeach Cambridgeshire
94% historically approved · decision due ~19 May
Submission of details required by Condition 2 (Architectural Details) of planning reserved matters application 25/01318/REM.
Awaiting decision Conditions 16 docs
Other reserved matters applications
In South Cambridgeshire
-
26/03359/REM Awaiting decision
Girton College Huntingdon Road Girton Cambridgeshire CB3 0JG
Reserved matters application for approval of appearance, landscaping, layout and scale for the Installation of 1no. informal natural grass pitch and 2no. Multi-Use Games Areas enclosed with ball stop fencing for 2no. tennis courts (with line marking to accommodate netball and pickleball) together with associated landscaping, equipment storage and provision of new pathway to existing Woodland Walk following outline planning permission 22/00887/OUT as varied by 26/01599/S73. The Outline planning application was not an EIA application.
-
26/03381/REM Awaiting decision
9 Soule Croft Gamlingay Cambridgeshire SG19 3FZ
Plot 9 - Reserved matters application for access, appearance, landscaping, layout and scale for the construction of a self/custom build dwelling following outline planning permission 24/01080/OUT (Outline planning application with all matters reserved (except for access, layout of roads and plots) for nine self/custom build residential dwellings (replacement of planning permission S/3170/17/OL)
-
26/00786/REM Granted
Northstowe Phase 2C Rampton Drift Longstanton Cambridgeshire
Reserved Matters application for Parcel 2C to provide 409 dwellings including Discount Market Sale homes, Affordable Rented homes, and Market homes, landscaping, open space including village green, allotments and community orchard, parking and associated infrastructure for access, appearance, landscaping, layout and scale following outline planning permission Ref: S/2011/14/OL, and Discharge of outline conditions 9 (Design Code), 10 (Fire Strategy), 11 (Housing Mix), 12 (Housing Lifetime Home Design Statement), 19 (Detailed Surface Water Drainage Strategy), 20 (Foul Water Strategy), 21 (Adoption of SUDS infrastructure), 23 (Landscape Design and Specifications), 24 (Landscape Management and Maintenance Plan), 26 (Tree Protection Details), 27 (Ecological Management Plan), 32 (Low Carbon Strategy Compliance Statement), 33 (Energy Delivery Strategy), 35 (Water Conservation and Management Scheme), 41 (Artificial Lighting Scheme), 43 (Operational Traffic Noise Mitigation Scheme on-site), 45 (Waste Management and Minimisation Strategy), 48 (Equine, Walking and Cycling Routes), 54 (Electric Vehicle Charging Compliance Statement), 57 (Transport Cycle Parking), 64 (Custom Build Homes), pursuant to outline planning permission Ref: S/2011/14/OL.
-
26/01691/REM Granted
Land North Of Cambridge North Station Milton Avenue Cambridge Cambridgeshire CB4 0AE
Reserved Matters Application for the approval of appearance, layout and scale for 425 residential units and flexible Class E and F floorspace including associated infrastructure, works and landscaping, pursuant to details required by Conditions 36, 39 (part a and b only), 40, 41, 42, 43, 44, 45 and 46 of hybrid planning permission LPA ref: 22/02771/OUT.
-
26/03289/REM Awaiting decision
Sawston Park London Road Pampisford Cambridgeshire CB22 3EE
Reserved matters application for the approval of appearance, landscaping, layout and scale in relation to the hub building following outline planning permission 24/00166/OUT.