  1. 26 May 2026

    Received by South Cambridgeshire

  2. 8 Jul 2026

    Decision issued: Granted Permission

  3. 23 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00585/CONDA Awaiting decision

    2 Old Rectory Drive Dry Drayton Cambridgeshire CB23 8BU

    Submission of details required by conditions 3 (roofs), 4 (windows scale of 1:20), 6 (rainwater goods), 7 (timber framing scale of 1:20), 8 (timber frame members) and 9 (schedule of works) of Listed Building consent 26/00585/LBC

    15 Jul 2026 98m away Conditions
  • 22/03352/OUT Granted

    Land Adj 3 Old Rectory Drive Dry Drayton Cambridge Cambridgeshire CB23 8BU

    Outline planning application with all matters reserved other than access for the erection of a single dwelling.

    22 Jul 2022 150m away Outline
  • 20/01669/NMA1 Granted

    Keepers End Scotland Road Dry Drayton CB23 8BX

    Non material amendment of planning permission 20/01669/HFUL (Refurbishment, external insulation and render cladding with zinc roof. Front ground floor and minor first floor extension. Rear ground floor extension. Minor side storey ground floor extension. Replacement windows throughout. Associated refurbishments throughout and upgrading thermal performance of house to bring it up to the Enerphit standard of low energy refurbishment) Windows - Change in size. Reduction in proposed window sizes to be more similar to existing windows Roof Covering Material - Change from zinc to roof tile. Proposed clay roof tiles to match existing including inset PVs

    8 Dec 2020 206m away Amendments

In South Cambridgeshire

  • 26/02779/FUL Awaiting decision

    3 Royston Road Whittlesford Cambridgeshire CB22 4NW

    3 bedroom replacement self build dwelling following demolition of existing bungalow.

    22 Jul 2026 Full applications
  • 26/02151/FUL Granted

    3 Comberton Road Barton Cambridgeshire CB23 7BA

    Installation of a Solar PV system to the roof pitches of the detached garage outbuilding.

    9 Jun 2026 Full applications
  • 26/01627/FUL Granted

    Valley Farm House Valley Farm Road West Wratting Cambridgeshire CB21 4HH

    Change of use of an agricultural building to uses falling within classes B8 storage/distribution or E(g)(iii) light industrial use.

    29 Apr 2026 Full applications
  • 26/02708/FUL Awaiting decision

    Rectory Farm Middle Street Thriplow Cambridge Cambridgeshire SG8 7RD

    Partial demolition of existing collapsed wall and erection of a new wall.

    17 Jul 2026 Full applications
  • 25/02739/FUL Granted

    Land To The South Of Munceys Farm London Way Melbourn Cambridgeshire SG8 6DJ

    Construction and operation of a 25MW solar photovoltaic farm and a 25MW Battery Energy Storage System (BESS) including access, fencing, CCTV, internal service tracks, ancillary equipment and scheme of landscaping for an operational lifespan of 40 years.

    10 Jul 2025 Full applications