Skip to content
PlanIndex Get alerts
Menu

Planning application

26/01867/FUL

The Common House 9-20 Marmalade Lane Orchard Park Cambridgeshire CB4 2ZE

Awaiting decision South Cambridgeshire Full Application

Proposal

Installation of 12 new domestic heat pumps to replace an existing communal heating system with individual heat pumps for each apartment within the apartment block at Marmalade Lane, and to provide a separate heat pump for the common areas.

As published by the council, reference 26/01867/FUL

Timeline

Dates from the published record

  1. 18 May 2026

    Received by South Cambridgeshire

  2. 27 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with South Cambridgeshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 20/04398/HFUL Granted

    19 Bayford Place Cambridge Cambridgeshire CB4 2UF

    Loft extension with rear dormer.

    23 Oct 2020 157m away Householder
  • 22/01632/NMA1 Granted

    Orchard Park Parcels Com4 And L2 Topper Street Orchard Park Cambridge Cambridgeshire

    Non-material amendment to vary the approved description of ref: 22/01632/FUL to remove 'hotel' and 'basement' from the description to as follows: 'Erection of a mixed-use building (Use Class C1 and Class E) with associated car parking, landscaping and associated works'

    1 May 2026 244m away Amendments
  • S/4191/19/CONDF Decided

    Land To The West Neal Drive Orchard Park Cambridgeshire

    Submission of details required by condition 11 (Biodiversity Enhancement) of planning permission S/4191/19/FL

    26 Sep 2022 353m away Conditions
  • 26/02519/ADV Awaiting decision

    2 Albrach Court Buchan Street Cambridge Cambridgeshire CB4 2ZP

    Installation of a new illuminated fascia sign with external trough lighting.

    2 Jul 2026 472m away Advertising
  • 19/1757/COND32 Awaiting decision

    Buchan Street Neighbourhood Centre 6 Buchan Street Cambridge Cambridgeshire CB4 2XF

    Submission of details required by condition 32 (BREEAM - condition 1) of planning permission 19/1757/FUL

    21 May 2025 486m away Conditions
  • 19/1757/COND34 Decided

    Buchan Street Neighbourhood Centre 6 Buchan Street Cambridge Cambridgeshire CB4 2XF

    Submission of details required by condition 34 (Water efficiency) of planning permission 19/1757/FUL

    1 Aug 2024 486m away Conditions

In South Cambridgeshire

  • 26/02779/FUL Awaiting decision

    3 Royston Road Whittlesford Cambridgeshire CB22 4NW

    3 bedroom replacement self build dwelling following demolition of existing bungalow.

    22 Jul 2026 Full applications
  • 26/02151/FUL Granted

    3 Comberton Road Barton Cambridgeshire CB23 7BA

    Installation of a Solar PV system to the roof pitches of the detached garage outbuilding.

    9 Jun 2026 Full applications
  • 26/01627/FUL Granted

    Valley Farm House Valley Farm Road West Wratting Cambridgeshire CB21 4HH

    Change of use of an agricultural building to uses falling within classes B8 storage/distribution or E(g)(iii) light industrial use.

    29 Apr 2026 Full applications
  • 26/02708/FUL Awaiting decision

    Rectory Farm Middle Street Thriplow Cambridge Cambridgeshire SG8 7RD

    Partial demolition of existing collapsed wall and erection of a new wall.

    17 Jul 2026 Full applications
  • 25/02739/FUL Granted

    Land To The South Of Munceys Farm London Way Melbourn Cambridgeshire SG8 6DJ

    Construction and operation of a 25MW solar photovoltaic farm and a 25MW Battery Energy Storage System (BESS) including access, fencing, CCTV, internal service tracks, ancillary equipment and scheme of landscaping for an operational lifespan of 40 years.

    10 Jul 2025 Full applications